Alba Iulia is rebuilding its street lighting as LED lamps reporting to a dispatch centre
Permanent project revision
Revision 2026-11-05-baseline · effective 2026-11-05
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 16 claims and 6 source dossiers.
sha256:d426bf188804c0440fe498c0dbb683358d32cc448f7a4cfe1661d540f716183a
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-87f9f1ab4651fd29
descriptive
Alba Iulia is rebuilding its street lighting as LED lamps reporting to a dispatch centre
clm-ba514f1a22894247
quantitative
Three projects from the EU's 2014–2020 regional programme, begun in 2020
clm-5d00ec981b4fd3da
quantitative
by the city's January 2023 count they create 85.56 km of underground network, about 60% of the current system
clm-19573b5062ae3817
quantitative
1,496 in the centre and Ampoi
clm-a0b426f83660115d
quantitative
1,222 in Cetate
clm-84508440a3823ff4
quantitative
1,396 in the villages
clm-b9369abe2bfaf8fe
descriptive
The software dims each lamp by time of day, traffic or pedestrians, meters its consumption and raises an alert when it fails
clm-a7afe1ecb1eb2b85
descriptive
pedestrian crossings get presence sensors
clm-b7735858555b6dec
quantitative
in January 2023 Flash Lighting Services, on a 2012 contract, still repaired faults on reports from citizens, the city hall or its own checks
clm-c4d6c26149838c54
quantitative
In 2026 the national public procurement agency, ANAP, presented the Cetate project as good practice and reported that primary energy for lighting there fell from 378,052 to 222,721.80 kWh a year, and CO2 from 84.07 to 49.53 tonnes
clm-00f7bf7cdb06f9ac
descriptive
Those are the specific objectives on the city's own project page, which repeats them under results while still giving the project's status as in implementation
clm-0d01941f51a64408
descriptive
the village project's page follows the same pattern
clm-d7a716caef56b05e
descriptive
Neither the agency's summary nor the project pages cite a measurement taken after completion
clm-16c82e94193d58de
quantitative
From 5 August 2026, during a national energy alert, the city said it had cut street-lighting intensity by 20%
clm-956d5aeb7d196c51
descriptive
The savings a national agency held up as proof are the objectives the city wrote into its project page, repeated there as results while the project was still marked as in implementation
clm-3df28737aa00dd1d
descriptive
The system the city paid for meters every lamp's consumption
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:d426bf188804c0440fe498c0dbb683358d32cc448f7a4cfe1661d540f716183a
src-c32f59e0fa7cb7acThe city's own page for the Cetate lighting project (25.02.2020–31.12.2024, regional programme 2014–2020, total 21,520,788.27 lei): a smart system monitored from a dispatch centre, 1,222 lighting points controlled by telemanagement, and the objective of cutting primary energy from 378,052.00 to 222,721.80 kWh a year and CO2 from 84.07 to 49.53 tonnes; the same figures are repeated under 'results', and the project status reads 'Implementare'.
src-f08d0e01047730b0The city's page for the lighting project in the component villages (25.06.2020–31.12.2023, total 8,726,128.54 lei): 1,396 lighting points controlled by telemanagement, and the objective of cutting energy from 389,636.00 to 205,501.52 kWh a year, repeated under 'results' while the status reads 'Implementare'.
src-03249ef0db56e861Signing of the works contracts for Lot 1 (centre, Ampoi 1–3 and Partoș, 18,408,561.57 lei excl. VAT) and Lot 2 (Cetate, 14,932,600.00 lei excl. VAT), funded by the 2014–2020 regional programme; Lot 1 installs 1,496 luminaires, each a lighting point controlled by telemanagement, and the two lots light 159 pedestrian crossings with presence sensors.
src-ea4633c12c4523d0The city's five-year lighting concession tender: Flash Lighting Services SA runs the service under a 2012 delegation contract that ended on 8 November 2022 and could be extended; repairs are made on reports from citizens, the city hall or the operator's own checks; three EU-funded projects create 85.56 km of underground network, about 60% of the current system; two further projects are funded by the Environmental Fund.
src-54e7b1c35a5d190aReport of a case study by ANAP, the national public procurement agency, on Alba Iulia's smart lighting project (16,883,170.63 lei excl. VAT): energy down from 378,052 to 222,721.80 kWh a year, CO2 from 84.07 to 49.53 tonnes, 55 crossings with presence sensors, and a telemanagement system that dims lamps, meters each luminaire and raises automatic fault alerts.
src-572b9104f2ba5ce7Local authorities' measures during the national energy alert of August 2026: Alba Iulia's city hall says street-lighting intensity was reduced by 20% from 5 August.