Green Line CBTC Signalling & Automatic Train Operation (Kolkata Metro)
India's oldest metro network added Communications-Based Train Control to its newest corridor, the Green Line (East-West Line), which opened in phases from March 2024 and includes a 520-metre tunnel under the Hooghly River. Hitachi Rail STS India built the CBTC system to Grade of Automation 2 for KMRC — trains run under continuous automatic protection and operation, but a driver stays aboard to close doors and start the train, not the fully "driverless" service some 2026 coverage implies. Metro Railway, Kolkata has been trial-running Automatic Train Operation on the corridor since August 2025, and the Commissioner of Railway Safety carried out a final inspection in July 2026 — but as of that inspection, formal clearance to actually run in automatic mode was still pending.
🎓 Lesson
A metro line can run for years on automation-ready signalling before it is actually cleared to operate automatically — the infrastructure and the safety certification are different projects with different timelines.
📖 Terms in this entry: Adaptive traffic signals · Bus rapid transit (BRT) · CBTC (communications-based train control)
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Green Line CBTC Signalling & Automatic Train Operation (Kolkata Metro)” — Kolkata, India. The Smart City Atlas. https://1001smartcities.org/projects/kolkata-metro-green-line-cbtc-ato/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.