Every new lamp in Alba Iulia meters its own power. Yet the savings a national agency held up as results are, figure for figure, the targets on the city's own project page.

Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
CostProject totals on the city's portal: Cetate 21,520,788.27 lei; component villages 8,726,128.54 lei. Works contracts signed in July 2022: 18,408,561.57 lei (centre, Ampoi, Partoș) and 14,932,600.00 lei (Cetate), excl. VAT.
FundingEU Regional Operational Programme 2014–2020 (POR) grants for the three main projects; two further lighting projects funded by Romania's Environmental Fund (AFM).

Part of 1001 Smart Cities — 1,229 documented projects · 🏙️ 6 more in Alba Iulia · 💡 Smart lighting guide · ⚡ Energy projects

Alba Iulia is rebuilding its street lighting as LED lamps reporting to a dispatch centre. Three projects from the EU's 2014–2020 regional programme, begun in 2020, cover the centre with the Ampoi and Partoș districts, the Cetate district, and the component villages; by the city's January 2023 count they create 85.56 km of underground network, about 60% of the current system. Every lamp they install is controlled by telemanagement: 1,496 in the centre and Ampoi, 1,222 in Cetate, 1,396 in the villages. The software dims each lamp by time of day, traffic or pedestrians, meters its consumption and raises an alert when it fails, and pedestrian crossings get presence sensors. Day-to-day service is delegated: in January 2023 Flash Lighting Services, on a 2012 contract, still repaired faults on reports from citizens, the city hall or its own checks.

Live 📅 since 2020

Sources

↗ Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)The city's own page for the Cetate lighting project (25.02.2020–31.12.2024, regional programme 2014–2020, total 21,520,788.27 lei): a smart system monitored from a dispatch centre, 1,222 lighting points controlled by telemanagement, and the objective of cutting primary energy from 378,052.00 to 222,721.80 kWh a year and CO2 from 84.07 to 49.53 tonnes; the same figures are repeated under 'results', and the project status reads 'Implementare'.
↗ Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page)The city's page for the lighting project in the component villages (25.06.2020–31.12.2023, total 8,726,128.54 lei): 1,396 lighting points controlled by telemanagement, and the objective of cutting energy from 389,636.00 to 205,501.52 kWh a year, repeated under 'results' while the status reads 'Implementare'.
↗ Alba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primăriePublished 25 July 2022Signing of the works contracts for Lot 1 (centre, Ampoi 1–3 and Partoș, 18,408,561.57 lei excl. VAT) and Lot 2 (Cetate, 14,932,600.00 lei excl. VAT), funded by the 2014–2020 regional programme; Lot 1 installs 1,496 luminaires, each a lighting point controlled by telemanagement, and the two lots light 159 pedestrian crossings with presence sensors.
↗ Alba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 aniPublished 23 January 2023The city's five-year lighting concession tender: Flash Lighting Services SA runs the service under a 2012 delegation contract that ended on 8 November 2022 and could be extended; repairs are made on reports from citizens, the city hall or the operator's own checks; three EU-funded projects create 85.56 km of underground network, about 60% of the current system; two further projects are funded by the Environmental Fund.
↗ Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligentPublished 18 July 2026Report of a case study by ANAP, the national public procurement agency, on Alba Iulia's smart lighting project (16,883,170.63 lei excl. VAT): energy down from 378,052 to 222,721.80 kWh a year, CO2 from 84.07 to 49.53 tonnes, 55 crossings with presence sensors, and a telemanagement system that dims lamps, meters each luminaire and raises automatic fault alerts.
Show 1 more sourcesShow fewer
↗ Alba24 — Ce măsuri de reducere a consumului de energie au luat autoritățile din AlbaPublished 6 August 2026Local authorities' measures during the national energy alert of August 2026: Alba Iulia's city hall says street-lighting intensity was reduced by 20% from 5 August.

📅 How old is the evidence?

Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2020. 4 of 6 sources carry a publication date, from 25 July 2022 to 6 August 2026.

When the sources were published

  1. Alba24 · pressAlba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primărie
  2. Alba24 · pressAlba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 ani
  3. Alba24 · pressAlba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
  4. Alba24 · pressAlba24 — Ce măsuri de reducere a consumului de energie au luat autoritățile din Alba

Every source, with links ↑

What happened to this record

  1. Entered the record
  2. Sources last read

Every revision, permanent →

Show your work What this page rests on and what it can’t tell you · all 16 claims with their sources · the forensic record

Evidence file · public beta 16 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 16

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-87f9f1ab4651fd29 descriptive
Alba Iulia is rebuilding its street lighting as LED lamps reporting to a dispatch centre
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The city's Cetate project page describes a smart lighting system monitored from a dispatch centre; the concession tender puts the three EU projects at about 60% of the current system, with LED luminaires.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
  2. Alba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 ani
Claim 2 clm-ba514f1a22894247 quantitative
Three projects from the EU's 2014–2020 regional programme, begun in 2020
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Both project pages list the 2014–2020 programming period and start dates of 25.02.2020 (Cetate) and 25.06.2020 (villages); the July 2022 report says Lots 1 and 2 are funded by the Regional Operational Programme 2014–2020.
Caveat
The 'find' marks the programming-period field; the start dates appear in the page header.

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
  2. Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page)
  3. Alba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primărie
Claim 3 clm-5d00ec981b4fd3da quantitative
by the city's January 2023 count they create 85.56 km of underground network, about 60% of the current system
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The tender documentation counts 85.56 km of underground lighting network from three EU-funded projects, about 60% of the current system.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 ani
Claim 4 clm-19573b5062ae3817 quantitative
1,496 in the centre and Ampoi
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Lot 1 (centre, Ampoi 1–3 and Partoș) installs 1,496 luminaires, each a lighting point controlled by telemanagement.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primărie
Claim 5 clm-a0b426f83660115d quantitative
1,222 in Cetate
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The Cetate project page sets the number of lighting points controlled by telemanagement at 1,222 at the end of the project.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
Claim 6 clm-84508440a3823ff4 quantitative
1,396 in the villages
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The village project page sets lighting points controlled by telemanagement at 1,396 at the end of the project.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page)
Claim 7 clm-b9369abe2bfaf8fe descriptive
The software dims each lamp by time of day, traffic or pedestrians, meters its consumption and raises an alert when it fails
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
As reported from ANAP's case study, the telemanagement system controls light intensity remotely by time of day, traffic or pedestrian presence, monitors the consumption of each luminaire and generates automatic fault alerts.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Claim 8 clm-a7afe1ecb1eb2b85 descriptive
pedestrian crossings get presence sensors
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
ANAP's case study counts 55 crossings with presence sensors in Cetate; the July 2022 report puts 159 lit crossings with presence-sensor systems across Lots 1 and 2.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primărie
  2. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Claim 9 clm-b7735858555b6dec quantitative
in January 2023 Flash Lighting Services, on a 2012 contract, still repaired faults on reports from citizens, the city hall or its own checks
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The tender documentation says the service is provided by Flash Lighting Services SA under a delegation contract signed in 2012, and that repairs are made on reports from citizens, the city hall or the operator's periodic checks.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 ani
Claim 10 clm-c4d6c26149838c54 quantitative
In 2026 the national public procurement agency, ANAP, presented the Cetate project as good practice and reported that primary energy for lighting there fell from 378,052 to 222,721.80 kWh a year, and CO2 from 84.07 to 49.53 tonnes
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Alba24 reports ANAP's case study: primary energy for public lighting fell from 378,052 to 222,721.80 kWh a year and CO2 from 84.07 to 49.53 tonnes equivalent a year.
Caveat
The report does not name the Cetate district, but the project value (16,883,170.63 lei) and the energy figures match the Cetate project.

Sources carrying this claim

  1. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Claim 11 clm-00f7bf7cdb06f9ac descriptive
Those are the specific objectives on the city's own project page, which repeats them under results while still giving the project's status as in implementation
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The Cetate project page lists 378,052.00 to 222,721.80 kWh/year and 84.07 to 49.53 tonnes CO2 under 'Obiective specifice', repeats them under 'Rezultate', and gives 'Stadiu proiect: Implementare'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
Claim 12 clm-0d01941f51a64408 descriptive
the village project's page follows the same pattern
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The village project page lists 389,636.00 to 205,501.52 kWh/year as an objective and repeats it under results, with the status 'Implementare'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page)
Claim 13 clm-d7a716caef56b05e descriptive
Neither the agency's summary nor the project pages cite a measurement taken after completion
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Read against the three documents: none names a metering period, an energy audit or a measured value after the works; the figures given are the project objectives. A measurement may exist unpublished.
Caveat
This states what the published sources contain; in 2023 the city bought an energy audit at the completion of the village works, whose results we did not find published.

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
  2. Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page)
  3. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Claim 14 clm-16c82e94193d58de quantitative
From 5 August 2026, during a national energy alert, the city said it had cut street-lighting intensity by 20%
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The city hall told Alba24 that from 5 August public-lighting intensity was reduced by 20%, in the context of the national energy alert declared in August.
Caveat
The report does not say whether the reduction was made through the telemanagement system.

Sources carrying this claim

  1. Alba24 — Ce măsuri de reducere a consumului de energie au luat autoritățile din Alba
Claim 15 clm-956d5aeb7d196c51 descriptive
The savings a national agency held up as proof are the objectives the city wrote into its project page, repeated there as results while the project was still marked as in implementation
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
ANAP's figures as reported equal the objectives on the Cetate project page, which repeats them under 'Rezultatele proiectului' with the status 'Implementare'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page)
  2. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Claim 16 clm-3df28737aa00dd1d descriptive
The system the city paid for meters every lamp's consumption
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
ANAP's case study says the telemanagement system permanently monitors energy consumption for each luminaire.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-05-baseline effective 2026-11-05 · created 2026-11-05

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:d426bf188804c0440fe498c0dbb683358d32cc448f7a4cfe1661d540f716183a
16
of 16 claims mapped
6
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Municipality of Alba Iulia (owner); the public lighting service is delegated to a private operator — Flash Lighting Services SA under a 2012 contract that ended on 8 November 2022 and could be extended; a new five-year concession was tendered in January 2023
Actor types
city-government, private
Funding model
grant
Funding description
EU Regional Operational Programme 2014–2020 (POR) grants for the three main projects; two further lighting projects funded by Romania's Environmental Fund (AFM).
Cost
Project totals on the city's portal: Cetate 21,520,788.27 lei; component villages 8,726,128.54 lei. Works contracts signed in July 2022: 18,408,561.57 lei (centre, Ampoi, Partoș) and 14,932,600.00 lei (Cetate), excl. VAT.
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Proiecte Municipiul Alba Iulia — Crearea sistemului de iluminat public al Municipiului Alba Iulia – Cartier Cetate (project page) proiecte.apulum.ro · 6 linked claims

Open original source ↗

Stable source ID
src-c32f59e0fa7cb7ac
Publisher
Name not classified · proiecte.apulum.ro
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's own page for the Cetate lighting project (25.02.2020–31.12.2024, regional programme 2014–2020, total 21,520,788.27 lei): a smart system monitored from a dispatch centre, 1,222 lighting points controlled by telemanagement, and the objective of cutting primary energy from 378,052.00 to 222,721.80 kWh a year and CO2 from 84.07 to 49.53 tonnes; the same figures are repeated under 'results', and the project status reads 'Implementare'.

Descriptive only — not page/paragraph exact
Proiecte Municipiul Alba Iulia — Reabilitarea, modernizarea şi extinderea sistemului de iluminat public – localităţi componente (project page) proiecte.apulum.ro · 4 linked claims

Open original source ↗

Stable source ID
src-f08d0e01047730b0
Publisher
Name not classified · proiecte.apulum.ro
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's page for the lighting project in the component villages (25.06.2020–31.12.2023, total 8,726,128.54 lei): 1,396 lighting points controlled by telemanagement, and the objective of cutting energy from 389,636.00 to 205,501.52 kWh a year, repeated under 'results' while the status reads 'Implementare'.

Descriptive only — not page/paragraph exact
Alba24 — Sistem de iluminat public inteligent de peste 33 de milioane lei la Alba Iulia. Contractele au fost semnate de primărie alba24.ro · 3 linked claims

Open original source ↗

Stable source ID
src-03249ef0db56e861
Publisher
Name not classified · alba24.ro
Type / language
web-page · language not classified
Published
2022-07-25
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Signing of the works contracts for Lot 1 (centre, Ampoi 1–3 and Partoș, 18,408,561.57 lei excl. VAT) and Lot 2 (Cetate, 14,932,600.00 lei excl. VAT), funded by the 2014–2020 regional programme; Lot 1 installs 1,496 luminaires, each a lighting point controlled by telemanagement, and the two lots light 159 pedestrian crossings with presence sensors.

Descriptive only — not page/paragraph exact
Alba24 — Licitație de peste 30 de milioane de lei pentru concesionarea serviciului de iluminat public din Alba Iulia, în următorii 5 ani alba24.ro · 3 linked claims

Open original source ↗

Stable source ID
src-ea4633c12c4523d0
Publisher
Name not classified · alba24.ro
Type / language
web-page · language not classified
Published
2023-01-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's five-year lighting concession tender: Flash Lighting Services SA runs the service under a 2012 delegation contract that ended on 8 November 2022 and could be extended; repairs are made on reports from citizens, the city hall or the operator's own checks; three EU-funded projects create 85.56 km of underground network, about 60% of the current system; two further projects are funded by the Environmental Fund.

Descriptive only — not page/paragraph exact
Alba24 — Municipiul Alba Iulia, dat ca exemplu de Agenția pentru Achiziții Publice, cu proiectul privind iluminatul public inteligent alba24.ro · 6 linked claims

Open original source ↗

Stable source ID
src-54e7b1c35a5d190a
Publisher
Name not classified · alba24.ro
Type / language
web-page · language not classified
Published
2026-07-18
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Report of a case study by ANAP, the national public procurement agency, on Alba Iulia's smart lighting project (16,883,170.63 lei excl. VAT): energy down from 378,052 to 222,721.80 kWh a year, CO2 from 84.07 to 49.53 tonnes, 55 crossings with presence sensors, and a telemanagement system that dims lamps, meters each luminaire and raises automatic fault alerts.

Descriptive only — not page/paragraph exact
Alba24 — Ce măsuri de reducere a consumului de energie au luat autoritățile din Alba alba24.ro · 1 linked claim

Open original source ↗

Stable source ID
src-572b9104f2ba5ce7
Publisher
Name not classified · alba24.ro
Type / language
web-page · language not classified
Published
2026-08-06
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-05
Dossier created
2026-11-05
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Local authorities' measures during the national energy alert of August 2026: Alba Iulia's city hall says street-lighting intensity was reduced by 20% from 5 August.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
📎 Cite this project

1001 Smart Cities (2026). “Alba Iulia's Telemanaged LED Street Lighting” — Alba Iulia, Romania. The Smart City Atlas. https://1001smartcities.org/projects/alba-iulia-street-lighting-telemanagement/ (last verified 2026-11-05). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ One source-checked project a week. No pitches, no vendors.

Inside: the Landmark of the Week, one Insight, the newly documented cities. One-click unsubscribe. About the newsletter · RSS