Permanent project revision

Line 169 Autonom: Västtrafik's Self-Driving Bus Test in Central Gothenburg

Revision 2026-11-11-baseline · effective 2026-11-11

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

sha256:b184b25e4de783497bb78df38f5a00be6ac196375232e4cd86e5e3da93f71ff3

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
14
of 14 claims mapped
6
source dossiers
6
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-c43d8ecb42cb878e descriptive
the transport authority owned by the Västra Götaland region
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik's releases state that it is owned by Västra Götalandsregionen and responsible for public transport in the region.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Västtrafik summerar test med självkörande buss – letar efter nya projekt (8 Sep 2026)
Claim 2 clm-c734e22b012ca40e quantitative
In 2021 two Navya minibuses ran a free weekday route, numbered 56, at Lindholmen until the end of May
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Drive Sweden announced two Navya-built minibuses on route 56 at Lindholmen, weekdays, free of charge, with the test running until the end of May 2021.
Caveat
This is the announcement of the trial; the sources listed do not report how it went.

Sources carrying this claim

  1. Drive Sweden — New route with autonomous shuttles launched in Drive Sweden project (18 Jan 2021)
Claim 3 clm-d2ec670f104e70da quantitative
the third phase of the S3 research project
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The announcement calls the Lindholmen test the third phase of S3, Shared Shuttle Services, after phases at Chalmers in Johanneberg and at Lindholmen Science Park.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Drive Sweden — New route with autonomous shuttles launched in Drive Sweden project (18 Jan 2021)
Claim 4 clm-494ef5f5a7707616 descriptive
an autonomous bus nearly as big as an ordinary city bus, run by Vy Buss with Västtrafik and the City of Gothenburg
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik describes the project as a collaboration of Västtrafik, the City of Gothenburg and Vy Buss, and the bus as almost as large as an ordinary city bus; the 2024 trade-press report names Vy Buss as the operator.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Västtrafiks självkörande buss öppnar för resenärer (25 May 2026)
  2. Sustainable Bus — New driverless project for Karsan: in Gothenburg from spring 2025 (11 Nov 2024)
Claim 5 clm-efa96c3f12657725 quantitative
passengers had been planned for August 2025
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The 2024 trade-press report gives the plan: test runs from spring 2025 without passengers and passengers from August 2025.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sustainable Bus — New driverless project for Karsan: in Gothenburg from spring 2025 (11 Nov 2024)
Claim 6 clm-caff16f04836d1b0 quantitative
After tests between Polhemsplatsen and Gårda, it moved at the end of March 2026 to a route between Gustaf Adolfs torg and Chalmers
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik's release of 31 March 2026 reports a new temporary permit and a new route from Gustaf Adolfs torg to Chalmers after earlier tests between Polhemsplatsen and Gårda.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Självkörande buss tillbaka i Göteborg (31 Mar 2026)
Claim 7 clm-a68af0ed64776fad descriptive
with a safety driver always aboard
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik states that a safety driver is always aboard and takes over when needed.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Självkörande buss tillbaka i Göteborg (31 Mar 2026)
Claim 8 clm-289a77be5e21aabe quantitative
Passengers were let on as line 169 Autonom on 25 May 2026, on ordinary tickets
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik opened the bus to passengers from Monday 25 May as line 169 Autonom, with ordinary Västtrafik tickets valid.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Västtrafiks självkörande buss öppnar för resenärer (25 May 2026)
Claim 9 clm-cc14a1421281fba1 descriptive
About an hour after the first departure the bus braked and a tram ran into it from behind; no one was hurt
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
TV4 reports the first departure at 10:00 and the collision about an hour later; Västtrafik's press officer says the bus braked and the tram ran into it from behind, and that no one was injured.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TV4 Nyheterna — Självkörande buss i krock – efter bara en timme (25 May 2026)
Claim 10 clm-04d7dfdf52e384b6 quantitative
The project was paused, the Swedish Transport Agency withdrew the permit for the trial on the route, and on 8 September 2026 Västtrafik ended the test
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik's release of 8 September 2026 says the project had been paused since the May accident, that the Swedish Transport Agency had withdrawn the permit for the trial on the route, and that the test ends.
Caveat
The agency's own decision and its reasons are not published in the sources listed; the withdrawal is reported by Västtrafik.

Sources carrying this claim

  1. Västtrafik — Västtrafik summerar test med självkörande buss – letar efter nya projekt (8 Sep 2026)
Claim 11 clm-c62474a9ac387e13 descriptive
Västtrafik had hoped later to try the safety driver moving out of the driver's seat
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik's chief executive said that in time they hoped to test traffic in which the safety driver moves out of the driver's seat.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Västtrafiks självkörande buss öppnar för resenärer (25 May 2026)
Claim 12 clm-bd6c455cfe74f693 descriptive
no source names a day on which that happened
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The closing release describes eight months of test runs with a safety driver and a pause after May; it names no stage at which the safety driver left the driver's seat.
Caveat
This is a statement about the absence of evidence across the sources listed here.

Sources carrying this claim

  1. Västtrafik — Västtrafik summerar test med självkörande buss – letar efter nya projekt (8 Sep 2026)
Claim 13 clm-043b248ed69f0024 descriptive
in Gårda, narrow streets and wrongly parked vehicles hurt the tests, so the bus moved to a route largely in its own lanes
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik says the bus would largely run in its own lanes on the new route, unlike earlier tests in Gårda where tight surroundings and wrongly parked vehicles affected the tests negatively.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Självkörande buss tillbaka i Göteborg (31 Mar 2026)
Claim 14 clm-7a5780639b87da21 descriptive
the traffic of central Gothenburg is too complex for the technology in its current form
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Västtrafik's development lead concludes that traffic in central Gothenburg is too complex for the technology in its current form.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Västtrafik — Västtrafik summerar test med självkörande buss – letar efter nya projekt (8 Sep 2026)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-11-baseline effective 2026-11-11 · created 2026-11-11

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:b184b25e4de783497bb78df38f5a00be6ac196375232e4cd86e5e3da93f71ff3
14
of 14 claims mapped
6
source dossiers
6
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Västtrafik (owned by Västra Götalandsregionen), with Vy Buss operating the bus and the City of Gothenburg as partner; the 2021 minibuses ran under the RISE-led S3 project
Actor types
regional-government, private, city-government, research
Funding model
public
Funding description
Financed by the Västra Götaland region, according to trade press in 2024; the 2021 S3 phase was part-funded by the innovation agency Vinnova through Drive Sweden. Totals are not published in the sources listed.
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Drive Sweden — New route with autonomous shuttles launched in Drive Sweden project (18 Jan 2021) drivesweden.net · 2 linked claims

Open original source ↗

Stable source ID
src-1fbdc30944556e09
Publisher
Name not classified · drivesweden.net
Type / language
web-page · language not classified
Published
2021-01-18
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Announcement of the third phase of the S3 (Shared Shuttle Services) project: two Navya minibuses on a free weekday route numbered 56 between the Hugo Hammars Kaj car park and Regnbågsgatan at Lindholmen, until the end of May 2021, with departures shown in Västtrafik's app. Earlier phases ran at Chalmers in Johanneberg and at Lindholmen Science Park.

Descriptive only — not page/paragraph exact
Sustainable Bus — New driverless project for Karsan: in Gothenburg from spring 2025 (11 Nov 2024) sustainable-bus.com · 2 linked claims

Open original source ↗

Stable source ID
src-64e5f0c0ff7aab16
Publisher
Name not classified · sustainable-bus.com
Type / language
web-page · language not classified
Published
2024-11-11
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade-press report, based on Bussmagasinet, on the plan: a Karsan Autonomous e-ATAK with Adastec driving software and software from Applied Autonomy, operated by Vy Buss for Västtrafik and financed by the Västra Götaland region; test runs without passengers from spring 2025 and passengers from August 2025, with the safety driver staying in the driver's seat.

Descriptive only — not page/paragraph exact
Västtrafik — Självkörande buss tillbaka i Göteborg (31 Mar 2026) via.tt.se · 3 linked claims

Open original source ↗

Stable source ID
src-16273859aece7dae
Publisher
Name not classified · via.tt.se
Type / language
web-page · language not classified
Published
2026-03-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Västtrafik's release on a new temporary permit from the Swedish Transport Agency and a new 2.6-kilometre route between Gustaf Adolfs torg and Chalmers, after earlier tests between Polhemsplatsen and Gårda where narrow streets and wrongly parked vehicles hurt the tests. A safety driver is always aboard; the bus runs largely in its own lanes.

Descriptive only — not page/paragraph exact
Västtrafik — Västtrafiks självkörande buss öppnar för resenärer (25 May 2026) via.tt.se · 3 linked claims

Open original source ↗

Stable source ID
src-bbe022e212500dc0
Publisher
Name not classified · via.tt.se
Type / language
web-page · language not classified
Published
2026-05-25
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Västtrafik's release opening the bus to passengers as line 169 Autonom from 25 May 2026, on ordinary tickets, a few days a week, with a safety driver aboard and a permit valid until 31 July 2027. The chief executive says the hope was later to test the safety driver moving out of the driver's seat.

Descriptive only — not page/paragraph exact
TV4 Nyheterna — Självkörande buss i krock – efter bara en timme (25 May 2026) tv4.se · 1 linked claim

Open original source ↗

Stable source ID
src-abf5a5a40b9b5f19
Publisher
Name not classified · tv4.se
Type / language
web-page · language not classified
Published
2026-05-25
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

TV4 report on the first passenger day: about an hour after the first departure at 10:00 the bus braked on Aschebergsgatan and a tram ran into it from behind. Västtrafik's press officer says a few passengers were aboard and no one was hurt.

Descriptive only — not page/paragraph exact
Västtrafik — Västtrafik summerar test med självkörande buss – letar efter nya projekt (8 Sep 2026) via.tt.se · 4 linked claims

Open original source ↗

Stable source ID
src-fa3e790665cb78a0
Publisher
Name not classified · via.tt.se
Type / language
web-page · language not classified
Published
2026-09-08
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-11
Dossier created
2026-11-11
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Västtrafik's closing release: after eight months of test runs the test in central Gothenburg ends; the project had been paused since the May collision and the Swedish Transport Agency had withdrawn the permit for the trial on the route. Västtrafik concludes that central Gothenburg's traffic is too complex for the technology in its current form and says it is looking for new projects.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.