Porto Alegre Street-Lighting PPP and Remote Management
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
14 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Porto Alegre now has about 118,000 LED street lamps under a 20-year PPP, but only about 22,000 report their own faults; elsewhere a repair still starts with a resident's request.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,277 documented projects · 🏙️ 10 more in Porto Alegre · 💡 Smart lighting guide · ⚡ Energy projects
Porto Alegre signed a 20-year public-private partnership for its street lighting in June 2020, with a contract value of R$403 million, and the IPSul consortium took over operations on 23 October 2020. The contract set out to replace the city's 101,000 lamps with LED; by December 2025 the city counted about 118,000 LED points. A remote-management layer can switch lamps on and off, dim them, detect faults and measure their temperature, but it was planned only for the busiest roads, covering about 22,000 points. A 2023 trade-press report put that at about 20% of the city's lighting points.
📊 Impact
The city reported that the first stage of the LED swap cut energy use by 35.8%, about R$620,000, and expects savings above 55% once all fittings are replaced.
🎓 Lesson
The data layer is the smaller part of this deal: outside the main roads, repairs still start with a request on the 156+POA app or the 156 and 0800 phone lines, which the city said were answered in 12 hours on average in 2023. The tender itself was contested. The city's own commission disqualified the winning bid, a court reinstated it, and the city said it still thought the commission had been technically right but would not prolong the dispute; the state audit court then denied the runner-up's request to suspend the contract.
Sources
Show 3 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2020. 8 of 8 sources carry a publication date, from 15 April 2020 to 30 December 2025.
When the sources were published
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
- Teletime · pressTeletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)
- Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)
Show your work What this page rests on and what it can’t tell you · all 14 claims with their sources · the forensic record
Evidence file · public beta 14 addressable claims, 8 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 14
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-c99c8e6846598945
quantitative
Porto Alegre signed a 20-year public-private partnership for its street lighting in June 2020
Sources carrying this claim
clm-e7a45c790dc6e3c0
quantitative
with a contract value of R$403 million
Sources carrying this claim
clm-23cd370ca5ac7401
quantitative
the IPSul consortium took over operations on 23 October 2020
Sources carrying this claim
clm-67e135f658a39fa5
quantitative
The contract set out to replace the city's 101,000 lamps with LED
Sources carrying this claim
clm-a06453f2a67f9c51
quantitative
by December 2025 the city counted about 118,000 LED points
Sources carrying this claim
clm-d34a6a5b0982d141
descriptive
A remote-management layer can switch lamps on and off, dim them, detect faults and measure their temperature
Sources carrying this claim
clm-d410f639e603ea29
quantitative
it was planned only for the busiest roads, covering about 22,000 points
Sources carrying this claim
clm-9d177eae37b758ea
quantitative
A 2023 trade-press report put that at about 20% of the city's lighting points.
Sources carrying this claim
clm-f435e32b2a851520
quantitative
The city reported that the first stage of the LED swap cut energy use by 35.8%, about R$620,000
Sources carrying this claim
clm-79cbf3692cc8abca
quantitative
expects savings above 55% once all fittings are replaced
Sources carrying this claim
clm-9c800c261ef04f60
quantitative
repairs still start with a request on the 156+POA app or the 156 and 0800 phone lines, which the city said were answered in 12 hours on average in 2023
Sources carrying this claim
clm-3437be89f6d37e69
descriptive
The city's own commission disqualified the winning bid, a court reinstated it
Sources carrying this claim
clm-bf20b5dd618c7c54
descriptive
the city said it still thought the commission had been technically right but would not prolong the dispute
Sources carrying this claim
clm-7db1e84aa0060c41
descriptive
the state audit court then denied the runner-up's request to suspend the contract
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:7473bc2f2996164333da6c5203048f45f242591ccd977406ef1693522357c13c
- 14
- of 14 claims mapped
- 8
- source dossiers
- 8
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- IPSul consortium (Quantum Engenharia, GCE, Fortnort, STE), overseen by the Secretaria Municipal de Serviços Urbanos
- Actor types
- city-government, private
- Funding model
- ppp
- Funding description
- Municipal monthly payments to the concessionaire under a 20-year administrative concession (modelled with BNDES support)
- Cost
- R$403M contract value over 20 years (city, 2020)
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
8 source dossiers
Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
- Stable source ID
src-65a645bc83dd0d0d- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2020-10-23
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City note on IPSul taking over operations on 23 October 2020: 20-year contract worth R$403 million, 101,000 lamps to be replaced by LED, pilot of 2,500 points.
Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
- Stable source ID
src-7c91e599511ed958- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2020-06-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City Attorney's note: TCE-RS denied the runner-up PoaLuz consortium's request to suspend the contract; contract signed on 17 June 2020; consortium members named.
- Claims linked
Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
- Stable source ID
src-306c159ab8332293- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2020-04-15
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City note declaring the IP Sul consortium the winner after a first-instance court ruling annulled its disqualification; the parceria secretary says the commission's decision was technically correct.
- Claims linked
Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
- Stable source ID
src-69235a81f906027d- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2021-07-28
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City note on the start of the LED rollout: telemanagement on the busiest roads covers about 22,000 points and can switch, dim, detect faults and measure temperature; base register of 103,099 points.
- Claims linked
Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
- Stable source ID
src-701bc8bb398eb4f7- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2022-03-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City note on the first modernisation stage: R$32 million invested, 35.8% energy saving (about R$620,000) in the first stage, target above 55% once all fittings are replaced.
Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)
- Stable source ID
src-773697eaf1fa924a- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2023-08-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City note: LED installed at more than 113,000 points, above the initial target of 103,000; average repair time 12 hours after a request on the 156+POA app or the 156 and 0800 lines.
- Claims linked
Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)
- Stable source ID
src-57479429aeca150f- Publisher
- Name not classified · prefeitura.poa.br
- Type / language
- web-page · language not classified
- Published
- 2025-12-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City balance for 2025: about 118,000 LED points under the PPP, contract run by the SMSUrb lighting coordination; wire and fitting theft figures.
- Claims linked
Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)
- Stable source ID
src-fafdd3f9614a5f54- Publisher
- Name not classified · teletime.com.br
- Type / language
- web-page · language not classified
- Published
- 2023-05-24
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-15
- Dossier created
- 2026-11-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Trade-press report: TIM, M2M Telemetria and Qualcomm run a telemanagement system with IPSul covering more than 22,000 luminaires, about 20% of the city's lighting points, over NB-IoT.
- Claims linked
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Porto Alegre Street-Lighting PPP and Remote Management” — Porto Alegre, Brazil. The Smart City Atlas. https://1001smartcities.org/projects/porto-alegre-street-lighting-ppp/ (last verified 2026-11-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
