Porto Alegre now has about 118,000 LED street lamps under a 20-year PPP, but only about 22,000 report their own faults; elsewhere a repair still starts with a resident's request.

Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
CostR$403M contract value over 20 years (city, 2020)
FundingMunicipal monthly payments to the concessionaire under a 20-year administrative concession (modelled with BNDES support)

Part of 1001 Smart Cities — 1,277 documented projects · 🏙️ 10 more in Porto Alegre · 💡 Smart lighting guide · ⚡ Energy projects

Porto Alegre signed a 20-year public-private partnership for its street lighting in June 2020, with a contract value of R$403 million, and the IPSul consortium took over operations on 23 October 2020. The contract set out to replace the city's 101,000 lamps with LED; by December 2025 the city counted about 118,000 LED points. A remote-management layer can switch lamps on and off, dim them, detect faults and measure their temperature, but it was planned only for the busiest roads, covering about 22,000 points. A 2023 trade-press report put that at about 20% of the city's lighting points.

Live 📅 since 2020

Sources

↗ Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)City note on IPSul taking over operations on 23 October 2020: 20-year contract worth R$403 million, 101,000 lamps to be replaced by LED, pilot of 2,500 points.
↗ Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)City Attorney's note: TCE-RS denied the runner-up PoaLuz consortium's request to suspend the contract; contract signed on 17 June 2020; consortium members named.
↗ Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)City note declaring the IP Sul consortium the winner after a first-instance court ruling annulled its disqualification; the parceria secretary says the commission's decision was technically correct.
↗ Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)City note on the start of the LED rollout: telemanagement on the busiest roads covers about 22,000 points and can switch, dim, detect faults and measure temperature; base register of 103,099 points.
↗ Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)City note on the first modernisation stage: R$32 million invested, 35.8% energy saving (about R$620,000) in the first stage, target above 55% once all fittings are replaced.
Show 3 more sourcesShow fewer
↗ Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)City note: LED installed at more than 113,000 points, above the initial target of 103,000; average repair time 12 hours after a request on the 156+POA app or the 156 and 0800 lines.
↗ Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)City balance for 2025: about 118,000 LED points under the PPP, contract run by the SMSUrb lighting coordination; wire and fitting theft figures.
↗ Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)Trade-press report: TIM, M2M Telemetria and Qualcomm run a telemanagement system with IPSul covering more than 22,000 luminaires, about 20% of the city's lighting points, over NB-IoT.

📅 How old is the evidence?

Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2020. 8 of 8 sources carry a publication date, from 15 April 2020 to 30 December 2025.

When the sources were published

  1. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
  2. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
  3. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
  4. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
  5. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
  6. Teletime · pressTeletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)
  7. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)
  8. Prefeitura de Porto Alegre · city governmentPrefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)

Every source, with links ↑

What happened to this record

  1. Entered the record
  2. Sources last read

Every revision, permanent →

Show your work What this page rests on and what it can’t tell you · all 14 claims with their sources · the forensic record

Evidence file · public beta 14 addressable claims, 8 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 14

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-c99c8e6846598945 quantitative
Porto Alegre signed a 20-year public-private partnership for its street lighting in June 2020
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The City Attorney's note of 19 June 2020 says the PPP contract was signed on Wednesday the 17th; the October 2020 note gives the 20-year term.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
  2. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 2 clm-e7a45c790dc6e3c0 quantitative
with a contract value of R$403 million
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The city states the 20-year concession contract has a value of R$403 million.
Caveat
A contract value over twenty years, not a cost figure reconciled against payments made.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 3 clm-23cd370ca5ac7401 quantitative
the IPSul consortium took over operations on 23 October 2020
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The note says the concessionaire IP Sul assumes command of operations from Friday the 23rd (October 2020).
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 4 clm-67e135f658a39fa5 quantitative
The contract set out to replace the city's 101,000 lamps with LED
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The note says the city's 101,000 lamps will be replaced by LED luminaires within two years.
Caveat
The 2021 base register counted 103,099 points, so the network was larger than the figure used at the takeover.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 5 clm-a06453f2a67f9c51 quantitative
by December 2025 the city counted about 118,000 LED points
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 30 December 2025 balance says Porto Alegre has about 118,000 points with LED lamps under the PPP.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)
Claim 6 clm-d34a6a5b0982d141 descriptive
A remote-management layer can switch lamps on and off, dim them, detect faults and measure their temperature
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Both city notes describe the telemanagement system as able to switch on, switch off and control the intensity of lighting points, detect faults and measure operating temperature.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
  2. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 7 clm-d410f639e603ea29 quantitative
it was planned only for the busiest roads, covering about 22,000 points
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 2021 note says telemanagement on the busiest roads covers about 22,000 lighting points; the 2022 note places it on the busiest roads and floodlit monuments.
Caveat
The city has not published a later count of telemanaged points.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
  2. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 8 clm-9d177eae37b758ea quantitative
A 2023 trade-press report put that at about 20% of the city's lighting points.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Teletime reports more than 22,000 smart luminaires covering about 20% of the municipality's lighting points.
Caveat
The report relays statements from the vendors (TIM, M2M Telemetria, Qualcomm), not the city.

Sources carrying this claim

  1. Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)
Claim 9 clm-f435e32b2a851520 quantitative
The city reported that the first stage of the LED swap cut energy use by 35.8%, about R$620,000
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The March 2022 note says the first stage of the modernisation produced a 35.8% energy saving, about R$620,000.
Caveat
The city gives no period, baseline or measurement method for this figure, and no outside audit of the savings was found.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 10 clm-79cbf3692cc8abca quantitative
expects savings above 55% once all fittings are replaced
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The same note says that after all luminaires are replaced the energy saving should exceed 55%.
Caveat
A projection, not a result.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 11 clm-9c800c261ef04f60 quantitative
repairs still start with a request on the 156+POA app or the 156 and 0800 phone lines, which the city said were answered in 12 hours on average in 2023
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The August 2023 note gives an average of 12 hours to attend after a request made on the 156+POA app or the 156 and 0800 phones.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)
Claim 12 clm-3437be89f6d37e69 descriptive
The city's own commission disqualified the winning bid, a court reinstated it
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The April 2020 note says IP Sul, first in the auction, was disqualified by the municipal tender commission for not meeting one requirement, and was declared winner following a ruling of the 3rd Public Treasury Court.
Caveat
The ruling was first-instance; the city chose not to appeal further.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
Claim 13 clm-bf20b5dd618c7c54 descriptive
the city said it still thought the commission had been technically right but would not prolong the dispute
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The parceria secretary is quoted saying the commission's decision was correct from a technical point of view, but the city chose not to prolong the court dispute.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
Claim 14 clm-7db1e84aa0060c41 descriptive
the state audit court then denied the runner-up's request to suspend the contract
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The City Attorney's note says TCE-RS rejected the precautionary measure requested by the PoaLuz consortium, the runner-up, to suspend the contract.
Caveat
Reported by the city's own attorneys; this was a ruling on an injunction request, not an audit of the contract.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-15-baseline effective 2026-11-15 · created 2026-11-15

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:7473bc2f2996164333da6c5203048f45f242591ccd977406ef1693522357c13c
14
of 14 claims mapped
8
source dossiers
8
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
IPSul consortium (Quantum Engenharia, GCE, Fortnort, STE), overseen by the Secretaria Municipal de Serviços Urbanos
Actor types
city-government, private
Funding model
ppp
Funding description
Municipal monthly payments to the concessionaire under a 20-year administrative concession (modelled with BNDES support)
Cost
R$403M contract value over 20 years (city, 2020)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

8 source dossiers

Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020) prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-65a645bc83dd0d0d
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-10-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on IPSul taking over operations on 23 October 2020: 20-year contract worth R$403 million, 101,000 lamps to be replaced by LED, pilot of 2,500 points.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-7c91e599511ed958
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-06-19
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City Attorney's note: TCE-RS denied the runner-up PoaLuz consortium's request to suspend the contract; contract signed on 17 June 2020; consortium members named.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-306c159ab8332293
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-04-15
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note declaring the IP Sul consortium the winner after a first-instance court ruling annulled its disqualification; the parceria secretary says the commission's decision was technically correct.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-69235a81f906027d
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2021-07-28
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on the start of the LED rollout: telemanagement on the busiest roads covers about 22,000 points and can switch, dim, detect faults and measure temperature; base register of 103,099 points.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022) prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-701bc8bb398eb4f7
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2022-03-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on the first modernisation stage: R$32 million invested, 35.8% energy saving (about R$620,000) in the first stage, target above 55% once all fittings are replaced.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023) prefeitura.poa.br · 1 linked claim

Open original source ↗

Stable source ID
src-773697eaf1fa924a
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2023-08-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note: LED installed at more than 113,000 points, above the initial target of 103,000; average repair time 12 hours after a request on the 156+POA app or the 156 and 0800 lines.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025) prefeitura.poa.br · 1 linked claim

Open original source ↗

Stable source ID
src-57479429aeca150f
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2025-12-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City balance for 2025: about 118,000 LED points under the PPP, contract run by the SMSUrb lighting coordination; wire and fitting theft figures.

Descriptive only — not page/paragraph exact
Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023) teletime.com.br · 1 linked claim

Open original source ↗

Stable source ID
src-fafdd3f9614a5f54
Publisher
Name not classified · teletime.com.br
Type / language
web-page · language not classified
Published
2023-05-24
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade-press report: TIM, M2M Telemetria and Qualcomm run a telemanagement system with IPSul covering more than 22,000 luminaires, about 20% of the city's lighting points, over NB-IoT.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
📎 Cite this project

1001 Smart Cities (2026). “Porto Alegre Street-Lighting PPP and Remote Management” — Porto Alegre, Brazil. The Smart City Atlas. https://1001smartcities.org/projects/porto-alegre-street-lighting-ppp/ (last verified 2026-11-15). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ One source-checked project a week. No pitches, no vendors.

Inside: the Landmark of the Week, one Insight, the newly documented cities. One-click unsubscribe. About the newsletter · RSS