Caesb, the Federal District's publicly owned water and sanitation company, began fitting wireless sensors to the control valves on its main distribution networks in November 2023, under a R$5.2 million contract covering 754 measurement points. The readings are watched from the control rooms of Caesb's Centro-Norte and Oeste-Sul network operation and maintenance superintendencies, and the diagnostic is simple: if flow rises while pressure falls, that indicates a burst; if pressure is uniformly low, an area is about to run dry. By May 2024, 378 of the 754 points had been installed — half the contract — and the company said the rest would follow by that July. The telemetry sits on top of a longer loss-reduction programme financed with a R$170 million Inter-American Development Bank loan, which sectorised the distribution network into metered control districts, georeferenced the pipe register and put pressure-reducing valves under remote control. A separate and earlier Caesb programme put IoT consumption telemetry on the meters of large customers from 2019; that is a different contract with a different purpose.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →🎓 Lesson
Caesb has published no figure for what the pressure telemetry changed. Its loss-reduction reporting belongs to the earlier IDB-financed programme, whose own target — 250 litres per connection per day by the end of 2019 — predates the sensors and cannot be credited to them. The claim the company does make is narrower and more plausible: finding a burst faster shortens the interruption. Nor could the July 2024 completion promise be verified: no Caesb statement after May 2024 confirms the remaining 376 points went in.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Caesb Water Network Pressure Telemetry” — Brasília, Brazil. The Smart City Atlas. https://1001smartcities.org/projects/brasilia-caesb-pressure-telemetry/ (last verified 2026-08-10). Data: CC BY 4.0.