 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "dortmund-nox-block-charging",
  "title": "NOX-Block Lamppost EV Charging",
  "canonicalUrl": "https://1001smartcities.org/projects/dortmund-nox-block-charging/"
 },
 "currentRevisionId": "2026-08-20-source-dates-r2",
 "revisions": [
  {
   "id": "2026-08-15-baseline",
   "createdAt": "2026-08-15T18:03:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 10 claims and 4 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:6796d50095504e18743bb25ddc6d85b99e68545d93cf67ffedcb06f2249a0c0c",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:621c55f1369147ac55fcc740e52b91949190746d838fd8ad8692a63ad1660eef",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2019,
      "ended": null
     }
    },
    "governance": {
     "operator": "DEW21 with SPIE Deutschland & Zentraleuropa (StraBelDo consortium)",
     "actorTypes": [
      "utility",
      "city-government"
     ],
     "fundingModel": "grant",
     "fundingDescription": "Federal 'Sofortprogramm Saubere Luft' — ≈€10M for the three-city project",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-02626a76c377b780",
      "field": "snippet",
      "text": "Dortmund led the three-city NOX-Block project with Schwerte and Iserlohn",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The rollout report names the three participating cities and the StraBelDo consortium implementing the Dortmund share.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-08083e27cca129fb",
      "field": "snippet",
      "text": "a federal subsidy of about €10 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The report states the federal government subsidised NOX-Block with around €10 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-887ae20f32eb12c0",
      "field": "snippet",
      "text": "The first lamppost charger went live in December 2019",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report dates the first charging point to December 2019.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-bb9883b8e054a015",
      "field": "snippet",
      "text": "by late 2022 utility DEW21 and contractor SPIE had 320 points running at up to 11 kilowatts",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06",
       "src-d38127e22463ef43"
      ],
      "supportNote": "The state agency confirms all 320 lamppost chargers installed by late 2022 at 11 kW; the rollout report names DEW21 and SPIE as the implementing consortium.",
      "caveat": "Sources give the completion variously as September, November or December 2022; 'late 2022' covers the spread.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-73da2284f3ae4d5a",
      "field": "snippet",
      "text": "TU Dortmund and the University of Wuppertal studied the effects on the grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43",
       "src-2b633157ae392e06"
      ],
      "supportNote": "Both reports name TU Dortmund and Bergische Universität Wuppertal as scientific partners examining grid effects and local NOx emissions.",
      "caveat": "No published results of that research were found for this entry.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f7a856bdcb05a281",
      "field": "snippet",
      "text": "The 2021 rollout announcement had spoken of up to 500 points for Dortmund",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The July 2021 report states 680 points across the three cities, 500 of them in Dortmund.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8b647f0167e8db10",
      "field": "snippet",
      "text": "completion reports count 320 and declare the goals met, without explaining the gap",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report counts 320 chargers and states the project finished on schedule and on budget; it does not address the earlier 500-point figure.",
      "caveat": "The discrepancy may reflect a revised project scope, but no source found states that.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-97c58deeb3d15cfe",
      "field": "snippet",
      "text": "in summer 2025 the utility extended the kerbside idea with charging curbstones on Betenstraße",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "Local press reports the charging-curbstone pilot launched on Betenstraße in summer 2025, now at ten units.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a2eb408ccb197387",
      "field": "snippet",
      "text": "ten units that logged over 3,000 charging sessions at about 5.5 percent utilisation",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article reports ten curbstones, more than 3,000 charging sessions and roughly 5.5 percent utilisation since launch.",
      "caveat": "The utilisation figure and its favourable framing come from DEW21 itself.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9639c0d794929877",
      "field": "lesson",
      "text": "DEW21 frames 5.5 percent as a very good value for inner-city charging",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article quotes the utilisation as about 5.5 percent, described as a very good value for inner-city charging infrastructure.",
      "caveat": "That judgement is the operator's own framing, relayed by local press.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-d38127e22463ef43",
      "title": "electrive — Aufbau von 320 Laternen-Ladepunkten gestartet",
      "url": "https://www.electrive.net/2021/07/30/aufbau-von-320-laternen-ladepunkten-in-dortmund-gestartet/",
      "publisher": {
       "name": null,
       "domain": "electrive.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-02626a76c377b780",
       "clm-08083e27cca129fb",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-f7a856bdcb05a281"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade press at rollout start, July 2021: 680 points planned across three cities (500 Dortmund, 100 Schwerte, 80 Iserlohn), ≈€10M federal funding, StraBelDo consortium (DEW21 + SPIE), Ebee hardware, TU Dortmund and BU Wuppertal as research partners.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-2b633157ae392e06",
      "title": "Elektromobilität.NRW — Alle 320 Laternenlader installiert",
      "url": "https://www.elektromobilitaet.nrw/newsdetails/alle-320-laternenlader-in-dortmund-sind-nun-installiert-e-autos-einfach-und-bequem-an-gruener-leuchte-laden/",
      "publisher": {
       "name": null,
       "domain": "elektromobilitaet.nrw",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-887ae20f32eb12c0",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-8b647f0167e8db10"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "State e-mobility agency on completion: first charger December 2019, all 320 installed by late 2022, 11 kW, on time and on budget per the project; grid-impact research role of the universities.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4ac3ac91e3ad9cb8",
      "title": "Ruhr Nachrichten — DEW21 baut Ladebordsteine aus",
      "url": "https://www.ruhrnachrichten.de/themenseiten-rn/ladebordsteine-nachgeruestet-dew21-baut-innovative-ladepunkte-in-der-innenstadt-aus-w1196854-2002074350/",
      "publisher": {
       "name": null,
       "domain": "ruhrnachrichten.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-97c58deeb3d15cfe",
       "clm-a2eb408ccb197387",
       "clm-9639c0d794929877"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Local press, 2025/26: ten charging curbstones on Betenstraße since summer 2025, over 3,000 sessions, ≈5.5% utilisation described as a very good value, comparable to the existing lamppost points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-72005050817d18a8",
      "title": "Stadt Dortmund — Projekt NOX-Block",
      "url": "https://www.dortmund.de/themen/mobilitaet-und-verkehr/projekt-nox-block/",
      "publisher": {
       "name": null,
       "domain": "dortmund.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "City project page (authority). The site blocks automated retrieval; project facts here are cross-checked against the trade and state-agency sources above.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 3,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-b6",
   "createdAt": "2026-08-20T21:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:2ad857155f12717d207c122570b95a18690c36f73fa1075eef5245c24e2e5971",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:9138363f0fce89c4f85b944e787eb49261438986b0b30bf7a335cf8bd1ed5b32",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2019,
      "ended": null
     }
    },
    "governance": {
     "operator": "DEW21 with SPIE Deutschland & Zentraleuropa (StraBelDo consortium)",
     "actorTypes": [
      "utility",
      "city-government"
     ],
     "fundingModel": "grant",
     "fundingDescription": "Federal 'Sofortprogramm Saubere Luft' — ≈€10M for the three-city project",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-02626a76c377b780",
      "field": "snippet",
      "text": "Dortmund led the three-city NOX-Block project with Schwerte and Iserlohn",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The rollout report names the three participating cities and the StraBelDo consortium implementing the Dortmund share.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-08083e27cca129fb",
      "field": "snippet",
      "text": "a federal subsidy of about €10 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The report states the federal government subsidised NOX-Block with around €10 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-887ae20f32eb12c0",
      "field": "snippet",
      "text": "The first lamppost charger went live in December 2019",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report dates the first charging point to December 2019.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-bb9883b8e054a015",
      "field": "snippet",
      "text": "by late 2022 utility DEW21 and contractor SPIE had 320 points running at up to 11 kilowatts",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06",
       "src-d38127e22463ef43"
      ],
      "supportNote": "The state agency confirms all 320 lamppost chargers installed by late 2022 at 11 kW; the rollout report names DEW21 and SPIE as the implementing consortium.",
      "caveat": "Sources give the completion variously as September, November or December 2022; 'late 2022' covers the spread.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-73da2284f3ae4d5a",
      "field": "snippet",
      "text": "TU Dortmund and the University of Wuppertal studied the effects on the grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43",
       "src-2b633157ae392e06"
      ],
      "supportNote": "Both reports name TU Dortmund and Bergische Universität Wuppertal as scientific partners examining grid effects and local NOx emissions.",
      "caveat": "No published results of that research were found for this entry.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f7a856bdcb05a281",
      "field": "snippet",
      "text": "The 2021 rollout announcement had spoken of up to 500 points for Dortmund",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The July 2021 report states 680 points across the three cities, 500 of them in Dortmund.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8b647f0167e8db10",
      "field": "snippet",
      "text": "completion reports count 320 and declare the goals met, without explaining the gap",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report counts 320 chargers and states the project finished on schedule and on budget; it does not address the earlier 500-point figure.",
      "caveat": "The discrepancy may reflect a revised project scope, but no source found states that.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-97c58deeb3d15cfe",
      "field": "snippet",
      "text": "in summer 2025 the utility extended the kerbside idea with charging curbstones on Betenstraße",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "Local press reports the charging-curbstone pilot launched on Betenstraße in summer 2025, now at ten units.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a2eb408ccb197387",
      "field": "snippet",
      "text": "ten units that logged over 3,000 charging sessions at about 5.5 percent utilisation",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article reports ten curbstones, more than 3,000 charging sessions and roughly 5.5 percent utilisation since launch.",
      "caveat": "The utilisation figure and its favourable framing come from DEW21 itself.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9639c0d794929877",
      "field": "lesson",
      "text": "DEW21 frames 5.5 percent as a very good value for inner-city charging",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article quotes the utilisation as about 5.5 percent, described as a very good value for inner-city charging infrastructure.",
      "caveat": "That judgement is the operator's own framing, relayed by local press.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-d38127e22463ef43",
      "title": "electrive — Aufbau von 320 Laternen-Ladepunkten gestartet",
      "url": "https://www.electrive.net/2021/07/30/aufbau-von-320-laternen-ladepunkten-in-dortmund-gestartet/",
      "publisher": {
       "name": null,
       "domain": "electrive.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-02626a76c377b780",
       "clm-08083e27cca129fb",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-f7a856bdcb05a281"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade press at rollout start, July 2021: 680 points planned across three cities (500 Dortmund, 100 Schwerte, 80 Iserlohn), ≈€10M federal funding, StraBelDo consortium (DEW21 + SPIE), Ebee hardware, TU Dortmund and BU Wuppertal as research partners.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-2b633157ae392e06",
      "title": "Elektromobilität.NRW — Alle 320 Laternenlader installiert",
      "url": "https://www.elektromobilitaet.nrw/newsdetails/alle-320-laternenlader-in-dortmund-sind-nun-installiert-e-autos-einfach-und-bequem-an-gruener-leuchte-laden/",
      "publisher": {
       "name": null,
       "domain": "elektromobilitaet.nrw",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-887ae20f32eb12c0",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-8b647f0167e8db10"
      ],
      "temporal": {
       "publishedAt": "2022-11-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "State e-mobility agency on completion: first charger December 2019, all 320 installed by late 2022, 11 kW, on time and on budget per the project; grid-impact research role of the universities.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4ac3ac91e3ad9cb8",
      "title": "Ruhr Nachrichten — DEW21 baut Ladebordsteine aus",
      "url": "https://www.ruhrnachrichten.de/themenseiten-rn/ladebordsteine-nachgeruestet-dew21-baut-innovative-ladepunkte-in-der-innenstadt-aus-w1196854-2002074350/",
      "publisher": {
       "name": null,
       "domain": "ruhrnachrichten.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-97c58deeb3d15cfe",
       "clm-a2eb408ccb197387",
       "clm-9639c0d794929877"
      ],
      "temporal": {
       "publishedAt": "2026-05-29",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Local press, 2025/26: ten charging curbstones on Betenstraße since summer 2025, over 3,000 sessions, ≈5.5% utilisation described as a very good value, comparable to the existing lamppost points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-72005050817d18a8",
      "title": "Stadt Dortmund — Projekt NOX-Block",
      "url": "https://www.dortmund.de/themen/mobilitaet-und-verkehr/projekt-nox-block/",
      "publisher": {
       "name": null,
       "domain": "dortmund.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "City project page (authority). The site blocks automated retrieval; project facts here are cross-checked against the trade and state-agency sources above.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 3,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-r2",
   "createdAt": "2026-08-21T09:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:de41979cf778112f97726850edd718e7cc7d8618927c74cf83102e797261cd8e",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:4201cbc1a859e378f759870a35a6b6b1343681f7ddb5da3e7bff8136d865706b",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2019,
      "ended": null
     }
    },
    "governance": {
     "operator": "DEW21 with SPIE Deutschland & Zentraleuropa (StraBelDo consortium)",
     "actorTypes": [
      "utility",
      "city-government"
     ],
     "fundingModel": "grant",
     "fundingDescription": "Federal 'Sofortprogramm Saubere Luft' — ≈€10M for the three-city project",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-02626a76c377b780",
      "field": "snippet",
      "text": "Dortmund led the three-city NOX-Block project with Schwerte and Iserlohn",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The rollout report names the three participating cities and the StraBelDo consortium implementing the Dortmund share.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-08083e27cca129fb",
      "field": "snippet",
      "text": "a federal subsidy of about €10 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The report states the federal government subsidised NOX-Block with around €10 million.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-887ae20f32eb12c0",
      "field": "snippet",
      "text": "The first lamppost charger went live in December 2019",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report dates the first charging point to December 2019.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-bb9883b8e054a015",
      "field": "snippet",
      "text": "by late 2022 utility DEW21 and contractor SPIE had 320 points running at up to 11 kilowatts",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06",
       "src-d38127e22463ef43"
      ],
      "supportNote": "The state agency confirms all 320 lamppost chargers installed by late 2022 at 11 kW; the rollout report names DEW21 and SPIE as the implementing consortium.",
      "caveat": "Sources give the completion variously as September, November or December 2022; 'late 2022' covers the spread.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-73da2284f3ae4d5a",
      "field": "snippet",
      "text": "TU Dortmund and the University of Wuppertal studied the effects on the grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43",
       "src-2b633157ae392e06"
      ],
      "supportNote": "Both reports name TU Dortmund and Bergische Universität Wuppertal as scientific partners examining grid effects and local NOx emissions.",
      "caveat": "No published results of that research were found for this entry.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f7a856bdcb05a281",
      "field": "snippet",
      "text": "The 2021 rollout announcement had spoken of up to 500 points for Dortmund",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38127e22463ef43"
      ],
      "supportNote": "The July 2021 report states 680 points across the three cities, 500 of them in Dortmund.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8b647f0167e8db10",
      "field": "snippet",
      "text": "completion reports count 320 and declare the goals met, without explaining the gap",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2b633157ae392e06"
      ],
      "supportNote": "The completion report counts 320 chargers and states the project finished on schedule and on budget; it does not address the earlier 500-point figure.",
      "caveat": "The discrepancy may reflect a revised project scope, but no source found states that.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-97c58deeb3d15cfe",
      "field": "snippet",
      "text": "in summer 2025 the utility extended the kerbside idea with charging curbstones on Betenstraße",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "Local press reports the charging-curbstone pilot launched on Betenstraße in summer 2025, now at ten units.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a2eb408ccb197387",
      "field": "snippet",
      "text": "ten units that logged over 3,000 charging sessions at about 5.5 percent utilisation",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article reports ten curbstones, more than 3,000 charging sessions and roughly 5.5 percent utilisation since launch.",
      "caveat": "The utilisation figure and its favourable framing come from DEW21 itself.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9639c0d794929877",
      "field": "lesson",
      "text": "DEW21 frames 5.5 percent as a very good value for inner-city charging",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4ac3ac91e3ad9cb8"
      ],
      "supportNote": "The article quotes the utilisation as about 5.5 percent, described as a very good value for inner-city charging infrastructure.",
      "caveat": "That judgement is the operator's own framing, relayed by local press.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-d38127e22463ef43",
      "title": "electrive — Aufbau von 320 Laternen-Ladepunkten gestartet",
      "url": "https://www.electrive.net/2021/07/30/aufbau-von-320-laternen-ladepunkten-in-dortmund-gestartet/",
      "publisher": {
       "name": null,
       "domain": "electrive.net",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-02626a76c377b780",
       "clm-08083e27cca129fb",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-f7a856bdcb05a281"
      ],
      "temporal": {
       "publishedAt": "2021-07-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade press at rollout start, July 2021: 680 points planned across three cities (500 Dortmund, 100 Schwerte, 80 Iserlohn), ≈€10M federal funding, StraBelDo consortium (DEW21 + SPIE), Ebee hardware, TU Dortmund and BU Wuppertal as research partners.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-2b633157ae392e06",
      "title": "Elektromobilität.NRW — Alle 320 Laternenlader installiert",
      "url": "https://www.elektromobilitaet.nrw/newsdetails/alle-320-laternenlader-in-dortmund-sind-nun-installiert-e-autos-einfach-und-bequem-an-gruener-leuchte-laden/",
      "publisher": {
       "name": null,
       "domain": "elektromobilitaet.nrw",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-887ae20f32eb12c0",
       "clm-bb9883b8e054a015",
       "clm-73da2284f3ae4d5a",
       "clm-8b647f0167e8db10"
      ],
      "temporal": {
       "publishedAt": "2022-11-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "State e-mobility agency on completion: first charger December 2019, all 320 installed by late 2022, 11 kW, on time and on budget per the project; grid-impact research role of the universities.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4ac3ac91e3ad9cb8",
      "title": "Ruhr Nachrichten — DEW21 baut Ladebordsteine aus",
      "url": "https://www.ruhrnachrichten.de/themenseiten-rn/ladebordsteine-nachgeruestet-dew21-baut-innovative-ladepunkte-in-der-innenstadt-aus-w1196854-2002074350/",
      "publisher": {
       "name": null,
       "domain": "ruhrnachrichten.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-97c58deeb3d15cfe",
       "clm-a2eb408ccb197387",
       "clm-9639c0d794929877"
      ],
      "temporal": {
       "publishedAt": "2026-05-29",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Local press, 2025/26: ten charging curbstones on Betenstraße since summer 2025, over 3,000 sessions, ≈5.5% utilisation described as a very good value, comparable to the existing lamppost points.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-72005050817d18a8",
      "title": "Stadt Dortmund — Projekt NOX-Block",
      "url": "https://www.dortmund.de/themen/mobilitaet-und-verkehr/projekt-nox-block/",
      "publisher": {
       "name": null,
       "domain": "dortmund.de",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "City project page (authority). The site blocks automated retrieval; project facts here are cross-checked against the trade and state-agency sources above.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 3,
     "sourcesWithPublicationDate": 3,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}