Porto Alegre Street-Lighting PPP and Remote Management

Revision 2026-11-15-baseline · effective 2026-11-15

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 14 claims and 8 source dossiers.

sha256:7473bc2f2996164333da6c5203048f45f242591ccd977406ef1693522357c13c

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
14
of 14 claims mapped
8
source dossiers
8
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-c99c8e6846598945 quantitative
Porto Alegre signed a 20-year public-private partnership for its street lighting in June 2020
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The City Attorney's note of 19 June 2020 says the PPP contract was signed on Wednesday the 17th; the October 2020 note gives the 20-year term.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)
  2. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 2 clm-e7a45c790dc6e3c0 quantitative
with a contract value of R$403 million
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The city states the 20-year concession contract has a value of R$403 million.
Caveat
A contract value over twenty years, not a cost figure reconciled against payments made.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 3 clm-23cd370ca5ac7401 quantitative
the IPSul consortium took over operations on 23 October 2020
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The note says the concessionaire IP Sul assumes command of operations from Friday the 23rd (October 2020).
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 4 clm-67e135f658a39fa5 quantitative
The contract set out to replace the city's 101,000 lamps with LED
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The note says the city's 101,000 lamps will be replaced by LED luminaires within two years.
Caveat
The 2021 base register counted 103,099 points, so the network was larger than the figure used at the takeover.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020)
Claim 5 clm-a06453f2a67f9c51 quantitative
by December 2025 the city counted about 118,000 LED points
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 30 December 2025 balance says Porto Alegre has about 118,000 points with LED lamps under the PPP.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025)
Claim 6 clm-d34a6a5b0982d141 descriptive
A remote-management layer can switch lamps on and off, dim them, detect faults and measure their temperature
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Both city notes describe the telemanagement system as able to switch on, switch off and control the intensity of lighting points, detect faults and measure operating temperature.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
  2. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 7 clm-d410f639e603ea29 quantitative
it was planned only for the busiest roads, covering about 22,000 points
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 2021 note says telemanagement on the busiest roads covers about 22,000 lighting points; the 2022 note places it on the busiest roads and floodlit monuments.
Caveat
The city has not published a later count of telemanaged points.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021)
  2. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 8 clm-9d177eae37b758ea quantitative
A 2023 trade-press report put that at about 20% of the city's lighting points.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Teletime reports more than 22,000 smart luminaires covering about 20% of the municipality's lighting points.
Caveat
The report relays statements from the vendors (TIM, M2M Telemetria, Qualcomm), not the city.

Sources carrying this claim

  1. Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023)
Claim 9 clm-f435e32b2a851520 quantitative
The city reported that the first stage of the LED swap cut energy use by 35.8%, about R$620,000
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The March 2022 note says the first stage of the modernisation produced a 35.8% energy saving, about R$620,000.
Caveat
The city gives no period, baseline or measurement method for this figure, and no outside audit of the savings was found.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 10 clm-79cbf3692cc8abca quantitative
expects savings above 55% once all fittings are replaced
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The same note says that after all luminaires are replaced the energy saving should exceed 55%.
Caveat
A projection, not a result.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022)
Claim 11 clm-9c800c261ef04f60 quantitative
repairs still start with a request on the 156+POA app or the 156 and 0800 phone lines, which the city said were answered in 12 hours on average in 2023
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The August 2023 note gives an average of 12 hours to attend after a request made on the 156+POA app or the 156 and 0800 phones.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023)
Claim 12 clm-3437be89f6d37e69 descriptive
The city's own commission disqualified the winning bid, a court reinstated it
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The April 2020 note says IP Sul, first in the auction, was disqualified by the municipal tender commission for not meeting one requirement, and was declared winner following a ruling of the 3rd Public Treasury Court.
Caveat
The ruling was first-instance; the city chose not to appeal further.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
Claim 13 clm-bf20b5dd618c7c54 descriptive
the city said it still thought the commission had been technically right but would not prolong the dispute
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The parceria secretary is quoted saying the commission's decision was correct from a technical point of view, but the city chose not to prolong the court dispute.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020)
Claim 14 clm-7db1e84aa0060c41 descriptive
the state audit court then denied the runner-up's request to suspend the contract
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The City Attorney's note says TCE-RS rejected the precautionary measure requested by the PoaLuz consortium, the runner-up, to suspend the contract.
Caveat
Reported by the city's own attorneys; this was a ruling on an injunction request, not an audit of the contract.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-15-baseline effective 2026-11-15 · created 2026-11-15

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:7473bc2f2996164333da6c5203048f45f242591ccd977406ef1693522357c13c
14
of 14 claims mapped
8
source dossiers
8
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
IPSul consortium (Quantum Engenharia, GCE, Fortnort, STE), overseen by the Secretaria Municipal de Serviços Urbanos
Actor types
city-government, private
Funding model
ppp
Funding description
Municipal monthly payments to the concessionaire under a 20-year administrative concession (modelled with BNDES support)
Cost
R$403M contract value over 20 years (city, 2020)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

8 source dossiers

Prefeitura de Porto Alegre — Concessionaire takes over street lighting (23 Oct 2020) prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-65a645bc83dd0d0d
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-10-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on IPSul taking over operations on 23 October 2020: 20-year contract worth R$403 million, 101,000 lamps to be replaced by LED, pilot of 2,500 points.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — TCE-RS rejects bid to suspend the lighting PPP (19 Jun 2020) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-7c91e599511ed958
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-06-19
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City Attorney's note: TCE-RS denied the runner-up PoaLuz consortium's request to suspend the contract; contract signed on 17 June 2020; consortium members named.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — IP Sul declared winner after court order (15 Apr 2020) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-306c159ab8332293
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2020-04-15
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note declaring the IP Sul consortium the winner after a first-instance court ruling annulled its disqualification; the parceria secretary says the commission's decision was technically correct.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Modernisation starts in Restinga (28 Jul 2021) prefeitura.poa.br · 2 linked claims

Open original source ↗

Stable source ID
src-69235a81f906027d
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2021-07-28
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on the start of the LED rollout: telemanagement on the busiest roads covers about 22,000 points and can switch, dim, detect faults and measure temperature; base register of 103,099 points.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — First modernisation stage completed (30 Mar 2022) prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-701bc8bb398eb4f7
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2022-03-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note on the first modernisation stage: R$32 million invested, 35.8% energy saving (about R$620,000) in the first stage, target above 55% once all fittings are replaced.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — LED passes 113,000 points (17 Aug 2023) prefeitura.poa.br · 1 linked claim

Open original source ↗

Stable source ID
src-773697eaf1fa924a
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2023-08-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note: LED installed at more than 113,000 points, above the initial target of 103,000; average repair time 12 hours after a request on the 156+POA app or the 156 and 0800 lines.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Street-lighting service balance for 2025 (30 Dec 2025) prefeitura.poa.br · 1 linked claim

Open original source ↗

Stable source ID
src-57479429aeca150f
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2025-12-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City balance for 2025: about 118,000 LED points under the PPP, contract run by the SMSUrb lighting coordination; wire and fitting theft figures.

Descriptive only — not page/paragraph exact
Teletime — 22,000 smart luminaires with TIM connectivity (24 May 2023) teletime.com.br · 1 linked claim

Open original source ↗

Stable source ID
src-fafdd3f9614a5f54
Publisher
Name not classified · teletime.com.br
Type / language
web-page · language not classified
Published
2023-05-24
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade-press report: TIM, M2M Telemetria and Qualcomm run a telemanagement system with IPSul covering more than 22,000 luminaires, about 20% of the city's lighting points, over NB-IoT.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.