Lake Garda Solar-Backed EV Charging Network
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
Garda Uno, the multi-utility owned by the Lake Garda municipalities, has run a public EV charging network around the lake since February 2015, powered by its photovoltaic plants on local schools and municipal buildings. Lonato del Garda joined in November 2016 as the eleventh site with a 7 kW dual-socket station; the network now spans about twenty stations from Limone to Sirmione, on Hubject e-roaming since June 2026.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Lake Garda Solar-Backed EV Charging Network” — Lonato del Garda, Italy. The Smart City Atlas. https://1001smartcities.org/projects/garda-uno-ev-charging/ (last verified 2026-07-18). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
