The Algiers metro opened on 31 October 2011 with a Siemens turnkey system: Trainguard MT communications-based train control with moving block and automatic train operation, Airlink track-to-train radio, Digiloc train location, ticketing, and a central control post at Ruisseau from which the line is supervised. Siemens describes the on-train element as driving-assistance automation. The 16.8 km network reaches ten communes with sixteen trainsets; three extensions are under construction, towards Houari Boumédiène airport, Aïn Naâdja–Baraki and Place des Martyrs.

Live 📅 since 2011

🎓 Lesson

CBTC with ATO is a capability, not a staffing decision. The Algiers metro has had the signalling for automatic operation since the day it opened in 2011 and still runs with a driver in every cab; in fifteen years no operator, ministry or supplier statement has given a date from which trains would run unattended. The useful question about any 'automated' metro is never which grade the equipment supports, but which document names the day the cab empties.

Sources

↗ International Railway Journal (trade press)Load-bearing for the signalling: Siemens supplies Trainguard MT CBTC plus Airlink track-to-train data radio and Digiloc train location; the Line 1 CBTC 'uses moving block with an absolute stopping distance and incorporates automatic train operation (ATO)'. ATO is stated; unattended operation is not.
↗ Ville, Rail & Transports (trade press)Siemens' own framing of what it supplies, verbatim: 'les automatismes d'aide à la conduite CBTC Trainguard MT, la transmission radio Airlink (pour les données voie-train) et la localisation des trains Digiloc'. 'Aide à la conduite' — driving assistance — is the supplier's word, not the atlas's. Client is 'l'Ema (Entreprise Métro d'Alger)'; the extension order was worth about €20M.
↗ Algerie Eco (press, quoting SEMA)Current operations, 12 June 2025: 'Le métro d'Alger transporte en moyenne 150 000 voyageurs par jour'; more than 50 million passengers in 2024; 16.8 km over ten communes; sixteen trainsets in service; 23 new trainsets to be acquired by 2026 for the airport and Baraki extensions. Operator named as the Société d'exploitation du métro d'Alger. Capacity-as-demand check: 50M/year and 150,000/day are mutually consistent (~137k/day), so these read as carried passengers, not a supplier design capacity.
↗ Agence Ecofin (press)Operator history: RATP El Djazaïr's operating contract was not renewed and ended in October 2020; since 1 November 2020 the metro has been run by an Algerian public company under the Métro El Djazaïr brand, a subsidiary of Entreprise Métro d'Alger (EMA).
📎 Cite this project

1001 Smart Cities (2026). “Algiers Metro CBTC and Central Control Post” — Algiers, Algeria. The Smart City Atlas. https://1001smartcities.org/projects/algiers-metro-cbtc/ (last verified 2026-08-06). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next verified smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS