Porto Alegre's municipal IT company Procempa began building the Infovia, a city-owned network of fibre and radio links, in 2000
Permanent project revision
Revision 2026-11-15-baseline · effective 2026-11-15
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 10 claims and 5 source dossiers.
sha256:488fd2cd0ba7f345cf99759790e9c372e6060b9805339545993c3b95bba25f35
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-eab6202a80d71f1c
quantitative
Porto Alegre's municipal IT company Procempa began building the Infovia, a city-owned network of fibre and radio links, in 2000
clm-134d5bf4eee0258f
descriptive
It carries the data and communications of city bodies such as schools, health posts, traffic and security.
clm-4a0f8bd3fa284985
quantitative
In 2007 the fibre network measured 323 km and carried a municipal digital phone network linking 86 city buildings.
clm-efacc26e835964ef
quantitative
Procempa now describes about 1,000 km of network with 52 points of presence and 14 transmission towers
clm-65f9c23386148193
quantitative
in 2022 the city said the Infovia made Wi-Fi in all 96 municipal schools feasible
clm-addc11610ea83ba3
quantitative
Procempa's president said in 2007 that the digital phone network running over the Infovia saved the city R$7.2 million a year.
clm-bfde60f714d3aa9f
quantitative
During the May 2024 flood Procempa said communication between city departments was not interrupted because the fibre did not break.
clm-1a9d76ccfdb69126
quantitative
the May 2024 flood forced Procempa to switch off one data centre and the city's integrated command centre
clm-faff6481099209ec
descriptive
yet the network kept departments connected
clm-3acb74684899f106
quantitative
that flood notice spoke of an 800 km network, while the company's service page gives about 1,000 km
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:488fd2cd0ba7f345cf99759790e9c372e6060b9805339545993c3b95bba25f35
src-a2db9942d80dd36cProcempa's description of the Infovia: a high-speed network carrying data and communications of city bodies such as schools, health posts, traffic and security; about 1,000 km, 52 points of presence and 14 transmission towers; Procempa maintains all components.
src-b711e1342fdca050Report that, after almost ten years, the Infovia (fibre or radio) is close to connecting the whole city to the municipal network; works began in 2000; the project cost about R$3.5 million; health-system computerisation (Wireless Saúde) drove completion.
src-cc932b42fda2239aReport that the municipal digital phone network (RDTM), run over the Infovia's 323 km fibre network, links 86 city buildings; Procempa's president puts its annual saving at R$7.2 million.
src-1c47fb220281a2ccCity note: Wi-Fi installed across all 96 municipal schools, executed by Procempa; the city says the project was viable because of the Infovia, with about 1,000 km of fibre.
src-77f8046cee06b68fProcempa notice during the May 2024 flood: headquarters flooded, the integrated command centre (CEIC) and one data centre switched off; inter-department communication was not interrupted and the 800 km network kept communications running.