Pune Metro's CBTC Signalling (Lines 1 & 2)
Maha Metro equipped Pune Metro's Purple (Line 1) and Aqua (Line 2) lines with Alstom's Urbalis 400 communication-based train control (CBTC) system, contracted in 2019 to control 31 trains across a 32km network. The Aqua Line's first CBTC-signalled section (Vanaz-Garware College) opened 6 March 2022, extended to Ruby Hall Clinic in August 2023 and to Ramwadi in March 2024; the Purple Line's final section (District Court-Swargate) opened 29 September 2024, completing CBTC coverage across both lines. Trains run under Automatic Train Protection/Automatic Train Operation with a driver aboard for door operation and monitoring — this is supervised (GoA2) automation, not unattended operation.
🎓 Lesson
CBTC signalling and unattended train operation are not the same commitment — Pune's system delivers tighter, safer headways under a supervising driver, not the driverless capability CBTC theoretically enables.
📖 Terms in this entry: Adaptive traffic signals · Bus rapid transit (BRT) · CBTC (communications-based train control)
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Pune Metro's CBTC Signalling (Lines 1 & 2)” — Pune, India. The Smart City Atlas. https://1001smartcities.org/projects/pune-metro-cbtc-signaling/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.