Göteborg has measured its air since 1976, and for years the E6 at Gårda broke the legal limits. The law required a plan, not an action, and the low-emission zone for cars stayed a study.

Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
FundingGöteborgs Stad runs the Femman, Haga and Övre Husargatan stations itself; the Gårda station belongs to Luftvårdsförbundet i Göteborgsregionen, which is financed by membership fees from the region's municipalities and member companies. No total cost is published.

Part of 1001 Smart Cities — 1,277 documented projects · 🏙️ 11 more in Gothenburg · 🌫️ Air quality guide · 🌱 Environment projects

Göteborgs Stad's environment administration has measured the city's air continuously since 1976, when the rooftop station on the Femman building in Nordstan started. Today the city runs three fixed stations (Femman, Haga and Övre Husargatan) plus two mobile vans, and the regional air-quality association measures at street level beside the E6 motorway at Gårda, where about 99,000 vehicles a day pass. Readings are published every hour on the city's website together with a health index, and since November 2019 near-real-time data from all stations can be fetched through an open-data API. The measurements are the city's statutory check against Sweden's air-quality standards; in 2025 the annual nitrogen-dioxide standard was met at every station.

Live 📅 since 1976

Sources

↗ Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)The environment administration's annual report for 2025. It describes the three city stations and two mobile vans, the regional association's station beside the motorway at Gårda, hourly publication with a health index, and an open-data API for near-real-time data since November 2019. It reports the nitrogen-dioxide and PM10 standards met in 2025, Gårda's annual NO2 mean (19.2 µg/m3) just under the 20 µg/m3 national objective, six hours above 90 µg/m3 at Gårda, a stalled NO2 decline, and the factors the city credits for the long decline.
↗ Göteborgs Stad — Objektiv skattning i Göteborg, assessment for the 2024 reporting yearThe city's formal assessment for the 2024 reporting year, filed with the national air-quality data host. Its station table dates Femman from 1976, Haga from 2002, Gårda from 1997 and Övre Husargatan from 2021, and gives about 99,000 vehicles a day on the E6 at Gårda in 2024, with annual NO2 and PM10 values for each station from 2019 to 2024.
↗ Luftvårdsförbundet i Göteborgsregionen — Ren regionluft: program för samordnad kontroll (7 Apr 2022)The regional association's monitoring programme, adopted at its annual meeting on 7 April 2022. It describes the association (municipalities, the national roads agency, the County Administrative Board and member companies, financed by membership fees), its station at Gårda, the rule that a standard counts as exceeded when breached in at least three of five years, and the breaches of the daily and hourly NO2 standards at Gårda and Haga in 2017–2019.
↗ Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)The County Administrative Board's revised nitrogen-dioxide action programme for the Göteborg region (report 2017:28). It records that the standard should have been met in 2006, that the first programme was adopted in 2006 and did not have enough effect, that a number of measures concern changes to national law because the municipalities do not control the state roads, that Göteborg and Mölndal are to study a low-emission zone for light vehicles, and that the Gårda site is one of the most polluted in the region.
↗ Naturvårdsverket — Kvävedioxid i gaturum (årsmedelvärden)The national environment agency's standing statistics page on nitrogen dioxide at street level. It says the annual standard has been met in all reporting municipalities since 2017, including at Gårda in Göteborg, where levels had previously exceeded it in almost every year.
Show 1 more sourcesShow fewer
↗ Göteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024)The city council paper on Göteborg's particle (PM10) action plan for 2025–2030. It records 34 exceedance days against 35 allowed at Gårda in 2022, the city's notice to Naturvårdsverket in November 2022, the agency's judgement of 6 March 2023 that an action programme was needed, the plan's nine measures (extra sand removal, dust binding, a studded-tyre campaign, among others), and that a low-emission zone for light vehicles was left out because broad political agreement did not exist.

📅 How old is the evidence?

Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 1976. 4 of 6 sources carry a publication date, from 19 June 2018 to 18 May 2026.

When the sources were published

  1. Länsstyrelsen Västra Götaland · regional governmentLänsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
  2. Luftvårdsförbundet i Göteborgsregionen · regional governmentLuftvårdsförbundet i Göteborgsregionen — Ren regionluft: program för samordnad kontroll (7 Apr 2022)
  3. City of Gothenburg (Göteborgs Stad) · city governmentGöteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024)
  4. City of Gothenburg (Göteborgs Stad) · city governmentGöteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)

Every source, with links ↑

What happened to this record

  1. Entered the record
  2. Sources last read

Every revision, permanent →

Show your work What this page rests on and what it can’t tell you · all 25 claims with their sources · the forensic record

Evidence file · public beta 25 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 25

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-879c339c7d7d8c88 quantitative
has measured the city's air continuously since 1976, when the rooftop station on the Femman building in Nordstan started
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The annual report says one of the fixed stations started in 1976 and that the administration measures background levels on the roof of the Femman building in Nordstan; the 2024 assessment's station table dates Femman from 1976.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
  2. Göteborgs Stad — Objektiv skattning i Göteborg, assessment for the 2024 reporting year
Claim 2 clm-4c5d745006177ab3 descriptive
Today the city runs three fixed stations (Femman, Haga and Övre Husargatan) plus two mobile vans
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report lists the three fixed stations run by the environment administration and two mobile measuring vans used for shorter campaigns.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 3 clm-e8b3586a45d1af4c quantitative
the regional air-quality association measures at street level beside the E6 motorway at Gårda
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says Luftvårdsförbundet i Göteborgsregionen measures at street level beside the motorway at Gårda; the 2024 assessment names the road as the E6.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
  2. Göteborgs Stad — Objektiv skattning i Göteborg, assessment for the 2024 reporting year
Claim 4 clm-f5e3f4f19ca63280 quantitative
where about 99,000 vehicles a day pass
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The assessment's traffic counts give the E6 at Gårda 99,000 vehicles a day in 2024.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Objektiv skattning i Göteborg, assessment for the 2024 reporting year
Claim 5 clm-c35a0fe5f9e37524 descriptive
Readings are published every hour on the city's website together with a health index
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says the city's air-quality pages report measured pollutant levels and weather every hour, together with an index of air quality in relation to health risk.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 6 clm-9404457833dccd21 quantitative
since November 2019 near-real-time data from all stations can be fetched through an open-data API
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says near-real-time data from all stations can be fetched through an API from November 2019, alongside monthly summaries published as open data.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 7 clm-ae49959984458152 descriptive
The measurements are the city's statutory check against Sweden's air-quality standards
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says Göteborgs Stad is responsible under the law for checking air quality in the municipality against the environmental quality standards.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 8 clm-7009b57517801a60 quantitative
in 2025 the annual nitrogen-dioxide standard was met at every station
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says all annual NO2 means were well below 40 µg/m3 and the annual standard was met at every station.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 9 clm-d7d9e3fb00185b72 quantitative
Gårda, beside the E6, is one of the most polluted places in Göteborg and the region
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The action programme describes the Gårda site, right next to the E6, as one of the most polluted places in Göteborg and the region.
Caveat
The programme dates from 2018; levels at Gårda have fallen since.

Sources carrying this claim

  1. Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
Claim 10 clm-33e17a5bfa96c691 quantitative
the annual nitrogen-dioxide standard had been exceeded there in almost every year and has been met since 2017
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Naturvårdsverket says the annual standard has been met in all reporting municipalities since 2017, including at Gårda, where levels had previously exceeded it in almost every year.
Caveat
The County Administrative Board's 2018 programme records that the annual standard was also met at Gårda in 2015; 'almost every year' is the agency's own summary.

Sources carrying this claim

  1. Naturvårdsverket — Kvävedioxid i gaturum (årsmedelvärden)
Claim 11 clm-fe89c4837650bf1c quantitative
the stricter Swedish daily and hourly standards were still breached at Gårda and Haga in 2017–2019
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The monitoring programme says measurements confirm violations of both the daily and the hourly NO2 standard at street level at Gårda and Haga in 2017–2019.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Luftvårdsförbundet i Göteborgsregionen — Ren regionluft: program för samordnad kontroll (7 Apr 2022)
Claim 12 clm-3f9cce3417056b6c quantitative
In 2025 the city reported Gårda's annual mean just under the national environmental objective of 20 µg/m3
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says Gårda's annual NO2 mean lay just under the 20 µg/m3 of the national objective; its table gives 19.2 µg/m3.
Caveat
Data capture at Gårda was 85.9% in 2025.

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 13 clm-6675e9e4fd17870a quantitative
six hours above 90 µg/m3 against 175 allowed
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says the Swedish hourly standard allows 90 µg/m3 to be exceeded at most 175 times a year and that Gårda recorded six exceedances.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 14 clm-6dbbfaf4d186168e quantitative
The city also noted that the decline in nitrogen dioxide stalled in 2025
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report's summary says the recent years' decreases in NO2 in Göteborg stopped during the past year.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 15 clm-9ea327abef9bdf45 quantitative
Gårda recorded 34 exceedance days of the daily PM10 limit in 2022 against 35 allowed
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The council paper says the daily PM10 standard was exceeded on 34 of the 35 permitted days at Gårda in 2022.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024)
Claim 16 clm-4822491b8b8e6de7 quantitative
in March 2023 Naturvårdsverket judged that an action programme was needed
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The council paper says that in an opinion of 6 March 2023 Naturvårdsverket judged that an action programme had to be drawn up for the PM10 standard to be met in Göteborg.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024)
Claim 17 clm-3c015a2e42e08403 quantitative
in 2025 PM10 at Gårda met the standard with a good margin
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says PM10 levels at Gårda were below the standard in 2025 with a good margin in the number of allowed days.
Caveat
The national environmental objective for PM10 was still exceeded at Gårda in 2025.

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 18 clm-cda2b705fec6cf45 descriptive
The regional association classes a standard as exceeded when it was breached in at least three of the previous five years
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The monitoring programme says exceedance is judged over the last five years and counts as having occurred if it happened in at least three separate years of those five.
Caveat
This rule sets the region's monitoring requirements; compliance in a single year is reported separately in the city's annual reports.

Sources carrying this claim

  1. Luftvårdsförbundet i Göteborgsregionen — Ren regionluft: program för samordnad kontroll (7 Apr 2022)
Claim 19 clm-0aa80088bc240507 descriptive
a breach obliges an action programme
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report says that if a standard is not met, an action programme must as a rule be drawn up by the county administrative boards concerned.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 20 clm-ed2841fc23ec033e quantitative
The first nitrogen-dioxide programme was adopted in 2006, the year the standard should already have been met
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The programme says the NO2 standard should have been met in 2006 and that the region's first action programme was adopted in 2006.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
Claim 21 clm-82bd0dfecac74de1 quantitative
its 2018 revision by the County Administrative Board said it had not had enough effect
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The revised programme states that the action programme had unfortunately not had a large enough effect.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
Claim 22 clm-6c22acd0f17bec80 descriptive
aimed a number of measures at national laws because the municipalities do not control the state roads
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The programme says that because the municipalities do not decide over the state roads, it contains a number of measures concerning changes to laws.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
Claim 23 clm-37218f9358379c6c descriptive
asked the city to study a low-emission zone for light vehicles
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The programme assigns Göteborg (and Mölndal) the measure of studying how low-emission zones for light vehicles could be designed and introduced.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018)
Claim 24 clm-1fab22ecee817c47 descriptive
The city credits the decline that followed to a cleaner vehicle fleet, better road maintenance, electrification and its existing zone for heavy vehicles
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The report names a cleaner vehicle fleet, better road maintenance, electrification and the low-emission zone for heavy vehicles as factors behind falling nitrogen-oxide levels over many years.
Caveat
The report names contributing factors; it does not quantify how much each contributed.

Sources carrying this claim

  1. Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026)
Claim 25 clm-abd9dde9319a39f9 quantitative
When its 2024 particle plan was drawn up, a zone for light vehicles was left out because the broad political agreement it needed did not exist
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The environment administration's paper says the measures 'introduce a low-emission zone for light vehicles' and 'optimise the congestion tax' must be decided at the highest political level with broad agreement, which does not exist today, and were not included.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Göteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024)
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-11-baseline effective 2026-11-11 · created 2026-11-11

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:5bce764e2cbe1172bd2d902f2a9408548f7e8673e91c5c445bcbd34473d52eb4
25
of 25 claims mapped
6
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Göteborgs Stad, Miljöförvaltningen (Femman, Haga, Övre Husargatan and two mobile vans); Luftvårdsförbundet i Göteborgsregionen (Gårda, with station operation contracted out)
Actor types
city-government, regional-government
Funding model
public
Funding description
Göteborgs Stad runs the Femman, Haga and Övre Husargatan stations itself; the Gårda station belongs to Luftvårdsförbundet i Göteborgsregionen, which is financed by membership fees from the region's municipalities and member companies. No total cost is published.
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Göteborgs Stad — Luften i Göteborg, årsrapport 2025 (18 May 2026) goteborg.se · 13 linked claims

Open original source ↗

Stable source ID
src-788ea20f515ccbe8
Publisher
Name not classified · goteborg.se
Type / language
pdf · language not classified
Published
2026-05-18
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The environment administration's annual report for 2025. It describes the three city stations and two mobile vans, the regional association's station beside the motorway at Gårda, hourly publication with a health index, and an open-data API for near-real-time data since November 2019. It reports the nitrogen-dioxide and PM10 standards met in 2025, Gårda's annual NO2 mean (19.2 µg/m3) just under the 20 µg/m3 national objective, six hours above 90 µg/m3 at Gårda, a stalled NO2 decline, and the factors the city credits for the long decline.

Descriptive only — not page/paragraph exact
Göteborgs Stad — Objektiv skattning i Göteborg, assessment for the 2024 reporting year datavardluft.smhi.se · 3 linked claims

Open original source ↗

Stable source ID
src-3ae312bef48d53e8
Publisher
Name not classified · datavardluft.smhi.se
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's formal assessment for the 2024 reporting year, filed with the national air-quality data host. Its station table dates Femman from 1976, Haga from 2002, Gårda from 1997 and Övre Husargatan from 2021, and gives about 99,000 vehicles a day on the E6 at Gårda in 2024, with annual NO2 and PM10 values for each station from 2019 to 2024.

Descriptive only — not page/paragraph exact
Luftvårdsförbundet i Göteborgsregionen — Ren regionluft: program för samordnad kontroll (7 Apr 2022) datavardluft.smhi.se · 2 linked claims

Open original source ↗

Stable source ID
src-1ad30b03e1cfaf25
Publisher
Name not classified · datavardluft.smhi.se
Type / language
pdf · language not classified
Published
2022-04-07
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The regional association's monitoring programme, adopted at its annual meeting on 7 April 2022. It describes the association (municipalities, the national roads agency, the County Administrative Board and member companies, financed by membership fees), its station at Gårda, the rule that a standard counts as exceeded when breached in at least three of five years, and the breaches of the daily and hourly NO2 standards at Gårda and Haga in 2017–2019.

Descriptive only — not page/paragraph exact
Länsstyrelsen i Västra Götalands län — Åtgärdsprogram för kvävedioxid i Göteborgsregionen, reviderat program (19 Jun 2018) catalog.lansstyrelsen.se · 5 linked claims

Open original source ↗

Stable source ID
src-c0929cd5b797fe15
Publisher
Name not classified · catalog.lansstyrelsen.se
Type / language
web-page · language not classified
Published
2018-06-19
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The County Administrative Board's revised nitrogen-dioxide action programme for the Göteborg region (report 2017:28). It records that the standard should have been met in 2006, that the first programme was adopted in 2006 and did not have enough effect, that a number of measures concern changes to national law because the municipalities do not control the state roads, that Göteborg and Mölndal are to study a low-emission zone for light vehicles, and that the Gårda site is one of the most polluted in the region.

Descriptive only — not page/paragraph exact
Naturvårdsverket — Kvävedioxid i gaturum (årsmedelvärden) naturvardsverket.se · 1 linked claim

Open original source ↗

Stable source ID
src-209698674489083a
Publisher
Name not classified · naturvardsverket.se
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The national environment agency's standing statistics page on nitrogen dioxide at street level. It says the annual standard has been met in all reporting municipalities since 2017, including at Gårda in Göteborg, where levels had previously exceeded it in almost every year.

Descriptive only — not page/paragraph exact
Göteborgs Stad — Göteborgs Stads åtgärdsplan för partiklar (PM10), Handling 2024 nr 220 (6 Nov 2024) www4.goteborg.se · 3 linked claims

Open original source ↗

Stable source ID
src-4dbc50dc254138e2
Publisher
Name not classified · www4.goteborg.se
Type / language
pdf · language not classified
Published
2024-11-06
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city council paper on Göteborg's particle (PM10) action plan for 2025–2030. It records 34 exceedance days against 35 allowed at Gårda in 2022, the city's notice to Naturvårdsverket in November 2022, the agency's judgement of 6 March 2023 that an action programme was needed, the plan's nine measures (extra sand removal, dust binding, a studded-tyre campaign, among others), and that a low-emission zone for light vehicles was left out because broad political agreement did not exist.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
📎 Cite this project

1001 Smart Cities (2026). “Göteborg's Air Quality Monitoring Network and the Plans It Obliges” — Gothenburg, Sweden. The Smart City Atlas. https://1001smartcities.org/projects/gothenburg-air-quality-monitoring/ (last verified 2026-11-11). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ One source-checked project a week. No pitches, no vendors.

Inside: the Landmark of the Week, one Insight, the newly documented cities. One-click unsubscribe. About the newsletter · RSS