Mi Teleférico Cable Car Network & Contactless Ticketing

Revision 2026-08-27-claims-and-sources · effective 2026-08-27

Superseded. A later revision exists: 2026-08-27-correction-run →

unreviewed

Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

sha256:e11adfb05d7d31268fcb0f6f8cfa0ba364da400c9c132548c6dcc967078c8cd8

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
6
of 6 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-c7e9651606445a90 quantitative
10 colour-coded lines over 33 km, which Xinhua describes as the world's largest urban cable network
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
'El teleférico, que opera con 10 líneas de colores, conecta a las ciudades de La Paz y El Alto mediante 33 kilómetros de extensión, lo que lo convierte en la red de transporte por cable urbano más grande del mundo.'
Caveat
The superlative is the news agency's, following the operator; no independent register of urban cable networks is cited.

Sources carrying this claim

  1. Xinhua (Spanish service) — La Paz-El Alto urban cable car passes 640 million users in 11 years (2 September 2025)
Claim 2 clm-0d4d55a9c6fca6ec quantitative
It kept running — and added cabins on three lines in May 2026 — while road transport was repeatedly paralysed by blockades and fuel shortages
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Bolivian press in May 2026 on continuing normal operations and extra cabins added on the Green, Silver and Blue lines, quoting the operator's executive manager.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Informe Exclusivo — Mi Teleférico refuerza operaciones con más cabinas (press, May 2026)
Claim 3 clm-e96312c4165e60fb quantitative
A USD 62 million IDB package is to extend the Brown Line and put solar panels on most station roofs; the operator says the Brown Line credit is approved, while the report carrying the figure says the package as a whole still awaits approval by the Plurinational Legislative Assembly
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
eju.tv, 8 July 2026: the standfirst reads 'El proyecto cuenta con un financiamiento de $us 62 millones del BID, recursos que están a la espera de su aprobación en la Asamblea Legislativa Plurinacional', while the operator's executive manager says of the Brown Line continuation that it 'tiene un crédito aprobado en la Asamblea'. Solar panels are planned 'en la mayoría de los techos de las estaciones'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. eju.tv — Plan de ampliación: Línea Café, solar, aeropuerto (press, Jul 2026)
  2. Inter-American Development Bank (authority)
Claim 4 clm-19f209997ca3b2cf quantitative
Mi Teleférico had carried more than 640 million users in a little over 11 years by September 2025, across 10 lines and 33 km
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Xinhua, 2 September 2025: the urban cable car linking La Paz and El Alto has carried more than 640 million users in a little over 11 years of operation, across 10 colour lines and 33 kilometres.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Xinhua (Spanish service) — La Paz-El Alto urban cable car passes 640 million users in 11 years (2 September 2025)
Claim 5 clm-ea12c512a42942e2 quantitative
a USD 62 million IDB package, USD 42 million of it for the Brown Line extension itself plus solar generation at stations, was still awaiting approval by the Plurinational Legislative Assembly when the operator set out the plan in July 2026
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
'La ampliación de la línea como tal demandará 42 millones de dólares y hay un proyecto complementario para el cambio de energía eléctrica' — within a package the same article puts at USD 62 million and describes as awaiting legislative approval.
Caveat
A financing plan, not a delivered result.

Sources carrying this claim

  1. eju.tv — Plan de ampliación: Línea Café, solar, aeropuerto (press, Jul 2026)
Claim 6 clm-a4dfeaa82680b5e8 descriptive
It kept running through blockades and fuel shortages that paralysed road transport, because a cable network's fuel is electricity and its right of way is air
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The May 2026 report records continued operation and extra cabins during the disruption; the July 2026 report describes the plan to move stations onto solar generation and away from grid dependence.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Informe Exclusivo — Mi Teleférico refuerza operaciones con más cabinas (press, May 2026)
  2. eju.tv — Plan de ampliación: Línea Café, solar, aeropuerto (press, Jul 2026)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-27-claims-and-sources effective 2026-08-27 · created 2026-08-27

Awaiting operator and domain-expert review; publication of this revision implies neither.

Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.

  • createdAt previously read 2026-08-29T23:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-27T02:55:34Z on 2026-08-27; evidence: first appears in commit 0f98748c4d, committed 2026-08-27T02:55:34Z.
sha256:e11adfb05d7d31268fcb0f6f8cfa0ba364da400c9c132548c6dcc967078c8cd8
6
of 6 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Mi Teleférico (Empresa Estatal de Transporte por Cable)
Actor types
utility
Funding model
mixed
Funding description
Not recorded
Cost
≈USD 62M IDB package (USD 42M for the Brown Line extension itself, plus station solar), reported in July 2026 as awaiting legislative approval
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

Mi Teleférico (operator) miteleferico.bo · background

Open original source ↗

Stable source ID
src-a259a4ff71cddfe8
Publisher
Name not classified · miteleferico.bo
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The operator's own site. It serves an automated client only a JavaScript application shell, so nothing on it could be quoted here; it is retained as the operator citation.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Inter-American Development Bank (authority) iadb.org · 1 linked claim

Open original source ↗

Stable source ID
src-991c86423adfb395
Publisher
Name not classified · iadb.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

IDB news release on the loan for the Brown Line extension and station solar generation. iadb.org now answers automated clients with a Cloudflare challenge (HTTP 403), so the figures attributed to it rest on an earlier reading and are corroborated where possible by the Bolivian press below.

Descriptive only — not page/paragraph exact
eju.tv — Plan de ampliación: Línea Café, solar, aeropuerto (press, Jul 2026) eju.tv · 3 linked claims

Open original source ↗

Stable source ID
src-21dab96a9ab6f6b6
Publisher
Name not classified · eju.tv
Type / language
web-page · language not classified
Published
2026-07-08
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Published 8 July 2026, quoting Mi Teleférico's executive manager Christian Eduardo Rojas. Carries the USD 62 million IDB package, of which 'la ampliación de la línea como tal demandará 42 millones de dólares', solar panels planned on most station roofs, and an airport link served by four electric buses between the 6 de Marzo station and El Alto international airport. Note the tension inside the piece: the standfirst says the USD 62 million is 'a la espera de su aprobación en la Asamblea Legislativa Plurinacional', while Rojas says the Brown Line credit itself 'tiene un crédito aprobado en la Asamblea'.

Descriptive only — not page/paragraph exact
Informe Exclusivo — Mi Teleférico refuerza operaciones con más cabinas (press, May 2026) informeexclusivo.com.bo · 2 linked claims

Open original source ↗

Stable source ID
src-cafc8ce014fdc4e7
Publisher
Name not classified · informeexclusivo.com.bo
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Bolivian press, May 2026: normal operations continuing and extra cabins added on the Green, Silver and Blue lines, with a quote from the operator's executive manager.

Descriptive only — not page/paragraph exact
Xinhua (Spanish service) — La Paz-El Alto urban cable car passes 640 million users in 11 years (2 September 2025) spanish.news.cn · 2 linked claims

Open original source ↗

Stable source ID
src-cd4df9e6b9e8cbde
Publisher
Name not classified · spanish.news.cn
Type / language
web-page · language not classified
Published
2025-09-02
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Xinhua's Spanish service, dateline La Paz 1 September 2025. The ridership figure and the superlative in one place: the system 'opera con 10 líneas de colores, conecta a las ciudades de La Paz y El Alto mediante 33 kilómetros de extensión, lo que lo convierte en la red de transporte por cable urbano más grande del mundo', has carried more than 640 million users in 11 years, and completed its network with the Silver line in March 2019. Also the fares: preferential rates of 1.50 and 1 boliviano, against operator estimates that privatisation could multiply fares up to eightfold, to 20-25 bolivianos (USD 2.9-3.6).

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.