Luanda's signalised junctions were installed and operated under contract — first by the Brazilian firm Odebrecht, then by the Serbian company Valtacom, which withdrew over a debt reported at US$13 million — before the Provincial Government of Luanda took them over. They were monitored centrally from the National Police's Unidade Operativa de Luanda over fibre-optic cable. In July 2024 the newspaper Expansão reported that this central structure was itself out of order and that 125 of 138 signalised junctions were out of service, mainly because fibre cables, batteries and other components had been vandalised or stolen. Replacement was ruled out for lack of funds, so the province repairs what exists: 24 junctions on seven avenues by December 2024, four of which had already been vandalised again. A central control room, to be called SCTV, was still at the technical-survey stage with the firms Ngassakidila and Kubata. Recent rehabilitation work has been carried out by Dahua Technology Angola.
📊 Impact
Expansão, 30 July 2024: 'Dos 138 cruzamentos com semáforos, 125 estão fora de serviço' — 13 working, and the central monitoring structure at the National Police's Unidade Operativa de Luanda 'de momento se encontra avariada'. The provincial transport, traffic and urban mobility directorate, quoted by Novo Jornal on 1 November 2025: of 110 junctions 'somente trinta (27%) estão operacionais', and 'Não há, até ao momento, uma data definida para recuperar os 80 cruzamentos semafóricos fora de serviço'. The two counts use different totals, 138 and 110, and neither authority explains the difference; the value of the latest rehabilitation contract 'não foi divulgado'.
🎓 Lesson
The fragile part of a networked signal system is the network, not the signal. Luanda's controllers still stand at the junctions; what failed was the fibre that connected them and the room that watched them — and the contractor who ran it left over an unpaid bill rather than a technical problem.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Luanda's Traffic Signals: The Control Room That Stopped Working” — Luanda, Angola. The Smart City Atlas. https://1001smartcities.org/projects/luanda-traffic-signals/ (last verified 2026-08-06). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.