The South Dade TransitWay has been a bus-only road since February 1997; what opened on 27 October 2025 was its data layer. Miami-Dade's Department of Transportation and Public Works rebuilt the 20-mile corridor with 14 fare-gated stations — off-board payment by EASY Card, contactless bank card or QR ticket, level boarding, real-time arrival displays — plus crossing gate arms and traffic signal preemption meant to hold a green for peak-direction express buses. On the first morning the preemption did not work: the county blamed test programming still in the system, unauthorised vehicles on the busway and drivers blocking intersections, and announced a 90-day optimisation period. The county had chosen this over rail, its Transportation Planning Organization selecting BRT as the locally preferred alternative on 30 August 2018 against a far costlier Metrorail extension. The line still does not enter the City of Miami: it runs entirely through southern Miami-Dade and ends at Dadeland South in unincorporated Kendall, where riders transfer to Metrorail for downtown.

Live 📅 since 2025
Scale🗺️ Regional
Cost$368.2M design-build contract (the FTA profile had estimated $299.81M in year-of-expenditure dollars)
Funding$100M FTA Small Starts, $100M FDOT, $100M county half-penny transportation surtax

📊 Impact

The FTA's Small Starts profile justified its $100M share on a forecast of 14,700 daily linked trips in the 2018 base year, rising to 20,600 by 2040. The county's own ridership report for December 2025 counts 5,240 average weekday boardings on BRT route 601 and 4,113 on the parallel local route 602 — 9,353 together, against 7,950 on the three routes (34, 38, 39) the conversion discontinued. Boardings and linked trips are different units, a linked trip often covering more than one boarding, so the distance to the forecast is at least this wide. Route 601 slipped 4.2 percent from November to December 2025, and Dadeland South Metrorail alone supplied 2,073 of its 5,240 weekday boardings.

🎓 Lesson

A rebuilt corridor is only as fast as the signals it is allowed to hold: Miami-Dade bought preemption hardware and gate arms and then found on day one that the binding constraint was signal programming and enforcement against drivers in the busway, not equipment. And a line that ends at someone else's rail station inherits that station's reach rather than its own — two fifths of the BRT's boardings happen at the transfer point.

Sources

↗ Miami-Dade DTPW — Metro Express Bus Rapid Transit ServiceLaunch on 27 October 2025, 20 miles, 14 stations from SW 344th Street Park-and-Ride to Dadeland South, real-time arrival displays, design-build contract value $368,233,493.42, and the $100M federal / $100M state / $100M local split.
↗ Miami-Dade DTPW — Metro Express ServiceCarries the operating data layer: 'preemption and priority signaling', 'Real-time bus arrival displays at each station and the GO Miami-Dade Transit app', 7.5/15/30-minute headways and pre-boarding fare collection.
↗ Miami-Dade DTPW — SMART Plan: South Dade TransitWay CorridorNames 'Traffic Signal Preemption (TSP) technology' and gate arms at intersections, and dates the Transportation Planning Organization's vote for BRT as the locally preferred alternative to 30 August 2018; groundbreaking 4 June 2021.
↗ Federal Transit Administration — South Corridor Rapid Transit Project profile (Small Starts, rating assigned November 2019)Carries the forecast: 14,700 daily linked trips (2018) and 20,600 (2040); $299.81M total capital cost with a $100.00M CIG share (33.4%); describes the project as 'implementing signal preemption for buses and installing crossing gate arms'; anticipated revenue service in 2022.
↗ Miami-Dade DTPW — Ridership Technical Report, December 2025 (PDF)Measured side: route 601 at 5,240 average weekday boardings (−4.2% on November) and 602 at 4,113; a per-station BRT table showing Dadeland South Metrorail at 2,073; and the footnote that routes 34, 38 and 39 were discontinued effective 27 October 2025.
↗ Miami-Dade DTPW — Ridership Technical Report, July 2025 (PDF)Pre-conversion baseline from the same series: average weekday boardings of 5,511 on route 38 Transitway MAX, 1,579 on route 34 and 860 on route 39 Transitway Express.
↗ Douglas Hanks, Miami Herald (syndicated by Governing), 28 October 2025Opening-morning failure of the signal preemption, the county's three named causes (test programming still in the system, unauthorised vehicles on the busway, drivers blocking the box), the 90-day optimisation period, and a rider's 23-minute trip against 20 minutes on the old bus.
↗ WLRN, 6 October 2025Preemption is directional and peak-only (northbound in the morning, southbound in the afternoon); gate arms work like railroad crossings; the promise was roughly one hour end to end against about two on US-1.
↗ Miami-Dade Transit — Open Data FeedsStatic GTFS is a public download, while GTFS-realtime for buses, Metrorail and Metromover is served through Swiftly and requires requesting access — the real-time layer is published but gated.
↗ Sustainable Bus — Miami-Dade launches Metro Express (2025)60-foot articulated New Flyer battery-electric buses; the 'longest fully electric BRT corridor in the US' is the county's own claim, which the outlet weighs against LA Metro's G Line (~18 miles) and Indianapolis's Red Line (13 miles).
📎 Cite this project

1001 Smart Cities (2026). “Metro Express BRT on the South Dade TransitWay” — Miami, United States. The Smart City Atlas. https://1001smartcities.org/projects/miami-metro-express-brt/ (last verified 2026-08-07). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.