Ports of Auckland's Abandoned Container-Terminal Automation
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
14 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Auckland's port bought 27 automated straddle carriers to grow its terminal upward instead of outward. Six years on it wrote off $65 million and went back to manual operation.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,216 documented projects · 🏙️ 9 more in Auckland · 🚗 Autonomous vehicles guide · 🚲 Mobility projects
In August 2016 Ports of Auckland, the company wholly owned by Auckland Council, announced it would partially automate its Fergusson Container Terminal by 2019, saying capacity would rise from just over 900,000 TEU a year to 1.6-1.7 million TEU without further reclamation. The first phase went live in June 2020 with 27 automated Konecranes straddle carriers supervised by TBA software. On 17 June 2021 a software fault made a container carried by an automated straddle hit a stacked container, and automated operations were paused. In June 2022 the board cancelled the project because the system was not performing to expectations, wrote off approximately $65 million, mainly the automation software and guidance system, and returned the terminal to fully manual operation.
📊 Impact
The capacity gain did not arrive. The terminal handled 811,565 TEU in the year to June 2022, against 818,238 a year earlier and 973,722 in the year to June 2018. For the year to June 2022 the port reported a $10.3 million loss after a $63.1 million write-off on the project, against a $45.57 million profit the year before. The new wharf and cranes built alongside the automation were kept. No study located separates the project's effect on volumes from the other pressures of those years.
🎓 Lesson
The independent governance review the board commissioned at the council's request located the failure in procurement and oversight rather than in the machines: the vendor selection process was not sufficiently well-structured, the chosen vendor had been working with the company as a consultant since 2012, the contract was negotiated without any adequate software performance guarantees, and the board did not take the steps necessary to understand the risks. A council-ordered health and safety review had found in March 2021 that the automation project was unable to make a robust safety case for the automated straddles. Public ownership did not supply the missing check: under the Port Companies Act the shareholder has limited ability to intervene, and when the decision was made an intermediary company kept the port at arm's length from council oversight.
Sources
Show 5 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: 2016–2022. 10 of 10 sources carry a publication date, from 13 August 2016 to May 2023.
When the sources were published
- The Maritime Executive · pressMaritime Executive — Auckland to Automate Container Terminal (13 Aug 2016)
- Konecranes · vendorKonecranes — Milestone Konecranes automation project goes live at Ports of Auckland (6 Nov 2020)
- 1News (TVNZ) · press1News — Ports of Auckland's automation dream revised (3 Aug 2021)
- interest.co.nz · pressinterest.co.nz — The Auckland port has ditched the troubled six-year project to automate its container terminal (8 Jun 2022)
- Auckland Council · city governmentAuckland Council — Auckland Council Seeks Review Of Ports Of Auckland Automation Project (8 Jun 2022, via Scoop)
- interest.co.nz · pressinterest.co.nz — Ports of Auckland has sailed into the red in the latest financial year (31 Aug 2022)
- Newstalk ZB · pressNewstalk ZB (NZ Herald) — Auckland port posts loss but expects smoother sailing (31 Aug 2022)
- The New Zealand Herald · pressNZ Herald — Damning report on Auckland port's automation project finds multiple failures (20 Sep 2022)
Show 2 more dated sourcesShow fewer
- Newsroom · pressNewsroom — Ousted Ports of Auckland boss hits back, ahead of court hearing (29 Sep 2022)
- International Transport Workers' Federation · ngoInternational Transport Workers' Federation — Lessons in Failure: Automation at the Port of Auckland (May 2023)
Show your work What this page rests on and what it can’t tell you · all 14 claims with their sources · the forensic record
Evidence file · public beta 14 addressable claims, 10 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 14
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-1dcfc64d79024f32
quantitative
In August 2016 Ports of Auckland, the company wholly owned by Auckland Council, announced it would partially automate its Fergusson Container Terminal by 2019
Sources carrying this claim
clm-5f1d6f56d31f8b36
quantitative
saying capacity would rise from just over 900,000 TEU a year to 1.6-1.7 million TEU without further reclamation
Sources carrying this claim
clm-764ce6d618af83fe
quantitative
The first phase went live in June 2020 with 27 automated Konecranes straddle carriers supervised by TBA software.
Sources carrying this claim
clm-4608c2390cad3daa
quantitative
On 17 June 2021 a software fault made a container carried by an automated straddle hit a stacked container, and automated operations were paused.
Sources carrying this claim
clm-caffcff3230e3dbe
quantitative
In June 2022 the board cancelled the project because the system was not performing to expectations
Sources carrying this claim
clm-168739d5556b02c2
quantitative
wrote off approximately $65 million, mainly the automation software and guidance system, and returned the terminal to fully manual operation
Sources carrying this claim
clm-23ad4c11a2851efe
quantitative
The capacity gain did not arrive. The terminal handled 811,565 TEU in the year to June 2022, against 818,238 a year earlier and 973,722 in the year to June 2018.
Sources carrying this claim
clm-0573599f1d579e97
quantitative
For the year to June 2022 the port reported a $10.3 million loss after a $63.1 million write-off on the project, against a $45.57 million profit the year before.
Sources carrying this claim
clm-86047d087888a9a7
descriptive
The new wharf and cranes built alongside the automation were kept.
Sources carrying this claim
clm-829c09e83d81274f
descriptive
The independent governance review the board commissioned at the council's request located the failure in procurement and oversight rather than in the machines
Sources carrying this claim
clm-5daadebc028c0ca9
quantitative
the vendor selection process was not sufficiently well-structured, the chosen vendor had been working with the company as a consultant since 2012, the contract was negotiated without any adequate software performance guarantees
Sources carrying this claim
clm-f3c231160bed8d79
descriptive
the board did not take the steps necessary to understand the risks
Sources carrying this claim
clm-5fdaf2e5c9a9a83c
quantitative
A council-ordered health and safety review had found in March 2021 that the automation project was unable to make a robust safety case for the automated straddles.
Sources carrying this claim
clm-12b81b6f1e422791
descriptive
Public ownership did not supply the missing check: under the Port Companies Act the shareholder has limited ability to intervene, and when the decision was made an intermediary company kept the port at arm's length from council oversight
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:ea6aa5149125bdddac49d81036af663e30b78a228cf1c1f476680d61b23c0803
- 14
- of 14 claims mapped
- 10
- source dossiers
- 9
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Ports of Auckland Ltd (company wholly owned by Auckland Council); automated straddle carriers by Konecranes, terminal and equipment-control software by TBA Group
- Actor types
- city-government, private
- Funding model
- public
- Funding description
- Ports of Auckland Ltd's own balance sheet; the company is wholly owned by Auckland Council
- Cost
- Approximately NZ$65 million written off in June 2022 (NZ$63.1 million in the FY2022 accounts); no audited total for the automation project was located
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
10 source dossiers
Maritime Executive — Auckland to Automate Container Terminal (13 Aug 2016)
- Stable source ID
src-8bb8df7aeb4df847- Publisher
- Name not classified · maritime-executive.com
- Type / language
- web-page · language not classified
- Published
- 2016-08-13
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Trade-press report of the port's August 2016 announcement, quoting chief executive Tony Gibson: partial automation of the container terminal, complete in 2019, with automated straddle carriers working the truck grid and yard while stevedores keep driving between yard and cranes; capacity from just over 900,000 TEU to 1.6-1.7 million TEU a year because the port cannot expand through reclamation; around 50 stevedoring roles could go; the port's claim to be the first New Zealand port and only the third straddle-carrier terminal in the world to automate.
- Claims linked
Konecranes — Milestone Konecranes automation project goes live at Ports of Auckland (6 Nov 2020)
- Stable source ID
src-6a3d08de81dbf0f6- Publisher
- Name not classified · investors.konecranes.com
- Type / language
- web-page · language not classified
- Published
- 2020-11-06
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The equipment supplier's release: the first phase went live in June 2020; by September 26 ships had been served by a blended fleet of 24 enhanced manual straddle carriers and 27 new automated Konecranes Noell straddle carriers, supervised through TBA's TEAMS equipment control system; it gives the capacity aim as about 900,000 to 1.4 million TEU a year. Vendor material, cited for the go-live date and fleet composition.
- Claims linked
1News — Ports of Auckland's automation dream revised (3 Aug 2021)
- Stable source ID
src-74a9b6f1c0fc1cd4- Publisher
- Name not classified · 1news.co.nz
- Type / language
- web-page · language not classified
- Published
- 2021-08-03
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reports that phase one had handled over 100 ships but that speed and reliability were not yet up to expectations; that on 17 June 2021 a software fault caused a container carried by an automated straddle to hit a stacked container and the port paused automated operations; and the revised four-stage plan with a go-live judged achievable by late March 2022.
- Claims linked
interest.co.nz — The Auckland port has ditched the troubled six-year project to automate its container terminal (8 Jun 2022)
- Stable source ID
src-88011929c538f88d- Publisher
- Name not classified · interest.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-06-08
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Carries the port's cancellation statement verbatim: the board chair's reasons (continuing delays, the system not performing to expectations, no confidence in timeline or cost to completion), two independent expert assessments that both said much more money and time were needed, the write-off of approximately $65 million 'mainly the automation software and guidance system', the retained new wharf and cranes, and the return to fully manual operation.
Auckland Council — Auckland Council Seeks Review Of Ports Of Auckland Automation Project (8 Jun 2022, via Scoop)
- Stable source ID
src-1ef4fe616c7c0f98- Publisher
- Name not classified · scoop.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-06-08
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The sole shareholder's statement on the day of cancellation: Mayor Phil Goff calls it wasted expenditure of around $65 million, says the board is responsible under the Port Companies Act and the shareholder has limited ability to intervene, that Auckland Council Investments Ltd kept the port at arm's length at the time of the decision, and asks the board for a review of the process.
- Claims linked
interest.co.nz — Ports of Auckland has sailed into the red in the latest financial year (31 Aug 2022)
- Stable source ID
src-f9dea3cdd2c60db6- Publisher
- Name not classified · interest.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-08-31
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reports the annual result for the year to 30 June 2022: a $10.3 million loss against a $45.57 million profit a year earlier, after a $63.1 million write-off on the axed automation project.
- Claims linked
Newstalk ZB (NZ Herald) — Auckland port posts loss but expects smoother sailing (31 Aug 2022)
- Stable source ID
src-7d0a8ff821aa866d- Publisher
- Name not classified · newstalkzb.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-08-31
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Same annual result, adding container volume: 811,565 TEU in the year to June 2022 against 818,238 a year earlier.
- Claims linked
NZ Herald — Damning report on Auckland port's automation project finds multiple failures (20 Sep 2022)
- Stable source ID
src-4c9d89e8821bf94e- Publisher
- Name not classified · nzherald.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-09-20
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Quotes the independent governance review by Mark Binns, appointed by the port board at the council's request: vendor selection not sufficiently well-structured, an unsatisfactory business case, a contract without adequate software performance guarantees, a chosen vendor that had worked for the port as a consultant since 2012, lacking governance around contractual milestones, and the conclusion that the board did not take the steps necessary.
International Transport Workers' Federation — Lessons in Failure: Automation at the Port of Auckland (May 2023)
- Stable source ID
src-9c65a6ec936d3adc- Publisher
- Name not classified · munz.org.nz
- Type / language
- pdf · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
A research report commissioned by the dockworkers' section of a global transport union federation, published by the Maritime Union of New Zealand. Cited for its quotation of the March 2021 council-ordered health and safety review ('the automation project is unable to make a robust safety case'), its statement that no one was hurt by the automated straddles, and its table of the port's container volumes, 973,722 TEU in the year to June 2018. An advocate's account; its cost estimates are not used here.
- Claims linked
Newsroom — Ousted Ports of Auckland boss hits back, ahead of court hearing (29 Sep 2022)
- Stable source ID
src-5d7d0d08013d260c- Publisher
- Name not classified · newsroom.co.nz
- Type / language
- web-page · language not classified
- Published
- 2022-09-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Interview with former chief executive Tony Gibson, who rejects the Binns review point by point: he says the reviewer did not interview the software vendor TBA and that software performance guarantees of the kind expected do not exist in the ports industry; the article describes the review as a two-and-a-half-page summary and quotes its finding that changing the acceptance testing was 'incomprehensible'.
- Claims linked
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Ports of Auckland's Abandoned Container-Terminal Automation” — Auckland, New Zealand. The Smart City Atlas. https://1001smartcities.org/projects/auckland-ports-automation/ (last verified 2026-10-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
