RIT Fleet Telemetry Upgrade

🤖 AI-generated summary of the sources below · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means · What “source-checked” means

From around 2012, Curitiba's URBS equipped some 2,500 RIT buses — a network already using contactless smart cards since 2002 — with 3G-based M2M telemetry from Ericsson, Vivo and Dataprom, tracking routes, speeds and stop times live from a central control room across roughly 2.26 million rides each working day.

Live 📅 since 2012
Evidence📊 Independentgrades the sourcing — this entry states no impact figure
what does this mean?The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
Curitiba's tube-station BRT stops
Curitiba's tube-station BRT stops — Mario Roberto Durán Ortiz, CC BY-SA 3.0, via Wikimedia Commons

Sources

↗ URBS Curitiba (operator)Official page on URBS's Operations Control Center (CCO) fleet monitoring.
↗ UNFCCC Momentum for Change (authority)Lighthouse activity describing the Ericsson/Vivo/Dataprom 3G M2M telemetry on ~2,500 buses.
↗ EBRD Green Cities (research)Covers 2002 e-ticketing and the wider RIT modernization.
📎 Cite this project

1001 Smart Cities (2026). “RIT Fleet Telemetry Upgrade” — Curitiba, Brazil. The Smart City Atlas. https://1001smartcities.org/projects/curitiba-brt-telemetry/ (last verified 2026-07-16). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS