Cairo Metro Contactless Fare Card
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
7 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 22 Aug 2026 Publication date recorded for 14 sources. What changed →
A distance-based fare card since 2013 — and thirteen years on it still opens nothing but the metro's own gates. No bank card or phone works, and paper tickets are still sold at the windows.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 5 more in Cairo · 🎫 Smart ticketing guide · 🚲 Mobility projects
The Cairo Metro's contactless fare system has run on Lines 1 and 2 since 2013, supplied by Indra, with Thales equipping Line 3 and the two integrated so that one rechargeable wallet card works across all three. Passengers tap in and tap out, and the gate deducts a distance band — EGP 10, 12, 15 or 20 as of March 2026 — under the banded structure that replaced the flat fare in May 2018, a change met with protests and arrests. The card never replaced paper: single-journey tickets are still sold at windows. Thirteen years on it remains an ordinary stored-value card. No bank card, QR code or phone opens a gate; Visa terminals reached ticket booths on Lines 1 and 2 only in December 2025, and Line 3's operator still takes cash at its offices. The network belongs to the National Authority for Tunnels under the Ministry of Transport, which sets fares nationally; the state Egyptian Company for Metro Management and Operation runs Lines 1 and 2, and RATP Dev Mobility Cairo has run Line 3 since 2021 under a 15-year contract awarded in 2020. A single card spanning metro, monorail, light rail and buses was announced in November 2023 and again in November 2025 without arriving; the new monorail was equipped separately in 2026 with a different, account-based system.
🎓 Lesson
A fare card is not a network card. Cairo's has charged by distance since 2013, and thirteen years on it still stops at the metro's own gates. Nothing measurable comes back out of it either: neither operator publishes ridership or a schedule feed, circulating daily-ridership claims run from 3 million to 5 million with no reconciliation, and the only machine-readable Cairo Metro GTFS is a third-party estimate released by Transport for Cairo in 2016 under a non-commercial licence.
Sources
Show 9 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2013. 7 of 14 sources carry a publication date, from 11 May 2018 to 10 June 2026.
When the sources were published
- Egyptian Streets · pressEgyptian Streets (press, 11 May 2018)
- Al-Monitor · pressAl-Monitor (press, May 2018)
- IDOM · vendorIDOM (supervising engineer)
- Indra · vendorIndra (supplier, Oct 2019)
- Egyptian Streets · pressEgyptian Streets (press, 8 Nov 2023)
- Daily News Egypt · pressDaily News Egypt (press, 26 Mar 2026) · updated 27 March 2026
- Indra · vendorIndra (supplier, 10 June 2026) — Cairo monorail ABT
What happened to this record
- Sources last read
- Entered the record
- Publication date recorded for 14 sources
Show your work What this page rests on and what it can’t tell you · all 7 claims with their sources · the forensic record
Evidence Passport · public beta 7 addressable claims, 14 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 7
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-26011ba410c9c51d
quantitative
The Cairo Metro's contactless fare system has run on Lines 1 and 2 since 2013, supplied by Indra
Sources carrying this claim
clm-a1887d50d15e5ebc
quantitative
with Thales equipping Line 3 and the two integrated so that one rechargeable wallet card works across all three
Sources carrying this claim
clm-eaa1aec1d248ee4f
quantitative
the gate deducts a distance band — EGP 10, 12, 15 or 20 as of March 2026
Sources carrying this claim
clm-63b4eea548a2dd30
quantitative
under the banded structure that replaced the flat fare in May 2018, a change met with protests and arrests
Sources carrying this claim
clm-935cb70f2c3bd103
quantitative
A single card spanning metro, monorail, light rail and buses was announced in November 2023 and again in November 2025 without arriving
Sources carrying this claim
clm-bf15eff4922185b8
quantitative
the new monorail was equipped separately in 2026 with a different, account-based system
Sources carrying this claim
clm-581e1d6a8cf74047
quantitative
the only machine-readable Cairo Metro GTFS is a third-party estimate released by Transport for Cairo in 2016 under a non-commercial licence
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:58258fe06a62d2dbf349d1994f5345ddebe5bc626c1231b24a03b6cf471e2f6f
- 7
- of 7 claims mapped
- 14
- source dossiers
- 8
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Egyptian Company for Metro Management and Operation (Lines 1-2) and RATP Dev Mobility Cairo (Line 3), under the National Authority for Tunnels, Ministry of Transport
- Actor types
- utility, private
- Funding model
- public
- Funding description
- Egyptian state procurement through the Egyptian Company for Metro Management and Operation and the National Authority for Tunnels
- Cost
- ≈€7M (2019 five-year ticketing maintenance contract; original build cost not disclosed)
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
14 source dossiers
Indra (supplier, Oct 2019)
- Stable source ID
src-ee3a4eb6458a8418- Publisher
- Name not classified · indragroup.com
- Type / language
- web-page · language not classified
- Published
- 2019-10-21
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. The load-bearing date: states Indra's Lines 1 and 2 access-control and ticket-sale systems 'came into operation in 2013', describes an 'advanced contactless ticketing solution', and records a five-year maintenance renewal 'for an amount exceeding 7 million Euros'. Supplier self-report — the only primary source located for the 2013 date.
- Claims linked
IDOM (supervising engineer)
- Stable source ID
src-1f6d3cb9db3e9b8e- Publisher
- Name not classified · idom.com
- Type / language
- web-page · language not classified
- Published
- 2019-05-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Independent of the suppliers. Confirms the split — Indra for Lines 1 and 2, Thales for Line 3 — and that IDOM verified 'integration protocols between the existing and new line systems'. Equipment scope: 55 ticket office machines, 250 new automatic gates, 350 upgraded gates, one central control unit. No dates given.
- Claims linked
Mobility Cairo / RATP Dev (operator, Line 3) — FAQ
- Stable source ID
src-2f005e9929cd59b2- Publisher
- Name not classified · mobilitycairo.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Operator primary. Confirms reloadable Wallet cards and season passes sold at Line 3 ticket offices and vending machines, and states plainly 'To purchase tickets and Wallet cards only cash money payement is available' — the basis for the finding that Line 3 takes cash only. Also confirms no online ticket sales ('Not yet').
- Claims linked
- Background source; no baseline claim points here
Mobility Cairo / RATP Dev — company page
- Stable source ID
src-960cf2feddf306cf- Publisher
- Name not classified · mobilitycairo.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Confirms RATP Dev Mobility Cairo is a 100% RATP Dev subsidiary and has operated Green Line 3 since 2021. Does not give contract date, duration, value or awarding authority.
- Claims linked
- Background source; no baseline claim points here
RATP newsroom — Line 3 O&M contract (2020)
- Stable source ID
src-448b1ea95510c957- Publisher
- Name not classified · ratp.fr
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
FETCH FAILED (403), as did International Railway Journal and Railway Gazette on the same contract. Search-level only: three trade outlets concur that the National Authority for Tunnels awarded RATP Dev a 15-year operation and maintenance contract signed September 2020, reported at €1.1bn. The entry states the 15-year term and 2020 award, which mobilitycairo.com corroborates as to operation from 2021; the €1.1bn value is deliberately left out of the snippet as unfetched.
- Claims linked
- Background source; no baseline claim points here
Egyptian Streets (press, 11 May 2018)
- Stable source ID
src-18ff82ff83903f30- Publisher
- Name not classified · egyptianstreets.com
- Type / language
- web-page · language not classified
- Published
- 2018-05-11
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Ministry of Transport introduced distance banding at EGP 3 / 5 / 7 by number of stops, replacing a flat fare, effective 12 May 2018. Confirms the mechanism the card depends on. References a companion piece on arrests but carries no detail.
- Claims linked
Al-Monitor (press, May 2018)
- Stable source ID
src-f75350de5fa6f6b9- Publisher
- Name not classified · al-monitor.com
- Type / language
- web-page · language not classified
- Published
- 2018-05-22
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
NOT FETCHED — search-level only. Supports the unquantified statement that the 2018 rise drew protests and arrests; Middle East Eye carries a parallel report. No arrest count is asserted in the entry because none could be confirmed at source.
- Claims linked
Daily News Egypt (press, 26 Mar 2026)
- Stable source ID
src-fb4b1e4d7afe95f5- Publisher
- Name not classified · dailynewsegypt.com
- Type / language
- web-page · language not classified
- Published
- 2026-03-26
- Updated
- 2026-03-27
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Current bands after the March 2026 adjustment: EGP 10 up to 9 stations, EGP 12 up to 16, EGP 15 up to 23, EGP 20 for 23-39. Source for the four-tier structure in the snippet.
- Claims linked
Egypt State Information Service (Dec 2025)
- Stable source ID
src-77d4271b02d46211- Publisher
- Name not classified · sis.gov.eg
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
FETCH FAILED (503); Ahram Online's version of the same story also failed (403). Search-level across three outlets: on 9 December 2025 the Transport Ministry activated Visa-accepting payment machines at ticket booths and subscription offices on Lines 1 and 2 only. Critically this is payment AT THE COUNTER, not open-loop EMV at the gate. The same ministry statement quoted 'more than 4.5 million passengers daily' — one of four irreconcilable ridership figures, so unused.
- Claims linked
- Background source; no baseline claim points here
Indra (supplier, 10 June 2026) — Cairo monorail ABT
- Stable source ID
src-36b5e331ff9ca566- Publisher
- Name not classified · indragroup.com
- Type / language
- web-page · language not classified
- Published
- 2026-06-10
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. The monorail runs a separate account-based system across 35 stations, 400+ faregates. Decisive negative evidence: the release lists EMV bank card access and mobile app integration as FUTURE capabilities, and describes integration with other operators as something possible 'further ahead' — confirming no unified card and no open loop exist today.
- Claims linked
SceneNow (press, 27 Nov 2025)
- Stable source ID
src-0b7fcb64ee458e2c- Publisher
- Name not classified · scenenow.com
- Type / language
- web-page · language not classified
- Published
- 2025-11-27
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. The unified metro/monorail/LRT/bus card spanning ECM, RATP Dev, Mwasalat Misr and private operators is 'being developed', with no launch date and no figures. Establishes the re-announcement two years after the first.
- Claims linked
- Background source; no baseline claim points here
Egyptian Streets (press, 8 Nov 2023)
- Stable source ID
src-591d7c1f9826cd05- Publisher
- Name not classified · egyptianstreets.com
- Type / language
- web-page · language not classified
- Published
- 2023-11-08
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. The first announcement, by Minister of Transport Kamel Al-Wazir: one card for trains, metro, light rail and buses. No timeline, no figures, nothing operational at the time.
- Claims linked
Transport for Cairo — Metro GTFS (third party)
- Stable source ID
src-a0b412566afb78bb- Publisher
- Name not classified · github.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. Basis for the open-data finding. A civic initiative, not the operator, released the only machine-readable Cairo Metro feed for Open Data Day Cairo 2016, licensed CC BY-NC 4.0, with the README caveat that 'All data related to schedules and dates are estimations'.
- Claims linked
cairometro.org (independent guide)
- Stable source ID
src-7d98635aeef7a3c0- Publisher
- Name not classified · cairometro.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Fetched OK. LOW AUTHORITY — self-declared as not operated by the National Authority for Tunnels or any government body. Used only to corroborate that one card is valid on all three lines, that it works tap-in/tap-out with the band deducted automatically, that paper single-journey tickets are still sold, and that Visa is accepted at booths on Lines 1 and 2 only. The official operator site cairometro.gov.eg returned 503 on every attempt, so no operator confirmation of the card price or network-wide validity was obtainable.
- Claims linked
- Background source; no baseline claim points here
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Cairo Metro Contactless Fare Card” — Cairo, Egypt. The Smart City Atlas. https://1001smartcities.org/projects/cairo-metro-ticketing/ (last verified 2026-07-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
