Busan New Port West Container Terminal Phase 2-5
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
6 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Updated 22 Aug 2026 Publication date recorded for 8 sources. What changed →
Yard cranes and carriers run unsupervised; the nine ship-to-shore cranes do not, because wind and swell move the ship. And no dockworker was cut: the existing crew was moved and retrained.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 9 more in Busan · 🚗 Autonomous vehicles guide · 🚲 Mobility projects
Korea's first fully automated container terminal opened at Busan New Port in April 2024: the West Container Terminal's Phase 2-5, three berths run by Dongwon Global Terminal Busan on a quay the Busan Port Authority built for about 1.14 trillion won. Yard cranes and driverless carriers work unsupervised; the nine ship-to-shore cranes are still remote-controlled by staff, because wind and swell move the ship. Most equipment is Korean-built, though 12 of the first 55 carriers came from Dutch supplier VDL. Dockworkers' unions oppose port automation; here the operator relocated and retrained an existing North Port crew rather than cutting it.
🎓 Lesson
Automation and job cuts are separable. The union settlement at Busan held because an entire existing crew was moved across from an older berth and retrained, not replaced.
Sources
Show 3 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2024. 8 of 8 sources carry a publication date, from 26 October 2023 to 29 January 2026.
When the sources were published
- Busan Ilbo (부산일보) · pressBusan Ilbo — Phase 2-5 completion and demonstration
- 머니투데이방송 (MTN) · pressMTN — report from the domestically built automated terminal
- Monthly Maritime Korea · pressMonthly Maritime Korea — all existing dockworkers succeeded at Phase 2-5
- Busan Ilbo (부산일보) · pressBusan Ilbo — inside Korea's first fully automated berth
- The Maritime Executive · pressThe Maritime Executive — Busan launches first automated container terminal
- Monthly Maritime Korea · pressMonthly Maritime Korea — field report six months after opening
- World Cargo News · pressWorldCargo News — Hyundai Rotem follow-up AGV order
- Haesa Economy · pressHaesa Economy — Ministry of Oceans and Fisheries 2025 port statistics
What happened to this record
- Sources last read
- Entered the record
- Publication date recorded for 8 sources
Show your work What this page rests on and what it can’t tell you · all 6 claims with their sources · the forensic record
Evidence Passport · public beta 6 addressable claims, 8 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 6
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-28456ff68c70421b
quantitative
Korea's first fully automated container terminal opened at Busan New Port in April 2024: the West Container Terminal's Phase 2-5, three berths run by Dongwon Global Terminal Busan on a quay the Busan Port Authority built for about 1.14 trillion won
Sources carrying this claim
clm-6bb768dcb5a2264f
descriptive
Yard cranes and driverless carriers work unsupervised; the nine ship-to-shore cranes are still remote-controlled by staff, because wind and swell move the ship
Sources carrying this claim
clm-85fa52073346f890
quantitative
Most equipment is Korean-built, though 12 of the first 55 carriers came from Dutch supplier VDL
Sources carrying this claim
clm-831169e9f002b4cd
descriptive
Dockworkers' unions oppose port automation; here the operator relocated and retrained an existing North Port crew rather than cutting it
Sources carrying this claim
clm-393543fb4c3a9ba9
quantitative
Three berths rated at 1.95 million TEU a year, watched by about 32 control-room staff; the operator projects 20-30% higher productivity than semi-automated berths, a forecast rather than a measured result
Sources carrying this claim
clm-ab72ad4f0fe069b1
descriptive
The union settlement at Busan held because an entire existing crew was moved across from an older berth and retrained, not replaced
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:c66b18d1ca220b294eca6eccc8a5098d69a4534aa09f226290ee44bf2825e29d
- 6
- of 6 claims mapped
- 8
- source dossiers
- 8
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Dongwon Global Terminal Busan; quay built and owned by the Busan Port Authority
- Actor types
- private
- Funding model
- public
- Funding description
- Busan Port Authority (state-owned)
- Cost
- ≈KRW 1.14 trillion, incl. ≈KRW 340bn of handling equipment
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
8 source dossiers
Monthly Maritime Korea — field report six months after opening
- Stable source ID
src-0139ea785673b5ac- Publisher
- Name not classified · monthlymaritimekorea.com
- Type / language
- web-page · language not classified
- Published
- 2024-09-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator DGT, opening April 2024, 9 quay cranes, 46 yard cranes, 60 AGVs, 1,050 m quay, 20 m depth, 1.95m TEU capacity; states quay cranes are remote-controlled while yard cranes and AGVs run automatically, and carries the 20-30% productivity projection.
- Claims linked
Busan Ilbo — inside Korea's first fully automated berth
- Stable source ID
src-abce279f1674a385- Publisher
- Name not classified · busan.com
- Type / language
- web-page · language not classified
- Published
- 2024-04-01
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Opening on 5 April 2024 as Busan New Port Pier 7 (West Container Terminal Phase 2-5), operator Dongwon Global Terminal Busan, control room in operation, equipment counts.
- Claims linked
MTN — report from the domestically built automated terminal
- Stable source ID
src-d633d3143fbb8638- Publisher
- Name not classified · news.mtn.co.kr
- Type / language
- web-page · language not classified
- Published
- 2023-12-04
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Total project cost 1.144 trillion won, developed directly by the Busan Port Authority; initial AGV fleet of 55 units, 43 by Hyundai Rotem and 12 imported from VDL of the Netherlands; about 32 monitoring staff; a DGT executive quoted on displaced crane labour.
Monthly Maritime Korea — all existing dockworkers succeeded at Phase 2-5
- Stable source ID
src-e6f0d124ba3d6bf2- Publisher
- Name not classified · monthlymaritimekorea.com
- Type / language
- web-page · language not classified
- Published
- 2024-02-28
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
BPA and DGT agreement to transfer all existing workers: 260 succeeding workers, 132 of them Busan Port Transport Union members, 54 retrained on automated equipment and 9 union members trained as remote crane operators; the union cites a 2021 Korea Labor Institute estimate of 70-80% job loss from full automation.
- Claims linked
Busan Ilbo — Phase 2-5 completion and demonstration
- Stable source ID
src-32f359d0a2c8f977- Publisher
- Name not classified · busan.com
- Type / language
- web-page · language not classified
- Published
- 2023-10-26
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Quay completed October 2023 ahead of commercial opening: 3 berths, 1,050 m, 837,237 sq m, 1.95m TEU annual capacity, about 340bn won spent on domestically made handling equipment.
- Claims linked
Haesa Economy — Ministry of Oceans and Fisheries 2025 port statistics
- Stable source ID
src-0fd28ae9b4f6629e- Publisher
- Name not classified · ihaesa.com
- Type / language
- web-page · language not classified
- Published
- 2026-01-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Scale context for the host port: Busan handled 24.88 million TEU in 2025, up 2.0% on 24.40 million in 2024, with transshipment at 14.1 million TEU.
- Claims linked
- Background source; no baseline claim points here
WorldCargo News — Hyundai Rotem follow-up AGV order
- Stable source ID
src-2e7603106e4b8b60- Publisher
- Name not classified · worldcargonews.com
- Type / language
- web-page · language not classified
- Published
- 2025-07-21
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Currency check, July 2025: a further AGV order takes Hyundai Rotem's cumulative delivery to DGT to 100 vehicles, confirming the terminal is operating and expanding.
- Claims linked
The Maritime Executive — Busan launches first automated container terminal
- Stable source ID
src-6fa3366392c094d8- Publisher
- Name not classified · maritime-executive.com
- Type / language
- web-page · language not classified
- Published
- 2024-04-07
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
English-language confirmation of the launch as South Korea's first automated container terminal and of the ministry's up-to-20% productivity projection.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Busan New Port West Container Terminal Phase 2-5” — Busan, South Korea. The Smart City Atlas. https://1001smartcities.org/projects/busan-new-port-automated-terminal/ (last verified 2026-07-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
