Permanent project revision

Procempa Infovia Municipal Fibre Network

Revision 2026-11-15-baseline · effective 2026-11-15

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

sha256:488fd2cd0ba7f345cf99759790e9c372e6060b9805339545993c3b95bba25f35

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
10
of 10 claims mapped
5
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-eab6202a80d71f1c quantitative
Porto Alegre's municipal IT company Procempa began building the Infovia, a city-owned network of fibre and radio links, in 2000
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Baguete (2011) says the Infovia connects the city to the municipal network via radio or optical fibre and that works began in 2000; the service page says Procempa developed and manages it.
Caveat
Procempa's page says only that it was deployed more than 20 years ago; the 2000 start comes from the 2011 press report.

Sources carrying this claim

  1. Baguete — Infovia across 100% of Porto Alegre (5 Apr 2011)
  2. Prefeitura de Porto Alegre — Infovia Procempa service page
Claim 2 clm-134d5bf4eee0258f descriptive
It carries the data and communications of city bodies such as schools, health posts, traffic and security.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The service page says the system and communication data of city bodies such as schools, health posts, traffic and security travel over the Infovia.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Infovia Procempa service page
Claim 3 clm-4a0f8bd3fa284985 quantitative
In 2007 the fibre network measured 323 km and carried a municipal digital phone network linking 86 city buildings.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Baguete (July 2007) reports 86 city buildings linked to the digital phone network (RDTM), which Procempa's president says is made possible by the Infovia, 'our 323 km optical fibre network'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Baguete — Procempa network already links 86 city buildings (2 Jul 2007)
Claim 4 clm-efacc26e835964ef quantitative
Procempa now describes about 1,000 km of network with 52 points of presence and 14 transmission towers
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The service page describes a network of about 1,000 km, 52 PoPs and 14 transmission towers across the city.
Caveat
The service page carries no date.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Infovia Procempa service page
Claim 5 clm-65f9c23386148193 quantitative
in 2022 the city said the Infovia made Wi-Fi in all 96 municipal schools feasible
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The March 2022 note says Wi-Fi installation was completed in the 96 municipal schools and that the project was viable also because of the Infovia, the municipal fibre network.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Municipal schools get full Wi-Fi coverage (9 Mar 2022)
Claim 6 clm-addc11610ea83ba3 quantitative
Procempa's president said in 2007 that the digital phone network running over the Infovia saved the city R$7.2 million a year.
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Baguete quotes Procempa's president André Imar Kulczynski that the RDTM saves the city R$7.2 million a year.
Caveat
An operator's statement with no published method or baseline.

Sources carrying this claim

  1. Baguete — Procempa network already links 86 city buildings (2 Jul 2007)
Claim 7 clm-bfde60f714d3aa9f quantitative
During the May 2024 flood Procempa said communication between city departments was not interrupted because the fibre did not break.
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 7 May 2024 notice says communication between secretariats was not interrupted and, with no strong winds, the optical fibre did not break.
Caveat
Procempa's own account, issued during the emergency.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Procempa keeps operating despite flooding (7 May 2024)
Claim 8 clm-1a9d76ccfdb69126 quantitative
the May 2024 flood forced Procempa to switch off one data centre and the city's integrated command centre
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The notice says the flooding of the Ipiranga headquarters led Procempa to cut power to the building and to the Integrated Command Centre (CEIC), and to shut down one of its data centres (DC2).
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Procempa keeps operating despite flooding (7 May 2024)
Claim 9 clm-faff6481099209ec descriptive
yet the network kept departments connected
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The notice says the 800 km network was essential to keep communication running.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Procempa keeps operating despite flooding (7 May 2024)
Claim 10 clm-3acb74684899f106 quantitative
that flood notice spoke of an 800 km network, while the company's service page gives about 1,000 km
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The May 2024 notice refers to 'a rede de 800km'; the undated service page gives about 1,000 km of extension.
Caveat
The two figures may measure different things (fibre only versus all links), but neither page says so.

Sources carrying this claim

  1. Prefeitura de Porto Alegre — Procempa keeps operating despite flooding (7 May 2024)
  2. Prefeitura de Porto Alegre — Infovia Procempa service page

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-15-baseline effective 2026-11-15 · created 2026-11-15

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:488fd2cd0ba7f345cf99759790e9c372e6060b9805339545993c3b95bba25f35
10
of 10 claims mapped
5
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Procempa (Companhia de Processamento de Dados do Município de Porto Alegre)
Actor types
city-government
Funding model
public
Funding description
Not recorded
Cost
≈R$3.5M to 2011 (Baguete)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

Prefeitura de Porto Alegre — Infovia Procempa service page prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-a2db9942d80dd36c
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Procempa's description of the Infovia: a high-speed network carrying data and communications of city bodies such as schools, health posts, traffic and security; about 1,000 km, 52 points of presence and 14 transmission towers; Procempa maintains all components.

Descriptive only — not page/paragraph exact
Baguete — Infovia across 100% of Porto Alegre (5 Apr 2011) baguete.com.br · 1 linked claim

Open original source ↗

Stable source ID
src-b711e1342fdca050
Publisher
Name not classified · baguete.com.br
Type / language
web-page · language not classified
Published
2011-04-05
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Report that, after almost ten years, the Infovia (fibre or radio) is close to connecting the whole city to the municipal network; works began in 2000; the project cost about R$3.5 million; health-system computerisation (Wireless Saúde) drove completion.

Descriptive only — not page/paragraph exact
Baguete — Procempa network already links 86 city buildings (2 Jul 2007) baguete.com.br · 2 linked claims

Open original source ↗

Stable source ID
src-cc932b42fda2239a
Publisher
Name not classified · baguete.com.br
Type / language
web-page · language not classified
Published
2007-07-02
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Report that the municipal digital phone network (RDTM), run over the Infovia's 323 km fibre network, links 86 city buildings; Procempa's president puts its annual saving at R$7.2 million.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Municipal schools get full Wi-Fi coverage (9 Mar 2022) prefeitura.poa.br · 1 linked claim

Open original source ↗

Stable source ID
src-1c47fb220281a2cc
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2022-03-09
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City note: Wi-Fi installed across all 96 municipal schools, executed by Procempa; the city says the project was viable because of the Infovia, with about 1,000 km of fibre.

Descriptive only — not page/paragraph exact
Prefeitura de Porto Alegre — Procempa keeps operating despite flooding (7 May 2024) prefeitura.poa.br · 4 linked claims

Open original source ↗

Stable source ID
src-77f8046cee06b68f
Publisher
Name not classified · prefeitura.poa.br
Type / language
web-page · language not classified
Published
2024-05-07
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-15
Dossier created
2026-11-15
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Procempa notice during the May 2024 flood: headquarters flooded, the integrated command centre (CEIC) and one data centre switched off; inter-department communication was not interrupted and the 800 km network kept communications running.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.