A carbon-capture retrofit for Oslo's single biggest emitter was paused in 2023 when costs spiked. It restarted in 2025 — but the CO2 won't actually be captured until 2029.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,216 documented projects · 🏙️ 7 more in Oslo · 🌡️ Heat & cooling guide · ⚡ Energy projects
Hafslund Celsio (formerly Hafslund Oslo Celsio) is fitting its Klemetsrud waste-to-energy plant — Oslo's single largest greenhouse-gas emitter, source of 17% of the city's direct emissions, whose heat goes into district heating — with carbon capture. Paused in 2023 over rising costs, the project restarted after a January 2025 investment decision; civil works are under way, construction of the capture facility itself was scheduled to start in spring 2026, and operation is targeted for the third quarter of 2029, with captured CO2 shipped to offshore storage.
📊 Impact
Designed to capture 350,000 tonnes of CO2 a year — about 90% of the flue-gas CO2 from the plant, roughly 200,000 tonnes of it biogenic and so counted as negative emissions — once construction finishes; this is a planned/design capacity, not yet a measured operating result, since the capture facility itself has not been built. Captured CO2 is to be taken to the Port of Oslo and shipped to the Northern Lights terminal in Øygarden for permanent storage beneath the North Sea seabed.
🎓 Lesson
Klemetsrud's pause was a budget problem, and so was its fix: work stopped in 2023 when cost estimates exceeded the ceiling in the state funding agreement, and resumed only after a cost-reduction phase and a revised deal under which the state carries no further overrun risk and pays NOK 900 million of its support only once the plant is completed.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2022. 5 of 6 sources carry a publication date, from 13 June 2022 to 27 January 2025.
When the sources were published
- Klimaetaten, Oslo kommune (Klima Oslo) · city governmentCity of Oslo — Klima Oslo (city climate agency) · updated 13 March 2024
- Gassnova · national governmentGassnova — Klemetsrud carbon capture agreement signed
- Gassnova · national governmentCCS Norway — 'Celsio puts Klemetsrud carbon capture project on hold'
- NTB Kommunikasjon · platformHafslund Oslo Celsio — final investment decision announcement (via NTB)
- CCS Norway (Gassnova) — Langskip: Gjenopptar CO₂-fangstprosjektet i Oslo (27 Jan 2025)
Show your work What this page rests on and what it can’t tell you · all 20 claims with their sources · the forensic record
Evidence file · public beta 20 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 20
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2ff4dfe11feea738
descriptive
Hafslund Celsio (formerly Hafslund Oslo Celsio)
Sources carrying this claim
clm-fc8e823c2c6d17b6
descriptive
is fitting its Klemetsrud waste-to-energy plant
Sources carrying this claim
clm-a9d91578b2e3a612
descriptive
Oslo's single largest greenhouse-gas emitter
Sources carrying this claim
clm-2e8780d3a04a1a6a
quantitative
source of 17% of the city's direct emissions
Sources carrying this claim
clm-962a32f6593f1db0
descriptive
whose heat goes into district heating
Sources carrying this claim
clm-4a27bdb2d781a3b5
quantitative
Paused in 2023 over rising costs
Sources carrying this claim
clm-0dd1cb3766da6d1a
quantitative
the project restarted after a January 2025 investment decision
Sources carrying this claim
clm-fd83b4ff8a6f51fe
descriptive
civil works are under way
Sources carrying this claim
clm-723c57a9c698d9bd
quantitative
construction of the capture facility itself was scheduled to start in spring 2026
Sources carrying this claim
clm-38f0a0fd1435c037
quantitative
operation is targeted for the third quarter of 2029
Sources carrying this claim
clm-9a9444f77d683e77
quantitative
with captured CO2 shipped to offshore storage
Sources carrying this claim
clm-1007b3a30e8f9423
quantitative
Designed to capture 350,000 tonnes of CO2 a year
Sources carrying this claim
clm-76aed0bf193de674
quantitative
about 90% of the flue-gas CO2 from the plant
Sources carrying this claim
clm-1470993a351307f5
quantitative
roughly 200,000 tonnes of it biogenic and so counted as negative emissions
Sources carrying this claim
clm-f13a2aa51ec70fe4
descriptive
since the capture facility itself has not been built
Sources carrying this claim
clm-92ba25f198255084
quantitative
Captured CO2 is to be taken to the Port of Oslo and shipped to the Northern Lights terminal in Øygarden for permanent storage beneath the North Sea seabed.
Sources carrying this claim
clm-02d85206d7d41034
quantitative
work stopped in 2023 when cost estimates exceeded the ceiling in the state funding agreement
Sources carrying this claim
clm-551a468e741ad6ae
descriptive
resumed only after a cost-reduction phase
Sources carrying this claim
clm-18cab717d7d18e54
descriptive
a revised deal under which the state carries no further overrun risk
Sources carrying this claim
clm-28ad4c0f3c333469
quantitative
pays NOK 900 million of its support only once the plant is completed
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:6009803554d9d79968aa7889250e4548c5a347a5fd3f456bdd0afa63e57e60b0
- 20
- of 20 claims mapped
- 6
- source dossiers
- 5
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Hafslund Oslo Celsio (formerly Fortum Oslo Varme; owned by Hafslund Eco 60%, Infranode 20%, HitecVision 20%)
- Actor types
- utility, private, national-government, city-government
- Funding model
- Not recorded
- Funding description
- Norwegian state 'Longship' (Langskip) programme (~NOK 2.5bn capex support + ~NOK 4.4bn over 10 years for opex/transport/storage) + Oslo Municipality (NOK 2.6bn via preference shares) + Hafslund Celsio equity (NOK 4.3bn) — no confirmed EU funding for this specific project (an EU Innovation Fund application was unsuccessful in 2021)
- Cost
- ≈NOK 9.5bn (2024 value, P85 budget)
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
CCS Norway / Gassnova (Norwegian state CCS programme) — Klemetsrud project page
- Stable source ID
src-d860998c97e2689b- Publisher
- Name not classified · ccsnorway.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Official state programme page: current owner, construction status, 350,000 t/yr capacity, Q3 2029 target, 2023 pause.
Hafslund Oslo Celsio — final investment decision announcement (via NTB)
- Stable source ID
src-7a816c75d4f6c84b- Publisher
- Name not classified · kommunikasjon.ntb.no
- Type / language
- web-page · language not classified
- Published
- 2025-01-27
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator's own release: 24 Jan 2025 FID, capacity, full funding breakdown by state/municipality/company.
Gassnova — Klemetsrud carbon capture agreement signed
- Stable source ID
src-8f02e70c12d101f9- Publisher
- Name not classified · gassnova.no
- Type / language
- web-page · language not classified
- Published
- 2022-06-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
State agency page confirming Klemetsrud's place in the Longship programme and the Northern Lights transport/storage link.
- Claims linked
City of Oslo — Klima Oslo (city climate agency)
- Stable source ID
src-79e40c9bbb28725c- Publisher
- Name not classified · klimaoslo.no
- Type / language
- web-page · language not classified
- Published
- 2022-06-13
- Updated
- 2024-03-13
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
City of Oslo's own account of the plant's 17% share of the city's direct emissions and the 2023 delay.
CCS Norway — 'Celsio puts Klemetsrud carbon capture project on hold'
- Stable source ID
src-51d75243fd19fb4e- Publisher
- Name not classified · ccsnorway.com
- Type / language
- web-page · language not classified
- Published
- 2023-04-28
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Documents the spring 2023 pause over rising cost estimates.
CCS Norway (Gassnova) — Langskip: Gjenopptar CO₂-fangstprosjektet i Oslo (27 Jan 2025)
- Stable source ID
src-85beb9d1ee4bdb29- Publisher
- Name not classified · ccsnorway.com
- Type / language
- web-page · language not classified
- Published
- 2025-01-27
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Gassnova news item on the restart: under the revised support agreement the state gives no further grants or risk relief if costs overrun, and NOK 900 million of the state support is paid as a start-up grant on completion.
- Claims linked
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Klemetsrud Waste-to-Energy Carbon Capture (CCS)” — Oslo, Norway. The Smart City Atlas. https://1001smartcities.org/projects/oslo-klemetsrud-carbon-capture/ (last verified 2026-10-05). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.