 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "karachi-ke-loadshedding-regime",
  "title": "K-Electric's Published Feeder-Level Load-Shedding Regime",
  "canonicalUrl": "https://1001smartcities.org/projects/karachi-ke-loadshedding-regime/"
 },
 "currentRevisionId": "2026-08-20-source-dates-r2",
 "revisions": [
  {
   "id": "2026-08-15-baseline",
   "createdAt": "2026-08-15T18:17:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 10 claims and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:8d858159551f069a1c129c53f40b8faa4bcf7b158c4cae27f4b096425cf7a3ed",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:0bfdecc3c55f6e54ae14565c9856b727a5a5e920c07c45c15abcc500df804637",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": null,
      "ended": null
     }
    },
    "governance": {
     "operator": "K-Electric (private, vertically integrated utility for Karachi)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-db507971f6764057",
      "field": "snippet",
      "text": "the privately owned utility that serves Karachi",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "Coverage of the NEPRA orders identifies K-Electric as Karachi's privately owned utility, in contrast to the state-owned distributors fined alongside it.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-59ffe027f6dc1226",
      "field": "snippet",
      "text": "publishes a weekly feeder-by-feeder load-shedding schedule on its website and KE Live app",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87",
       "src-cf78a402256ec0eb"
      ],
      "supportNote": "K-Electric's own statement says schedules are published via its website and the KE Live app.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-948edef24e740b2b",
      "field": "snippet",
      "text": "periodic reviews of roughly 2,000 feeders for electricity theft and bill payment",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "The operator describes a review of its network of 2,000 feeders based on theft and payment rates, last conducted in March 2023 at the time of the statement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3fbb9df5b788951a",
      "field": "snippet",
      "text": "After its March 2023 review the company kept 71 per cent of the network exempt from scheduled outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric stated that 71% of its network remained exempt from load-shedding after the March 2023 assessment.",
      "caveat": "The company's own figure; no independent verification of the exemption share exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b447647ccc7e92ba",
      "field": "snippet",
      "text": "in April 2024 NEPRA fined K-Electric Rs50 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "NEPRA's April 2024 orders imposed a Rs50 million penalty on K-Electric among fines on five distribution companies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f0b9fd7ba6c364fb",
      "field": "snippet",
      "text": "loss-based load-shedding of up to 16 hours a day in mid-2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "The penalty concerned load-shedding of up to 16 hours in May and June 2022 carried out on the basis of AT&C losses.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-716fcc69538b170b",
      "field": "snippet",
      "text": "entire feeders are switched off even when individual customers on them pay their bills",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "NEPRA's stated reasoning: feeder-level shutdowns punish compliant, bill-paying consumers along with defaulters, violating the NEPRA Act and performance standards rules.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8e6372011abef122",
      "field": "snippet",
      "text": "in June 2025 it issued a fresh show-cause notice over prolonged unannounced outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA issued a show-cause notice to K-Electric in June 2025 over prolonged, unannounced load-shedding.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cf9a7331733bd152",
      "field": "impact",
      "text": "areas that cut theft and raised bill payment, such as Behar Colony and Tannery Road, saw scheduled outages fall by four to six hours",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric names Behar Colony and Tannery Road as areas whose load-shed hours fell by 4–6 hours after theft and payment improved.",
      "caveat": "Self-reported by the operator; no independent measurement of these reductions exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d96a78d6d2c2efb6",
      "field": "lesson",
      "text": "the regulator has ruled the feeder-level logic itself unlawful, and it continues",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA held AT&C-based load-shedding to violate the NEPRA Act in its penalty order, and its June 2025 show-cause notice shows the practice persisting.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8ac759ebfc00cb87",
      "title": "K-Electric — No significant change to load-shed regime",
      "url": "https://www.ke.com.pk/no-significant-change-to-load-shed-regime/",
      "publisher": {
       "name": null,
       "domain": "ke.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226",
       "clm-948edef24e740b2b",
       "clm-3fbb9df5b788951a",
       "clm-cf9a7331733bd152"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator statement (July 2023): ~2,000 feeders reviewed, 71% of the network exempt, schedules published on website and KE Live app, Behar Colony and Tannery Road reductions of 4–6 hours.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bca9e87e57ff4cf7",
      "title": "Business Recorder — Nepra slaps Rs50m penalty on KE",
      "url": "https://www.brecorder.com/news/40297355",
      "publisher": {
       "name": null,
       "domain": "brecorder.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba",
       "clm-f0b9fd7ba6c364fb",
       "clm-716fcc69538b170b",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The Rs50 million penalty for AT&C-loss-based load-shedding of up to 16 hours in May–June 2022, and NEPRA's reasoning about compliant customers on shut-down feeders.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-81236f885e82bad6",
      "title": "Dawn — Fines imposed on five power firms for illegal loadshedding",
      "url": "https://www.dawn.com/news/1825827",
      "publisher": {
       "name": null,
       "domain": "dawn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The April 2024 NEPRA orders against K-Electric and four state-owned distributors.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fe893a432bffe98b",
      "title": "Profit (Pakistan Today) — NEPRA show-cause notice to K-Electric",
      "url": "https://profit.pakistantoday.com.pk/2025/06/24/nepra-issues-show-cause-notice-to-k-electric-over-prolonged-unannounced-load-shedding/",
      "publisher": {
       "name": null,
       "domain": "profit.pakistantoday.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8e6372011abef122",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "June 2025: fresh show-cause proceedings over prolonged and unannounced load-shedding.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-cf78a402256ec0eb",
      "title": "KE Live — Google Play listing",
      "url": "https://play.google.com/store/apps/details?id=com.kelectric.customerapp",
      "publisher": {
       "name": null,
       "domain": "play.google.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The customer app through which feeder-level load-shed schedules and outage status are published.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-b4",
   "createdAt": "2026-08-20T19:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:d5ebe1a856f2693455688c99707c91fae166c41f9fa44ba5ff044d5433d5b35d",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:ec4d23c9d91284e27de9f8330e02ff0317569cd47520fe4754c1f56272126baf",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": null,
      "ended": null
     }
    },
    "governance": {
     "operator": "K-Electric (private, vertically integrated utility for Karachi)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-db507971f6764057",
      "field": "snippet",
      "text": "the privately owned utility that serves Karachi",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "Coverage of the NEPRA orders identifies K-Electric as Karachi's privately owned utility, in contrast to the state-owned distributors fined alongside it.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-59ffe027f6dc1226",
      "field": "snippet",
      "text": "publishes a weekly feeder-by-feeder load-shedding schedule on its website and KE Live app",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87",
       "src-cf78a402256ec0eb"
      ],
      "supportNote": "K-Electric's own statement says schedules are published via its website and the KE Live app.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-948edef24e740b2b",
      "field": "snippet",
      "text": "periodic reviews of roughly 2,000 feeders for electricity theft and bill payment",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "The operator describes a review of its network of 2,000 feeders based on theft and payment rates, last conducted in March 2023 at the time of the statement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3fbb9df5b788951a",
      "field": "snippet",
      "text": "After its March 2023 review the company kept 71 per cent of the network exempt from scheduled outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric stated that 71% of its network remained exempt from load-shedding after the March 2023 assessment.",
      "caveat": "The company's own figure; no independent verification of the exemption share exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b447647ccc7e92ba",
      "field": "snippet",
      "text": "in April 2024 NEPRA fined K-Electric Rs50 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "NEPRA's April 2024 orders imposed a Rs50 million penalty on K-Electric among fines on five distribution companies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f0b9fd7ba6c364fb",
      "field": "snippet",
      "text": "loss-based load-shedding of up to 16 hours a day in mid-2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "The penalty concerned load-shedding of up to 16 hours in May and June 2022 carried out on the basis of AT&C losses.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-716fcc69538b170b",
      "field": "snippet",
      "text": "entire feeders are switched off even when individual customers on them pay their bills",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "NEPRA's stated reasoning: feeder-level shutdowns punish compliant, bill-paying consumers along with defaulters, violating the NEPRA Act and performance standards rules.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8e6372011abef122",
      "field": "snippet",
      "text": "in June 2025 it issued a fresh show-cause notice over prolonged unannounced outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA issued a show-cause notice to K-Electric in June 2025 over prolonged, unannounced load-shedding.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cf9a7331733bd152",
      "field": "impact",
      "text": "areas that cut theft and raised bill payment, such as Behar Colony and Tannery Road, saw scheduled outages fall by four to six hours",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric names Behar Colony and Tannery Road as areas whose load-shed hours fell by 4–6 hours after theft and payment improved.",
      "caveat": "Self-reported by the operator; no independent measurement of these reductions exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d96a78d6d2c2efb6",
      "field": "lesson",
      "text": "the regulator has ruled the feeder-level logic itself unlawful, and it continues",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA held AT&C-based load-shedding to violate the NEPRA Act in its penalty order, and its June 2025 show-cause notice shows the practice persisting.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8ac759ebfc00cb87",
      "title": "K-Electric — No significant change to load-shed regime",
      "url": "https://www.ke.com.pk/no-significant-change-to-load-shed-regime/",
      "publisher": {
       "name": null,
       "domain": "ke.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226",
       "clm-948edef24e740b2b",
       "clm-3fbb9df5b788951a",
       "clm-cf9a7331733bd152"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator statement (July 2023): ~2,000 feeders reviewed, 71% of the network exempt, schedules published on website and KE Live app, Behar Colony and Tannery Road reductions of 4–6 hours.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bca9e87e57ff4cf7",
      "title": "Business Recorder — Nepra slaps Rs50m penalty on KE",
      "url": "https://www.brecorder.com/news/40297355",
      "publisher": {
       "name": null,
       "domain": "brecorder.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba",
       "clm-f0b9fd7ba6c364fb",
       "clm-716fcc69538b170b",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The Rs50 million penalty for AT&C-loss-based load-shedding of up to 16 hours in May–June 2022, and NEPRA's reasoning about compliant customers on shut-down feeders.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-81236f885e82bad6",
      "title": "Dawn — Fines imposed on five power firms for illegal loadshedding",
      "url": "https://www.dawn.com/news/1825827",
      "publisher": {
       "name": null,
       "domain": "dawn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The April 2024 NEPRA orders against K-Electric and four state-owned distributors.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fe893a432bffe98b",
      "title": "Profit (Pakistan Today) — NEPRA show-cause notice to K-Electric",
      "url": "https://profit.pakistantoday.com.pk/2025/06/24/nepra-issues-show-cause-notice-to-k-electric-over-prolonged-unannounced-load-shedding/",
      "publisher": {
       "name": null,
       "domain": "profit.pakistantoday.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8e6372011abef122",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": "2025-06-24",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "June 2025: fresh show-cause proceedings over prolonged and unannounced load-shedding.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-cf78a402256ec0eb",
      "title": "KE Live — Google Play listing",
      "url": "https://play.google.com/store/apps/details?id=com.kelectric.customerapp",
      "publisher": {
       "name": null,
       "domain": "play.google.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The customer app through which feeder-level load-shed schedules and outage status are published.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 1,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-r2",
   "createdAt": "2026-08-21T09:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:91614692bb58a205976e37052354d7f43ceb704abffe50e5fc5e9c46c5d0748a",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:b8e759c5f78ca7d495c7a0c35329b15e7f3ce6bfd00e3ecc45c24964b98dbe94",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": null,
      "ended": null
     }
    },
    "governance": {
     "operator": "K-Electric (private, vertically integrated utility for Karachi)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-db507971f6764057",
      "field": "snippet",
      "text": "the privately owned utility that serves Karachi",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "Coverage of the NEPRA orders identifies K-Electric as Karachi's privately owned utility, in contrast to the state-owned distributors fined alongside it.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-59ffe027f6dc1226",
      "field": "snippet",
      "text": "publishes a weekly feeder-by-feeder load-shedding schedule on its website and KE Live app",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87",
       "src-cf78a402256ec0eb"
      ],
      "supportNote": "K-Electric's own statement says schedules are published via its website and the KE Live app.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-948edef24e740b2b",
      "field": "snippet",
      "text": "periodic reviews of roughly 2,000 feeders for electricity theft and bill payment",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "The operator describes a review of its network of 2,000 feeders based on theft and payment rates, last conducted in March 2023 at the time of the statement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3fbb9df5b788951a",
      "field": "snippet",
      "text": "After its March 2023 review the company kept 71 per cent of the network exempt from scheduled outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric stated that 71% of its network remained exempt from load-shedding after the March 2023 assessment.",
      "caveat": "The company's own figure; no independent verification of the exemption share exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b447647ccc7e92ba",
      "field": "snippet",
      "text": "in April 2024 NEPRA fined K-Electric Rs50 million",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-81236f885e82bad6"
      ],
      "supportNote": "NEPRA's April 2024 orders imposed a Rs50 million penalty on K-Electric among fines on five distribution companies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f0b9fd7ba6c364fb",
      "field": "snippet",
      "text": "loss-based load-shedding of up to 16 hours a day in mid-2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "The penalty concerned load-shedding of up to 16 hours in May and June 2022 carried out on the basis of AT&C losses.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-716fcc69538b170b",
      "field": "snippet",
      "text": "entire feeders are switched off even when individual customers on them pay their bills",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7"
      ],
      "supportNote": "NEPRA's stated reasoning: feeder-level shutdowns punish compliant, bill-paying consumers along with defaulters, violating the NEPRA Act and performance standards rules.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-8e6372011abef122",
      "field": "snippet",
      "text": "in June 2025 it issued a fresh show-cause notice over prolonged unannounced outages",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA issued a show-cause notice to K-Electric in June 2025 over prolonged, unannounced load-shedding.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cf9a7331733bd152",
      "field": "impact",
      "text": "areas that cut theft and raised bill payment, such as Behar Colony and Tannery Road, saw scheduled outages fall by four to six hours",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8ac759ebfc00cb87"
      ],
      "supportNote": "K-Electric names Behar Colony and Tannery Road as areas whose load-shed hours fell by 4–6 hours after theft and payment improved.",
      "caveat": "Self-reported by the operator; no independent measurement of these reductions exists.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d96a78d6d2c2efb6",
      "field": "lesson",
      "text": "the regulator has ruled the feeder-level logic itself unlawful, and it continues",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bca9e87e57ff4cf7",
       "src-fe893a432bffe98b"
      ],
      "supportNote": "NEPRA held AT&C-based load-shedding to violate the NEPRA Act in its penalty order, and its June 2025 show-cause notice shows the practice persisting.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8ac759ebfc00cb87",
      "title": "K-Electric — No significant change to load-shed regime",
      "url": "https://www.ke.com.pk/no-significant-change-to-load-shed-regime/",
      "publisher": {
       "name": null,
       "domain": "ke.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226",
       "clm-948edef24e740b2b",
       "clm-3fbb9df5b788951a",
       "clm-cf9a7331733bd152"
      ],
      "temporal": {
       "publishedAt": "2023-07-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator statement (July 2023): ~2,000 feeders reviewed, 71% of the network exempt, schedules published on website and KE Live app, Behar Colony and Tannery Road reductions of 4–6 hours.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bca9e87e57ff4cf7",
      "title": "Business Recorder — Nepra slaps Rs50m penalty on KE",
      "url": "https://www.brecorder.com/news/40297355",
      "publisher": {
       "name": null,
       "domain": "brecorder.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba",
       "clm-f0b9fd7ba6c364fb",
       "clm-716fcc69538b170b",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The Rs50 million penalty for AT&C-loss-based load-shedding of up to 16 hours in May–June 2022, and NEPRA's reasoning about compliant customers on shut-down feeders.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-81236f885e82bad6",
      "title": "Dawn — Fines imposed on five power firms for illegal loadshedding",
      "url": "https://www.dawn.com/news/1825827",
      "publisher": {
       "name": null,
       "domain": "dawn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db507971f6764057",
       "clm-b447647ccc7e92ba"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The April 2024 NEPRA orders against K-Electric and four state-owned distributors.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fe893a432bffe98b",
      "title": "Profit (Pakistan Today) — NEPRA show-cause notice to K-Electric",
      "url": "https://profit.pakistantoday.com.pk/2025/06/24/nepra-issues-show-cause-notice-to-k-electric-over-prolonged-unannounced-load-shedding/",
      "publisher": {
       "name": null,
       "domain": "profit.pakistantoday.com.pk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8e6372011abef122",
       "clm-d96a78d6d2c2efb6"
      ],
      "temporal": {
       "publishedAt": "2025-06-24",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "June 2025: fresh show-cause proceedings over prolonged and unannounced load-shedding.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-cf78a402256ec0eb",
      "title": "KE Live — Google Play listing",
      "url": "https://play.google.com/store/apps/details?id=com.kelectric.customerapp",
      "publisher": {
       "name": null,
       "domain": "play.google.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-59ffe027f6dc1226"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": "2026-08-04",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The customer app through which feeder-level load-shed schedules and outage status are published.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}