clm-cab9ebe3c22a9b4c
quantitative
Houston Public Works began replacing the remote-read sensors on the city's roughly 480,000 water meters in 2021, aiming to finish within a decade
Permanent project revision
Revision 2026-11-04-evidence-baseline · effective 2026-11-03
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 18 claims and 5 source dossiers.
sha256:8c28bf8a683e1fad85c4018e4972ce5a483178a418f856f4d8f78d680837f513
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-cab9ebe3c22a9b4c
quantitative
Houston Public Works began replacing the remote-read sensors on the city's roughly 480,000 water meters in 2021, aiming to finish within a decade
clm-e0582aa0d44411c0
quantitative
by December 2023 only 78,905–85,000 had actually been swapped
clm-6beb1245731ba8bb
quantitative
more than 125,000 of the remote-read sensors already installed elsewhere in the system had stopped transmitting
clm-0eefa81a932be03d
descriptive
meaning some customers were being billed on estimates rather than real readings
clm-2228f386d74da886
descriptive
After a multi-year local-news investigation ('DRAINED') into unexplained bill spikes
clm-ffc0116a8d7162d2
quantitative
City Council approved an $8.5 million pilot in August 2025 to install 25,000 smart meters
clm-4896f44e25d547dc
descriptive
with no moving parts and near-real-time online usage data
clm-589baca5dd9c2645
descriptive
testing installation logistics across every council district ahead of a wider rollout
clm-f26ef8ad68dc1985
quantitative
The pilot started in March 2026; by May 2026, 1,200 meters had been replaced
clm-1ab6d39a9dc9abc6
quantitative
more than 240K meters still lacked updated remote-reading devices
clm-d54ea0e3a3877fc7
quantitative
More than 125,000 of the roughly 480,000-meter fleet's existing remote-read sensors had stopped transmitting by early 2024
clm-ec5293e068bce934
quantitative
only 78,905–85,000 sensors replaced under the 2021-started replacement project by December 2023
clm-eacfe7b58dd49d1a
quantitative
the city moved single-family customers to set-usage bills from April 2024
clm-b50b11a9eda3867d
quantitative
Public Works reported more than 120K remote-reading devices installed since April 2024 and automated reads averaging 86% across districts by May 2026
clm-011e71fa2d17f534
quantitative
The push also put the wrong meters on hundreds of homes; the city is crediting 637 affected customers
clm-5f067fb750c14b72
descriptive
Houston's own review found replacements outpaced by failures
clm-734f9ae58016b7d1
descriptive
the city had to put customers on set-usage bills while it caught up
clm-d5c169f164c4497d
descriptive
a wrong part in one large order left hundreds of homes on inaccurate meters for years
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:8c28bf8a683e1fad85c4018e4972ce5a483178a418f856f4d8f78d680837f513
src-78e95f515696d86e~480,000 total meters, 2021 project start, 78,905–85,000 replaced by Dec 2023, 125,000+ existing remote-read sensors non-functional
src-7e412475f3394b4eAug 2025 council approval of $8.5M/25,000-meter pilot, DRAINED billing investigation context, 315,000 meters over 20 years old, near-real-time online usage data
src-30339a008adb6c48Cited by press as the source underlying the program; PDF text could not be extracted for direct quoting
src-71f34f88736d4f98Houston Public Works' presentation of the Water Bill Improvement Plan to a council committee: about 125,000 remote-reading devices had failed, crews could manually read only about 40,000 meters a month, bills were estimated and later back-billed, and the replacement rate had been outpaced by failures. Single-family customers moved to set-usage bills from 1 April 2024 until their devices were upgraded.
src-4c506bf720979a49KPRC investigation: during the 2024 replacement push Public Works installed incompatible meter registers at hundreds of homes, causing inaccurate bills for years; the director traces it to a manufacturer shipping the wrong equipment in a large order at the end of 2022, and the city is calculating credits for the 637 affected customers.