clm-c02c76ef69232b64
quantitative
Casablanca opened its first two bus rapid transit lines, Casabusway BW1 and BW2, on 1 March 2024
Permanent project revision
Revision 2026-11-04-evidence-baseline · effective 2026-11-03
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 9 claims and 8 source dossiers.
sha256:0eddad078cc5efe2dec8490a4c560e14861d68fbbc6ed8e83aae2cd75613b956
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-c02c76ef69232b64
quantitative
Casablanca opened its first two bus rapid transit lines, Casabusway BW1 and BW2, on 1 March 2024
clm-b611a871a7e14adc
quantitative
roughly 24.5 km of segregated median corridor with 42 stations
clm-a6dd5d2827f17f8c
descriptive
run by RATP Dev Casablanca as one integrated network with the Casatramway
clm-c7eeeb64cbffbcb6
descriptive
buses get traffic-light priority at intersections to hold their commercial speed
clm-7522175a0abf028e
descriptive
stations and vehicles carry dynamic real-time information screens and CCTV
clm-99d6918e03f35f78
descriptive
a single interoperable smart card lets riders transfer freely between busway and tram
clm-3a7c1f440c108b8f
quantitative
The 40 Mercedes-Benz CapaCity articulated buses are conventional Euro-6 diesel, not electric.
clm-6dfb9fbdfd546fe5
descriptive
Signal-priority and efficiency benefits are described by the operator and authority; no independent measurement of speed or ridership gains is published.
clm-37b22b7b4e4114fe
descriptive
The data layer that makes this a BRT rather than a bus line is signal priority plus fare and real-time integration with the existing tram - the vehicles themselves are ordinary diesel.
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:0eddad078cc5efe2dec8490a4c560e14861d68fbbc6ed8e83aae2cd75613b956
src-e99bfda6a2804fcbOfficial Casabusway description, lines, screens, ticketing
src-dc6d6daa9444293aAuthority page for the busway
src-b81b525c1a75c10e1 Mar 2024 opening, 24.5 km/42 stations, Mercedes CapaCity Euro-6 diesel
src-e4ddda4a6c07b0664.784bn MAD tram+BHNS operations contract to 2029
src-3434caa9f1263089Integrated fare/smart card across busway and tram
src-b18d6cc13c3b6eb1Pre-opening presentation of the busway: dedicated corridor raised 14 cm, with priority managed by traffic lights at the intersections it crosses; vehicles equipped with security cameras and dynamic information screens.
src-11bf8529d528ecddCiting Casa Transports sources: more than 15,000 passengers on opening day (1 March 2024) and a daily average of around 23,000 by 14 March.
src-23c0ecbdb70b0865Operator's announcement of the entry into service of BW1 and BW2; buses and stops equipped for real-time monitoring of journeys.