K-Electric's Published Feeder-Level Load-Shedding Regime
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Updated 21 Aug 2026 Publication date recorded for 5 sources. · 2 revisions in all What changed →
K-Electric, the privately owned utility that serves Karachi, publishes a weekly feeder-by-feeder load-shedding schedule on its website and KE Live app, derived from periodic reviews of roughly 2,000 feeders for electricity theft and bill payment. After its March 2023 review the company kept 71 per cent of the network exempt from scheduled outages, while high-loss feeders faced hours of daily cuts. The regulator has ruled the underlying logic unlawful: in April 2024 NEPRA fined K-Electric Rs50 million (about $180,000) for loss-based load-shedding of up to 16 hours a day in mid-2022, because entire feeders are switched off even when individual customers on them pay their bills — and in June 2025 it issued a fresh show-cause notice over prolonged unannounced outages.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →📊 Impact
K-Electric's own reporting is the only outcome evidence: it says areas that cut theft and raised bill payment, such as Behar Colony and Tannery Road, saw scheduled outages fall by four to six hours.
🎓 Lesson
A published rationing schedule makes scarcity legible, not fair: residents can look up their feeder's hours, but the regulator has ruled the feeder-level logic itself unlawful, and it continues.
Sources
Show your work What this page rests on and what it can’t tell you · all 10 claims with their sources · the forensic record
Evidence Passport · public beta 10 addressable claims, 5 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 10
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-db507971f6764057
descriptive
the privately owned utility that serves Karachi
Sources carrying this claim
clm-59ffe027f6dc1226
descriptive
publishes a weekly feeder-by-feeder load-shedding schedule on its website and KE Live app
Sources carrying this claim
clm-948edef24e740b2b
quantitative
periodic reviews of roughly 2,000 feeders for electricity theft and bill payment
Sources carrying this claim
clm-3fbb9df5b788951a
quantitative
After its March 2023 review the company kept 71 per cent of the network exempt from scheduled outages
Sources carrying this claim
clm-b447647ccc7e92ba
quantitative
in April 2024 NEPRA fined K-Electric Rs50 million
Sources carrying this claim
clm-f0b9fd7ba6c364fb
quantitative
loss-based load-shedding of up to 16 hours a day in mid-2022
Sources carrying this claim
clm-716fcc69538b170b
descriptive
entire feeders are switched off even when individual customers on them pay their bills
Sources carrying this claim
clm-8e6372011abef122
quantitative
in June 2025 it issued a fresh show-cause notice over prolonged unannounced outages
Sources carrying this claim
clm-cf9a7331733bd152
descriptive
areas that cut theft and raised bill payment, such as Behar Colony and Tannery Road, saw scheduled outages fall by four to six hours
Sources carrying this claim
clm-d96a78d6d2c2efb6
descriptive
the regulator has ruled the feeder-level logic itself unlawful, and it continues
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:91614692bb58a205976e37052354d7f43ceb704abffe50e5fc5e9c46c5d0748a
- 10
- of 10 claims mapped
- 5
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- K-Electric (private, vertically integrated utility for Karachi)
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
5 source dossiers
K-Electric — No significant change to load-shed regime
- Stable source ID
src-8ac759ebfc00cb87- Publisher
- Name not classified · ke.com.pk
- Type / language
- web-page · language not classified
- Published
- 2023-07-13
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator statement (July 2023): ~2,000 feeders reviewed, 71% of the network exempt, schedules published on website and KE Live app, Behar Colony and Tannery Road reductions of 4–6 hours.
Business Recorder — Nepra slaps Rs50m penalty on KE
- Stable source ID
src-bca9e87e57ff4cf7- Publisher
- Name not classified · brecorder.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The Rs50 million penalty for AT&C-loss-based load-shedding of up to 16 hours in May–June 2022, and NEPRA's reasoning about compliant customers on shut-down feeders.
Dawn — Fines imposed on five power firms for illegal loadshedding
- Stable source ID
src-81236f885e82bad6- Publisher
- Name not classified · dawn.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The April 2024 NEPRA orders against K-Electric and four state-owned distributors.
- Claims linked
Profit (Pakistan Today) — NEPRA show-cause notice to K-Electric
- Stable source ID
src-fe893a432bffe98b- Publisher
- Name not classified · profit.pakistantoday.com.pk
- Type / language
- web-page · language not classified
- Published
- 2025-06-24
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
June 2025: fresh show-cause proceedings over prolonged and unannounced load-shedding.
- Claims linked
KE Live — Google Play listing
- Stable source ID
src-cf78a402256ec0eb- Publisher
- Name not classified · play.google.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- 2026-08-04
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-15
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The customer app through which feeder-level load-shed schedules and outage status are published.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “K-Electric's Published Feeder-Level Load-Shedding Regime” — Karachi, Pakistan. The Smart City Atlas. https://1001smartcities.org/projects/karachi-ke-loadshedding-regime/ (last verified 2026-08-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
