Vector: Auckland's Trust-Owned Power Network and the Smart Meters It Does Not Own
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
15 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Auckland's power lines belong to a consumer trust. The network company says it owns zero of the meters on them, and in 2025 still got their readings only once a month.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,216 documented projects · 🏙️ 9 more in Auckland · 🔌 Smart grid & energy guide · ⚡ Energy projects
Vector runs the electricity lines in the Auckland region, more than 600,000 connections, and is 75.1% owned by Entrust, a trust holding the shares for 372,000 households and businesses in central, east and south Auckland; North Shore and West Auckland customers on the same lines sit outside its district. Through its PRISMED project (2023) Vector gathers half-hourly readings from customers' smart meters into a curated data store dating back to January 2017, used to model transformer loads, detect unregistered solar panels and electric cars and, in trials, spot low-voltage outages before customers report them. The counterweight is ownership. A 2022 Vector slide reads "Number of meters we own… Zero", and the data, as of October 2025, still arrived only monthly.
📊 Impact
Vector's key-findings report to the Commerce Commission (February 2024) reports no measured savings: it says half-hour load profiles had been built for every distribution transformer for the past three years and that the data made new-connection site investigations quicker and less costly, without giving a figure. Its meter-ping outage trial reached up to 95% accuracy in the best run, with many trials lower, and only about 180,000 of its 600,000-plus connections have meters that can be pinged. In October 2025 Vector told the Electricity Authority that a significant share of the ageing meter fleet on its network cannot send operational data such as voltage, so coverage of the whole network is unlikely before 2030. Approving $237,000 that month for a local flexibility-market platform, the Commerce Commission recorded Vector's own view that the scale of available flexible resource is uncertain.
🎓 Lesson
Owning the lines is not owning the data. A consumer trust controls Vector, yet the network company cannot appoint the metering providers on its own lines and reads its customers' consumption only through contracts with each retailer and metering provider. Vector's own metering arm is a separate business: half of Vector Metering was sold to QIC Private Capital in June 2023. Progress came from rule changes, not ownership: the Electricity Authority let distributors combine consumption data with other datasets only from 25 November 2024. What a meter can report is fixed when someone other than the network buys it.
Sources
Show 5 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2023. 8 of 10 sources carry a publication date, from 25 November 2022 to 17 October 2025.
When the sources were published
- Vector · utilityVector (Chris Franks) — Vector's consumption data journey: Towards 100% coverage, AIMF presentation (25 Nov 2022)
- Vector · utilityVector — Application for the Innovation Project Allowance: PRISMED (May 2023)
- Vector · utilityVector — Completion of sale of 50% interest in Vector Metering (30 Jun 2023)
- iStart · pressiStart — Vector big data project scoops $750,000 ComCom funding
- Vector · utilityVector — Key findings of Vector's innovation project PRISMED, submission to the Commerce Commission (5 Feb 2024)
- Electricity Authority · oversight bodyElectricity Authority — Electricity Industry Participation Code Amendment (Distributor Agreement Amendments) 2024
- Commerce Commission · oversight bodyCommerce Commission — Approval of Vector's application for the Innovation and Non-traditional Solutions Allowance (6 Oct 2025)
- Vector · utilityVector — Response to Exploring network visibility discussion paper (17 Oct 2025)
Show your work What this page rests on and what it can’t tell you · all 15 claims with their sources · the forensic record
Evidence file · public beta 15 addressable claims, 10 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 15
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2ecac5ed0783c4e1
quantitative
Vector runs the electricity lines in the Auckland region, more than 600,000 connections
Sources carrying this claim
clm-88d90aa98d848e21
quantitative
is 75.1% owned by Entrust, a trust holding the shares for 372,000 households and businesses in central, east and south Auckland
Sources carrying this claim
clm-5ef6441816bb62e0
descriptive
North Shore and West Auckland customers on the same lines sit outside its district
Sources carrying this claim
clm-6e737b7bfd48a28d
quantitative
Through its PRISMED project (2023) Vector gathers half-hourly readings from customers' smart meters into a curated data store dating back to January 2017
Sources carrying this claim
clm-933c2ea48fae5e01
descriptive
used to model transformer loads, detect unregistered solar panels and electric cars and, in trials, spot low-voltage outages before customers report them
Sources carrying this claim
clm-910d54e67e55d951
quantitative
A 2022 Vector slide reads "Number of meters we own… Zero"
Sources carrying this claim
clm-9768d038ea1f2456
quantitative
the data, as of October 2025, still arrived only monthly
Sources carrying this claim
clm-29759fd7669c898d
quantitative
Vector's key-findings report to the Commerce Commission (February 2024) reports no measured savings: it says half-hour load profiles had been built for every distribution transformer for the past three years and that the data made new-connection site investigations quicker and less costly, without giving a figure
Sources carrying this claim
clm-1c69fb8bb0526b28
quantitative
Its meter-ping outage trial reached up to 95% accuracy in the best run, with many trials lower, and only about 180,000 of its 600,000-plus connections have meters that can be pinged
Sources carrying this claim
clm-c7be4422f543cd0a
quantitative
In October 2025 Vector told the Electricity Authority that a significant share of the ageing meter fleet on its network cannot send operational data such as voltage, so coverage of the whole network is unlikely before 2030
Sources carrying this claim
clm-51c00c3ce0538d10
quantitative
Approving $237,000 that month for a local flexibility-market platform, the Commerce Commission recorded Vector's own view that the scale of available flexible resource is uncertain
Sources carrying this claim
clm-8aec0f7b7b0e4031
descriptive
A consumer trust controls Vector, yet the network company cannot appoint the metering providers on its own lines and reads its customers' consumption only through contracts with each retailer and metering provider
Sources carrying this claim
clm-113161989592f4af
quantitative
half of Vector Metering was sold to QIC Private Capital in June 2023
Sources carrying this claim
clm-ae47e560eaa5299e
quantitative
the Electricity Authority let distributors combine consumption data with other datasets only from 25 November 2024
Sources carrying this claim
clm-868716fb1a8d4401
descriptive
What a meter can report is fixed when someone other than the network buys it.
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:5d320a8b4e58d7e7e132c0f5492cea46136108937b634c08103dbef5d24e19b0
- 15
- of 15 claims mapped
- 10
- source dossiers
- 7
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Vector Ltd (electricity distribution), 75.1% owned by the Entrust consumer trust; meters owned by retailer-appointed metering providers
- Actor types
- utility, private
- Funding model
- utility
- Funding description
- Vector's regulated network revenue; the Commerce Commission's innovation allowance covered $759,000 (50%) of PRISMED and approved $237,000 for a local flexibility-market platform in October 2025
- Cost
- PRISMED NZ$1,518,000 (2023 application), half recovered through the Commerce Commission's innovation allowance
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
10 source dossiers
Entrust — Who we are
- Stable source ID
src-bb63e5f22890a2aa- Publisher
- Name not classified · entrustnz.co.nz
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The trust's own account: established in 1993 out of the Auckland Electric Power Board; acts for 372,000 households and businesses in central, east and south Auckland; its key asset is a 75.1% shareholding in Vector, with two trustee directors on Vector's board; Vector acquired UnitedNetworks (North Shore and Waitakere lines) in 2002 and floated 24.9% of its shares in 2005.
Entrust — Information on Entrust (dividend FAQ)
- Stable source ID
src-af5323969c3d3f3f- Publisher
- Name not classified · entrustnz.co.nz
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Explains why the Entrust dividend goes only to people in the Entrust district, not the whole of Auckland: in the former Waitemata Electric Power Board area (North Shore, West Auckland, Orewa, Whangaparoa), now part of Vector, consumers were given shares instead of a trust.
- Claims linked
Vector (Chris Franks) — Vector's consumption data journey: Towards 100% coverage, AIMF presentation (25 Nov 2022)
- Stable source ID
src-2117fa23ea20d67c- Publisher
- Name not classified · papers.conference.eea.co.nz
- Type / language
- pdf · language not classified
- Published
- 2022-11-25
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vector presentation to the Advanced Industry Metering Forum. States 600k ICPs on the network and 'Number of meters we own… Zero'; 99% of ICPs under contract with data received for 82%; historic data back to 2017; half-hourly consumption data delivered monthly; power-quality data received on a trial basis; and the history of restrictive retailer data terms since 2013.
Vector — Application for the Innovation Project Allowance: PRISMED (May 2023)
- Stable source ID
src-858dcac675e14f2f- Publisher
- Name not classified · blob-static.vector.co.nz
- Type / language
- pdf · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vector's application for the Commerce Commission's innovation allowance. States total PRISMED costs of $1,518,000 and a drawdown of $759,000 (50%); contracts with retailers covering 99% of ICPs and over 87% of the kWh data received; a curated data store updated monthly, dating back to January 2017; describes the new process as giving 'near real-time' access, while its own phasing table lists a future move from monthly to daily delivery.
- Claims linked
Vector — Key findings of Vector's innovation project PRISMED, submission to the Commerce Commission (5 Feb 2024)
- Stable source ID
src-f2f2e7df8ba03e0a- Publisher
- Name not classified · blob-static.vector.co.nz
- Type / language
- pdf · language not classified
- Published
- 2024-02-05
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vector's required key-findings report. States approval of the allowance on 23 November 2023; the models built (unregistered PV, EV detection, transformer peak demand); half-hour load profiles for all distribution transformers for the past 3 years; quicker and less costly connection investigations (no figure); +600k ICPs in the Auckland region, of which approximately 180k can be pinged; best ping trial up to 95% accuracy with many trials lower.
iStart — Vector big data project scoops $750,000 ComCom funding
- Stable source ID
src-f8c636d5081f4e62- Publisher
- Name not classified · istart.co.nz
- Type / language
- web-page · language not classified
- Published
- 2024-01-16
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Trade press (Heather Wright). Reports Vector as the first recipient of the Commerce Commission's innovation project allowance, $759,000 as a 50 percent claw-back of a $1.5 million investment, and data from smart meters covering 87 percent of the network; relies on Vector's statements.
- Claims linked
- Background source; no baseline claim points here
Vector — Completion of sale of 50% interest in Vector Metering (30 Jun 2023)
- Stable source ID
src-aead87f54c41c0dd- Publisher
- Name not classified · vector.co.nz
- Type / language
- web-page · language not classified
- Published
- 2023-06-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Market release: the sale of a 50% interest in Vector's New Zealand and Australian metering business (Vector Metering) to vehicles managed by QIC Private Capital Pty Limited, announced 21 December 2022, was completed on 30 June 2023; Entrust's voting rights are 75.1%.
- Claims linked
Electricity Authority — Electricity Industry Participation Code Amendment (Distributor Agreement Amendments) 2024
- Stable source ID
src-28f2361dc2ddfd84- Publisher
- Name not classified · ea.govt.nz
- Type / language
- web-page · language not classified
- Published
- 2024-10-11
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The regulator's record of the amendment (made 11 October 2024, in force 25 November 2024): distributors may combine consumption data with other data or databases without the relevant trader's prior agreement, subject to requirements.
- Claims linked
Commerce Commission — Approval of Vector's application for the Innovation and Non-traditional Solutions Allowance (6 Oct 2025)
- Stable source ID
src-36fef837bf636495- Publisher
- Name not classified · comcom.govt.nz
- Type / language
- pdf · language not classified
- Published
- 2025-10-06
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The regulator approves recovery of $237,000 for Vector's local flexibility market platform with Our Energy and other distributors, and records that it is not yet clear there is enough flexibility to defer investment, 'with Vector indicating that the scale of available flexible resource is uncertain'.
- Claims linked
Vector — Response to Exploring network visibility discussion paper (17 Oct 2025)
- Stable source ID
src-07060c47a4dbd9e8- Publisher
- Name not classified · ea.govt.nz
- Type / language
- pdf · language not classified
- Published
- 2025-10-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-15
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vector's submission to the Electricity Authority. States that the default agreement only provides monthly access to consumption data; that monthly delivery is too late for operational uses; that data comes from retailers, their metering providers, or not at all from smaller retailers; that distributors do not appoint metering providers; and that much of the ageing meter fleet cannot provide operational data, so full-network coverage is unlikely before 2030.
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Vector: Auckland's Trust-Owned Power Network and the Smart Meters It Does Not Own” — Auckland, New Zealand. The Smart City Atlas. https://1001smartcities.org/projects/auckland-vector-smart-meter-data/ (last verified 2026-10-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
