📡 Data & IoT

Sub-Riverine Fiber Connection Ring

Inaugurated in February 2023, this 935 km fiber backbone links Bangui to Cameroon and the Republic of Congo via terrestrial and river crossings, financed by the African Development Bank and the European Union (about $36 million). The government says it will cut national internet costs; independent price data confirming that has not been located.

Live 📅 since 2023

🤖 AI-generated summary of the sources below — how this works · 🔎 Last verified

Scale🌍 National
Cost≈$36M (XAF 22 billion, AfDB + EU)

📖 Terms in this entry: LoRaWAN

Sources

⏳ Ministère des Postes et Télécoms (authority) — link coming soonOfficial national registry detailing structural telecommunications tools.
↗ Wikipedia — Central African BackboneEncyclopedia article with the full story and timeline of the project.

This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

📎 Cite this project

1001 Smart Cities (2026). “Sub-Riverine Fiber Connection Ring” — Bangui, Central African Republic. The Smart City Atlas. https://1001smartcities.org/projects/bangui-telecom-gateway/ (last verified 2026-08-02). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next verified smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS