Kretslopp och vatten, an administration of the City of Gothenburg, publishes a cloudburst map
Permanent project revision
Revision 2026-11-12-baseline · effective 2026-11-11
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 22 claims and 13 source dossiers.
sha256:59d6679dbee1307bd1b829ab3c2f3d38277754d5f906f9804d5a6ff8b9943b03
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-22168ee35432d4c4
descriptive
Kretslopp och vatten, an administration of the City of Gothenburg, publishes a cloudburst map
clm-5d5f6f03f60238ce
quantitative
showing the maximum water depth a so-called 100-year rain could leave across the city
clm-1166bde949c3d74c
quantitative
100 mm in six hours, half of it within half an hour, with the effect of climate change up to 2100 taken into account
clm-d5dccf4dd802d5ce
descriptive
According to the map, some areas could flood with more than a metre of water.
clm-a3594b6833cc44b6
descriptive
in the department's cloudburst analyses a surface-flow model is coupled to its hydraulic model of the sewer network
clm-7cb09098380900b3
descriptive
the map does not show exactly how a single house is affected and that more rain can fall than the calculation shows
clm-958b46b8517f7d77
quantitative
the flood-risk supplement to the comprehensive plan, adopted by the city council on 25 April 2019
clm-b737300aa59ed5fb
quantitative
new buildings must not be damaged by a climate-adapted 100-year rain
clm-0f309b6b3625e834
descriptive
the department proposes cloudburst measures in plans for new development when needed
clm-ce408ba1385f5668
quantitative
the department's 2023 model showed that Bergslagsparken needs to handle about 850 m³ of cloudburst water
clm-c7dca46605d68273
quantitative
the department recommended a plan rule placing finished floors at least 0.3 metres above the ground at the flow path outside the entrance, and no lower than +2.8
clm-24555b4c5e4a9905
quantitative
an embankment finished at the end of May 2025 can hold up to 3,000 m³
clm-1b83940fe3de89b6
descriptive
is calculated to cut the water depth around important parts of Östra Hospital by up to a metre
clm-da169944d2fd8cb8
quantitative
only a third of residents knew how to prepare for a cloudburst, the same result as in 2022
clm-41b39ab7f4da9201
descriptive
knowledge of where and how a cloudburst would flood the city was extensive, but only a few cloudburst facilities had been built and few were planned
clm-989f4d31f67a9b54
descriptive
not enough city-wide decisions had been taken on what to achieve and at what pace
clm-e6c6c3f0d58c2529
descriptive
The rule binds only what is new
clm-4f9321e74419cafd
descriptive
the city's pipes are built for normal rain with a ten-year return period, and protecting an existing building from heavier rain is its owner's responsibility
clm-bb3f14069d56016a
quantitative
protecting the city from cloudburst damage would take storage equal to 15 Karlatornet towers, hard to build underground because the ground is already full of pipes and other infrastructure
clm-082d9770e00a4c20
quantitative
in the worst case, the department said in 2024, no cloudburst warning comes in advance at all
clm-5f81b43c7b778327
descriptive
the department, the wastewater company Gryaab and the Port of Gothenburg work on the city's climate adaptation plan appropriately
clm-70b1b3559ea7ffba
quantitative
in May 2026 the city put an updated version of the flood-risk rules out for review
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:59d6679dbee1307bd1b829ab3c2f3d38277754d5f906f9804d5a6ff8b9943b03
src-364b4ab4b9ce5c28The cloudburst map itself, made by Kretslopp och vatten. It shows the maximum water depths to be expected in a so-called 100-year rain, defined as 100 mm in six hours with half of it falling in half an hour, with the effect of climate change up to 2100 taken into account. The page warns that the map does not show exactly how a specific house is affected and that more rain can fall than the calculation shows.
src-9d6b65b1ba8a571fThe city's page on responsibilities: the municipal water and sewer network must cope with normal rain, defined as rain with a ten-year return period, while property owners must protect their own property against flooding from heavier rain, including cloudbursts.
src-509b10c42c1bc016How the city works on stormwater and cloudbursts: Kretslopp och vatten proposes cloudburst measures in plans for new development when needed, seven city administrations signed a cloudburst agreement in 2021, and because plans take years to be realised, only isolated cloudburst facilities have been built so far.
src-30bf9c951fe27e60A cloudburst analysis prepared by the consultancy DHI for Kretslopp och vatten for a detailed plan in Lundby. It describes the method: an existing MIKE 21 surface model is coupled to the hydraulic sewer network model (MIKE URBAN) built by Kretslopp och vatten, and loaded with a climate-adjusted 100-year rain of six hours.
src-2e2a825849168413Kretslopp och vatten's cloudburst analysis for the detailed plan at Kämpegatan, north of the Central Station. It quotes the flood-risk supplement's requirement that new buildings must not be damaged by a climate-adapted 100-year rain, uses the department's 2023 cloudburst model to set a volume of about 850 m³ for Bergslagsparken, and recommends a plan rule on the lowest finished floor level.
src-e048455bbc8e4d21An annex to a city committee's consultation response, summarising the proposed amendment of the comprehensive plan. It states that the new climate-adaptation chapter builds mainly on the thematic supplement on flood risks, adopted by the city council on 25 April 2019; the annex itself carries no date.
src-990e9b1a43785375Kretslopp och vatten's press release launching the city's 'cloudburst season'. An engineer working on the department's cloudburst strategy says that in the worst case no cloudburst warning comes in advance, and the release states that Gothenburg had not yet been hit by a real cloudburst.
src-89b4d30f36770498Kretslopp och vatten's campaign release. According to the cloudburst map some areas could flood with more than a metre of water; the city's citizen survey, carried out by Statistics Sweden, found that only a third of residents knew how to prepare for a cloudburst, the same result as in 2022; and protecting the city from cloudburst damage would require storage equal to 15 Karlatornet towers, hard to build underground.
src-7304528d1460ba82Release on the cloudburst facility in Stabbeparken, south of Östra Hospital: a gabion embankment built from November 2024 to the end of May 2025 that can hold up to 3,000 m³ and is calculated to reduce water depth around important hospital operations by up to a metre in a heavy cloudburst.
src-7b162a6ecd196e34The city audit office's release on its review of cloudburst management: knowledge of where and how the city will flood in a cloudburst is extensive, but only a few cloudburst facilities have been built and few are planned; responsibilities and goals need to be clearer, and there has been no overall follow-up.
src-c4a02d588ebdec65The audit office's account of its 2022 review of the Kretslopp och vatten committee. It summarises the cloudburst review decided on 21 February 2023: not enough city-wide decisions on what the city is to achieve and at what pace, unclear responsibilities and insufficient follow-up, and it notes that binding law covers new detailed plans but not existing buildings.
src-a827b9b05f08fcbeThe audit office's annual report for 2025, sent to the city council. Its review of the city's climate adaptation plan 2024–2026 found that Gryaab, the Port of Gothenburg and the Kretslopp och vatten committee work on climate adaptation appropriately and that the work is organised, steered and followed up.
src-f09a3b2855a57602The review version of the comprehensive-plan amendment, which works the flood-risk supplement into the plan and updates it. Its cloudburst section says facilities for diverting and retaining surplus water are sized so that a climate-adapted 100-year rain does not damage buildings and infrastructure.