Ho Chi Minh City
Lê Minh Phát, CC BY 2.0, via Wikimedia Commons
🇻🇳

Ho Chi Minh City

Country
Vietnam
Population
14M
Projects
5
First project
2008
Best evidence
Official
Last verified
27 August 2026
In the atlas since
19 July 2026

🤖 AI-generated city profile, summarising the source-checked entries below — how this works

Vietnam's largest city runs its traffic through the Urban Traffic Management and Control Center, founded in 2010 as a tunnel-operations office and given a citywide traffic mandate in 2020. Its AI camera network scaled fast — from 31 enforcement junctions in September 2025 to roughly 216 a year later — catching red-light running and illegal turns across a metro area that grew larger still after Ho Chi Minh City's 2025 merger with neighbouring Bình Dương and Bà Rịa-Vũng Tàu provinces.

The atlas documents 5 projects in Ho Chi Minh City, the earliest dating to 2008: 5 still running without a verdict. Every entry carries an evidence grade — the strongest here is official (4 entries) — and links its sources.

Start here

Three entries that show what Ho Chi Minh City is actually doing.

The shape of Ho Chi Minh City

Computed from the 5 entries below — a profile, not a score.

Outcome ongoing 5
Evidence official 4media 1

How Ho Chi Minh City got smart

Ho Chi Minh City's oldest entry is the one that settled who holds the measurement. The city once lost around forty per cent of its drinking water to leaks; in 2008 the utility signed a World Bank-financed performance-based contract covering a 23-square-kilometre zone with about 140,000 connections, carving it into more than a hundred continuously metered district areas and paying the contractor for verified leakage reduction. The contract targeted 37,500 cubic metres a day and about 92,000 were achieved, with roughly 12,000 leaks repaired. District metering has since spread across the network and the utility reports non-revenue water below twelve per cent. The unfinished half is custody: once the contract ended, the headline number went back to being the utility's own.

Five years later the city built a complaint line and then, unusually, published its own remainders. 1022 began in 2013 as a hotline for reporting broken infrastructure and grew into the unified portal across phone, message, email, web, app and social channels, logging 650,961 reports by the end of 2017 and taking over two million contacts in the pandemic year. What turned it from a hotline into a management instrument is the figure it publishes about its failures: the share of reports handled past deadline fell from 13.96 per cent in the first half of 2022 to about one per cent that autumn. Between July 2025 and early January 2026 it received 85,108 reports and processed 83,744. The city's own reviews still name the failure no number of channels fixes — reports bounced between the 86 units and 625 focal points that share the queue.

The traffic layer arrived in 2020 and only reached enforcement five years later. The urban traffic management centre runs cameras with automatic plate recognition feeding both violation detection and signal control; enforcement went live at 31 intersections in September 2025, expanding to roughly 216 key junctions by early 2026 with about 200 more signal cabinets due to be networked that year. In its first five months the network detected over 8,000 violations, mainly red-light running, wrong-lane driving and illegal stopping. Then in December 2024 the city opened Vietnam's second metro line — 19.7 kilometres and fourteen stations, delivered turnkey with communications-based train control and seventeen trains, run by Vietnamese crews who took over from the supplier's supervisors during trial running. A driver sits in every cab and no operator source claims or dates unattended service.

The metro also produced one of the few honest ridership stories in this atlas. Rides were free until 20 January 2025, which inflated the opening month's headlines: 1.4 million riders in eleven days told less than the paid-fare year that followed, which closed at 20,558,990 passengers — an average of 56,326 a day against a pre-launch expectation of about 39,000. Beating your own forecast is rare in a genre where the circulating number is usually the signalling vendor's design capacity dressed up as demand. Four months later the city relaunched transit payment without a proprietary card: an open-loop system in which any contactless bank card, wallet or phone is the ticket, starting on more than 500 buses with a target of over 2,000, alongside a pass card and app for regulars, and four metro stations dropping paper tickets in a September 2025 pilot. The city's first attempt, an account-based card launched in 2019 with a technology partner, never became the standard and stopped operating at the end of 2024.

All 5 projects in Ho Chi Minh City

On a time axis, by the year each one started — 2008 to 2025. Pick a dot to read what it was.

2008 · 📡 Data & IoT · ✅ Live

SAWACO Water-Loss Reduction & District Metering

HCMC paid its contractor per verified cubic metre of leakage stopped — and got 92,000 a day against a 37,500 target. Losses once near 40% are now reported at 11.97%. The catch: today only the utility itself vouches for the number.

Read the entry →

✔ Every published entry is checked against the public sources it cites before publication.

How the pieces connect

Editorial links between Ho Chi Minh City's own entries — the city as a system, not a list.

What's next

Plans and announced trajectories — not yet documented results.

The thread through Ho Chi Minh City is measurement custody — who holds the number, and whether anyone outside can grade it. The water contract is the strongest case in the atlas for paying by the cubic metre rather than by the promise, and it is also the clearest demonstration of what is lost when such a contract ends, because the leakage rate went straight back to self-reporting. The complaint portal did the opposite and published its own overdue share, which is the number that turns intake into accountability. Three things are open. Whether the open-loop rollout ever publishes the share of boardings actually paid cashlessly, which is the only figure that will grade it. Whether the traffic network's 8,000 detected violations become a measured change in behaviour rather than a count. And whether the metro line, which already beat its own forecast, is ever given a second line to connect to — the city's transport department has flagged integration as the next step and the ticket is now the same.

Deeper reads

Where Ho Chi Minh City appears in the atlas's own analysis.

Closest comparisons

One city the atlas reads next to Ho Chi Minh City — the reason first, then the entries it rests on. Chosen by hand from the Ho Chi Minh City threads below, not counted out of them.

  1. 🇮🇳 Mumbai

    The same generation of CBTC line and the opposite fate of the same water contract: Mumbai's leak programme collapsed a fifth of the way in, Ho Chi Minh City's is the counter-case that kept going.

Show 11 further city threadsShow fewer

Every editorial link from Ho Chi Minh City's entries into another city, strongest first. Each one is a statement about two projects, not about two cities — the three above are the ones the atlas is willing to make at city level.

Official strategy and sources

↗ HCMC Urban Traffic Management and Control Center (UTMC)The organization driving the city's smart-city work.
📎 Cite this city

1001 Smart Cities (2026). “Smart-city projects in Ho Chi Minh City, Vietnam.” The Smart City Atlas. https://1001smartcities.org/cities/ho-chi-minh-city/ (last verified 2026-08-27). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.