Alexandria Water Company's Control Centre — and a Loss Curve It Did Not Draw

🤖 AI-generated summary of the sources below · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means

On 14 July 2025 the prime minister opened a control and command centre at the Alexandria Water Company, which the company calls the first among the national holding company's subsidiaries. It runs SCADA to watch pressures at the stations, a GIS layer over the network, a laboratory system for water quality and a camera system, staffed around the clock behind six reporting lines. Five months earlier, on a ministerial visit, the chairman had given the company's non-revenue water as 23.5 per cent, down from 37.2, with a target of 19 — and attributed it to pipe work, not to instruments.

Live 📅 since 2025

📊 Impact

Non-revenue water reported down from 37.2% to 23.5%, with a target of 19% (chairman Ahmed Gaber, 5 February 2025). The company credits replacement and renewal in the Agami, Abis and Abdel Qader hotspots, filter-water recycling, more than 1.3 million water-saving devices and over 300,000 prepaid water meters — not the control centre, which opened five months later. Operator self-report; no regulator publishes an Alexandria figure.

🎓 Lesson

A control room is not a leak-finding layer. Nothing in the descriptions of Alexandria's mentions district metered areas or minimum night flow, the measurement that actually locates losses, and no number out of it is published — so the utility's own loss curve has to be taken on its word. Cairo's water company has the reverse problem: plant automation and no network telemetry either.

Sources

↗ Masrawy, 14 July 2025 (media)Opening by Prime Minister Mostafa Madbouly on 14 July 2025. Verbatim: 'برامج متخصصة مثل الإسكادا لمراقبة المحطات وGIS لرصد الشبكات' — 'specialised programs such as SCADA for monitoring the stations and GIS for surveying the networks'; camera and security systems; operates around the clock over six main lines receiving reports; positioned as the first of its kind among the holding company's subsidiaries.
↗ Youm7, 5 February 2025 (media)Company chairman Eng. Ahmed Gaber during a visit by deputy housing minister Sayed Ismail. Verbatim: 'تم تقليل نسبة الفاقد من المياه من 37.2% إلى 23.5% وأن الشركة تعمل جاهدة لإيصال النسبة إلى 19%'. The measures he lists are replacement and renewal in Agami, Abis and Abdel Qader, filter-water recycling, 1.3 million+ water-saving devices, 300,000+ prepaid meters and TSM certification across the company's ten plants — no telemetry.
↗ Alexandria Water Company portal (operator)The company's own site; used only to confirm the utility's identity and remit. It publishes no operational data series.
📎 Cite this project

1001 Smart Cities (2026). “Alexandria Water Company's Control Centre — and a Loss Curve It Did Not Draw” — Alexandria, Egypt. The Smart City Atlas. https://1001smartcities.org/projects/alexandria-water-control-centre/ (last verified 2026-08-06). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.