NOX-Block Lamppost EV Charging
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Updated 21 Aug 2026 Publication date recorded for 4 sources. · 2 revisions in all What changed →
Under Germany's federal Clean Air programme, Dortmund led the three-city NOX-Block project with Schwerte and Iserlohn: build EV charging into existing streetlights where residents park at the kerb, backed by a federal subsidy of about €10 million (about $11 million). The first lamppost charger went live in December 2019; by late 2022 utility DEW21 and contractor SPIE had 320 points running at up to 11 kilowatts, while TU Dortmund and the University of Wuppertal studied the effects on the grid. The 2021 rollout announcement had spoken of up to 500 points for Dortmund; completion reports count 320 and declare the goals met, without explaining the gap. The chargers still run as ordinary DEW21 infrastructure, and in summer 2025 the utility extended the kerbside idea with charging curbstones on Betenstraße — ten units that logged over 3,000 charging sessions at about 5.5 percent utilisation.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →🎓 Lesson
The interesting number in kerbside charging is not the count of points but the utilisation the operator is willing to publish — DEW21 frames 5.5 percent as a very good value for inner-city charging, which tells you what success in this genre honestly looks like.
Sources
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2019. 3 of 4 sources carry a publication date, from 30 July 2021 to 29 May 2026.
When the sources were published
- electrive · presselectrive — Aufbau von 320 Laternen-Ladepunkten gestartet
- ElektroMobilität.NRW (NRW.Energy4Climate) · regional governmentElektromobilität.NRW — Alle 320 Laternenlader installiert
- Ruhr Nachrichten · pressRuhr Nachrichten — DEW21 baut Ladebordsteine aus
What happened to this record
Show your work What this page rests on and what it can’t tell you · all 10 claims with their sources · the forensic record
Evidence Passport · public beta 10 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 10
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-02626a76c377b780
descriptive
Dortmund led the three-city NOX-Block project with Schwerte and Iserlohn
Sources carrying this claim
clm-08083e27cca129fb
quantitative
a federal subsidy of about €10 million
Sources carrying this claim
clm-887ae20f32eb12c0
quantitative
The first lamppost charger went live in December 2019
Sources carrying this claim
clm-bb9883b8e054a015
quantitative
by late 2022 utility DEW21 and contractor SPIE had 320 points running at up to 11 kilowatts
Sources carrying this claim
clm-73da2284f3ae4d5a
descriptive
TU Dortmund and the University of Wuppertal studied the effects on the grid
Sources carrying this claim
clm-f7a856bdcb05a281
quantitative
The 2021 rollout announcement had spoken of up to 500 points for Dortmund
Sources carrying this claim
clm-8b647f0167e8db10
quantitative
completion reports count 320 and declare the goals met, without explaining the gap
Sources carrying this claim
clm-97c58deeb3d15cfe
quantitative
in summer 2025 the utility extended the kerbside idea with charging curbstones on Betenstraße
Sources carrying this claim
clm-a2eb408ccb197387
quantitative
ten units that logged over 3,000 charging sessions at about 5.5 percent utilisation
Sources carrying this claim
clm-9639c0d794929877
quantitative
DEW21 frames 5.5 percent as a very good value for inner-city charging
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:de41979cf778112f97726850edd718e7cc7d8618927c74cf83102e797261cd8e
- 10
- of 10 claims mapped
- 4
- source dossiers
- 3
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- DEW21 with SPIE Deutschland & Zentraleuropa (StraBelDo consortium)
- Actor types
- utility, city-government
- Funding model
- grant
- Funding description
- Federal 'Sofortprogramm Saubere Luft' — ≈€10M for the three-city project
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
electrive — Aufbau von 320 Laternen-Ladepunkten gestartet
- Stable source ID
src-d38127e22463ef43- Publisher
- Name not classified · electrive.net
- Type / language
- web-page · language not classified
- Published
- 2021-07-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Trade press at rollout start, July 2021: 680 points planned across three cities (500 Dortmund, 100 Schwerte, 80 Iserlohn), ≈€10M federal funding, StraBelDo consortium (DEW21 + SPIE), Ebee hardware, TU Dortmund and BU Wuppertal as research partners.
Elektromobilität.NRW — Alle 320 Laternenlader installiert
- Stable source ID
src-2b633157ae392e06- Publisher
- Name not classified · elektromobilitaet.nrw
- Type / language
- web-page · language not classified
- Published
- 2022-11-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
State e-mobility agency on completion: first charger December 2019, all 320 installed by late 2022, 11 kW, on time and on budget per the project; grid-impact research role of the universities.
Ruhr Nachrichten — DEW21 baut Ladebordsteine aus
- Stable source ID
src-4ac3ac91e3ad9cb8- Publisher
- Name not classified · ruhrnachrichten.de
- Type / language
- web-page · language not classified
- Published
- 2026-05-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Local press, 2025/26: ten charging curbstones on Betenstraße since summer 2025, over 3,000 sessions, ≈5.5% utilisation described as a very good value, comparable to the existing lamppost points.
Stadt Dortmund — Projekt NOX-Block
- Stable source ID
src-72005050817d18a8- Publisher
- Name not classified · dortmund.de
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City project page (authority). The site blocks automated retrieval; project facts here are cross-checked against the trade and state-agency sources above.
- Claims linked
- Background source; no baseline claim points here
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
The kerbside plug, and the number nobody publishes
Where residents park on the street, charging has to go into the street furniture. All four did that. Only one of them says how often the plugs are actually used — which is the number the whole genre turns on.
| Project | Since | Status | Outcome | Evidence | Run by | Cost | Who built it, and what they admit |
|---|---|---|---|---|---|---|---|
| NOX-Block Lamppost EV ChargingDortmund, 🇩🇪 | 2019 | Live | Ongoing | Official | Utility or public operator, City government | not public | The utility built it into existing streetlights on a federal grant, and then published utilisation — calling five and a half per cent a very good inner-city value. |
| Sharing Cities — Greenwich Smart DistrictLondon, 🇬🇧 | 2016 | Completed | Succeeded | Official | City government | not public | Same idea, EU demonstrator money, and the lamppost approach was copied widely because it avoids new street furniture entirely. |
| Oslo's Municipal On-Street EV Charging NetworkOslo, 🇳🇴 | 2007 | Live | Scaled back | Official | City government, Private company | not public | The city's own agency has run its street network since 2007, and keeps missing its own annual targets — a modest municipal effort folded into a national tax-policy success story. |
| Delhi EV Policy & Discom-Tendered Public ChargingNew Delhi, 🇮🇳 | 2020 | Completed | Scaled back | Official | City government, Utility or public operator | not public | Tendered on the lowest price to the driver rather than the highest revenue to the state, which produced cheap public charging and nowhere near enough of it. |
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “NOX-Block Lamppost EV Charging” — Dortmund, Germany. The Smart City Atlas. https://1001smartcities.org/projects/dortmund-nox-block-charging/ (last verified 2026-08-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
