Harbin Daoli Automated District Heating Network
Harbin's Daoli district became one of China's largest automated district-heating retrofits when ABB completed it in 2007: 156 self-operating heat-exchange stations replaced coal boiler rooms across 17.6 million square metres, serving about a million residents. The city has since built a citywide smart-heating command platform that automatically alerts operators to equipment or pipeline faults.
📊 Impact
≈300,000 tonnes of coal and 500,000-550,000 tonnes of CO2 saved per year at the Daoli system's 2007 completion (ABB-reported).
📖 Terms in this entry: Smart grid · Adaptive traffic signals · Digital twin
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Harbin Daoli Automated District Heating Network” — Harbin, China. The Smart City Atlas. https://1001smartcities.org/projects/harbin-smart-heating/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
