The Algiers metro opened on 31 October 2011 with a Siemens turnkey system: Trainguard MT communications-based train control with moving block and automatic train operation, Airlink track-to-train radio, Digiloc train location, ticketing, and a central control post at Ruisseau from which the line is supervised. Siemens describes the on-train element as driving-assistance automation. The 16.8 km network reaches ten communes with sixteen trainsets; three extensions are under construction, towards Houari Boumédiène airport, Aïn Naâdja–Baraki and Place des Martyrs.
🎓 Lesson
CBTC with ATO is a capability, not a staffing decision. The Algiers metro has had the signalling for automatic operation since the day it opened in 2011 and still runs with a driver in every cab; in fifteen years no operator, ministry or supplier statement has given a date from which trains would run unattended. The useful question about any 'automated' metro is never which grade the equipment supports, but which document names the day the cab empties.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Algiers Metro CBTC and Central Control Post” — Algiers, Algeria. The Smart City Atlas. https://1001smartcities.org/projects/algiers-metro-cbtc/ (last verified 2026-08-06). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.