clm-722a616e304b2341
quantitative
an on-board location and communications unit plus driver console on 139 buses
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-08-06
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 13 claims and 6 source dossiers.
sha256:e1d01c5de7d13072379f14b9c0cee251df5059062cfe5d43e76fd0ac18db28c0
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-722a616e304b2341
quantitative
an on-board location and communications unit plus driver console on 139 buses
clm-79e86d38a3345a3e
quantitative
127 passenger information displays at stations
clm-c62a61aa210b87d3
quantitative
validators at 150 stations
clm-92b1e0ed824ef477
descriptive
a fleet-management and ticketing control centre
clm-c351918874130f24
descriptive
Ahmedabad Janmarg Limited, a wholly owned company of the municipal corporation
clm-51fdc6604772706f
quantitative
says it was the first Indian bus operator to replace paper tickets with contactless smartcards, in January 2012
clm-b58a5685022d03dd
descriptive
A public portal today plots live bus positions on a map with predicted arrival times
clm-fbb363bd0ab4ff1a
quantitative
the ₹186 crore Integrated Transit Management System now covers the BRTS and the AMTS city bus fleet on one backbone
clm-a2da102a38e961f8
quantitative
Signal priority for the buses was demonstrated on the corridor in 2022
clm-5da940ddc38ab005
descriptive
no source confirms it in regular service
clm-b100c88f0aac062c
quantitative
was discontinued on 31 December 2025
clm-8b6c44b76cfabbc9
descriptive
while the operator's own older website still lists it as the way to pay
clm-a84ef78776a01ef2
descriptive
a locator on every bus reporting to one room
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:e1d01c5de7d13072379f14b9c0cee251df5059062cfe5d43e76fd0ac18db28c0
src-c97cbb058fd4cbcdCarries the hardware counts. Verbatim: 'FMS on-board equipment for 139 buses: on-board location and communications unit, driver console'; 'Passenger information system: 127 information displays at stations'; 'Ticketing system at BRTS stations: 150 stations equipped with validators for access control'; 'FMS and ticketing control center'. Also carries the smartcard superlative as an attributed operator quote: '«With the launch of the Smart Card System in Ahmedabad BRTS, we are the first in India to introduce a Smart Card System in bus services» Shri Harsadrai J. Solanki, General Manager, Ahmedabad Janmarg Limited'. Supplier marketing — treat the superlative as the operator's claim, not a verified fact.
src-c0532443f056ebbbDescribes the ITMS umbrella and the command control centre where 'All data is collected and collated'. Verbatim on the card: 'In January 2012, the Ahmedabad BRTS became the first bus system in India to replace paper tickets with contactless smartcards.' NOTE: this legacy operator site is out of date — its 'BRTS in Numbers' page still advertises 'Cashless ticket purchase through Janmitra card', which was discontinued at the end of 2025, and still says 50 electric buses where the current site says 150.
src-9c99aac7a96a767cThe whole page reads: 'Janmitra Card Update — The ICICI Bank Janmitra Card has been discontinued effective 31st December 2025.'
src-e99a05870677f6d9Evidence the AVL layer is live and public today: a per-stop query returns route, vehicle reference, expected arrival and departure times and 'arriving in N minutes', with vehicle positions drawn on a Leaflet/OpenStreetMap map. The portal's licence dialog names the licensee as 'Smart City Ahmedabad Development Limited', confirming SCADL runs the commuter-facing side.
src-d4a61146334efca8Verbatim: 'Integrated Transit Management System (ITMS) is a project with a total cost of 186 crores providing a common IT Backbone for real-time monitoring of both BRTS ... and AMTS fleets'. The Automated Fare Collection entry says a single National Common Mobility Card standard card is 'proposed' — i.e. not yet asserted as delivered.
src-07882ec23de6f2f8The only Ahmedabad signal-priority evidence found: a 2022 demonstration in which a bus on the BRTS corridor talks to junction signals. A vendor press release about a demonstration — this is why the entry says 'demonstrated', not 'deployed'.