TEPCO Smart Meter Rollout

🤖 AI-generated summary of the sources below · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means · What “source-checked” means

Tokyo Electric Power Company (TEPCO) replaced analogue meters across its Kanto-region service area with smart meters for roughly 28.4 million households and businesses, passing 20 million installs by March 2019 en route to completing the rollout by fiscal 2020. Units report usage every 30 minutes over a mesh and cellular network, cutting manual readings and speeding outage detection.

Live 📅 since 2014
Evidence🏛️ Officialgrades the sourcing — this entry states no impact figure
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🗺️ Regional

Sources

↗ TEPCO (operator)Official project page: scope (~28.4 million meters), FY2020 completion target, 30-minute reads, mesh/cellular network.
↗ Nikkei Asia (press)Independent coverage of TEPCO's accelerated smart-meter timeline and scale.
↗ T&D World (trade)Reports the 20-million-meter milestone reached by March 2019.
↗ RCR Wireless (press)Technical detail on the RF mesh/PLC/cellular Wi-SUN network architecture.
📎 Cite this project

1001 Smart Cities (2026). “TEPCO Smart Meter Rollout” — Tokyo, Japan. The Smart City Atlas. https://1001smartcities.org/projects/tokyo-smart-meter/ (last verified 2026-07-25). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS