Permanent project revision

Fukuoka City Subway Automatic Train Operation

Revision 2026-11-16-baseline · effective 2026-11-16

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

sha256:cede31cfce8a1f9cde69f9d406d1da77fb9f1bd12d92f5215c85e05b541a6d30

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
11
of 11 claims mapped
5
source dossiers
1
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-50b4ce360e0ae7c9 quantitative
Fukuoka City Subway opened its first section in July 1981
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The bureau's chronology lists 'July 1981: Muromi–Tenjin opened'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Fukuoka — Fukuoka City Subway timeline (reference material)
Claim 2 clm-0a34603ddc3e9649 quantitative
Hitachi's 1981 description of its train control system includes ATO, automatic train operation, working under ATC
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The paper describes the on-board automatic operation system and ATO (Automatic Train Operation) control set on the basis of ATC signals, for the subway opened on 26 July 1981.
Caveat
This is the supplier's own technical paper, not a statement by the city.

Sources carrying this claim

  1. Hitachi Review — train control and inspection system for the Fukuoka subway (Nov 1981)
Claim 3 clm-b80c6f92448caa18 quantitative
One-person operation followed in January 1984
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The chronology lists for 1984: 'January: one-person (one-man) operation introduced'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Fukuoka — Fukuoka City Subway timeline (reference material)
Claim 4 clm-a1bdaa01e88d83b1 quantitative
platform doors were completed at every Airport Line station in March 2004
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The chronology lists for March 2004 the completion of platform doors at all Airport Line stations (Meinohama–Fukuoka Airport).
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Fukuoka — Fukuoka City Subway timeline (reference material)
Claim 5 clm-83ec2e12d724e725 quantitative
The Nanakuma Line, opened on 3 February 2005
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Hitachi states the line opened on 3 February 2005; the city chronology lists February 2005 for Hashimoto–Tenjin-minami.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005)
  2. City of Fukuoka — Fukuoka City Subway timeline (reference material)
Claim 6 clm-683b5dc54ae79539 descriptive
what its supplier Hitachi calls the first full automatic operation system on a Japanese subway
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
Hitachi writes that the line adopted a full automatic operation system that is the first of its kind on a Japanese subway.
Caveat
A supplier's description of its own system; no independent source was found that ranks it.

Sources carrying this claim

  1. Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005)
Claim 7 clm-14e462a6b3444137 descriptive
the operations management system issues the door-close and departure command, and trains leave stations on their own
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The paper describes a 'vehicle door close (departure) command' output by the operations management system via the ATO ground transponder, after which the train departs automatically.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005)
Claim 8 clm-24eb4db26fe41c49 quantitative
Hitachi wrote in 2005 that the line runs with a crew member qualified to drive riding in the front cab
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
In its outlook section the paper states that the Nanakuma Line is operated with a crew member holding a driving qualification riding in the cab of the leading car.
Caveat
Dated to 2005; no source read states the current staffing.

Sources carrying this claim

  1. Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005)
Claim 9 clm-1a180ecd379418b5 quantitative
The city's plan for fiscal 2024 lists renewal of the ATC and ATO equipment.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The FY2024 operating policy lists 'renewal etc. of the automatic train control (ATC) and automatic train operation (ATO) equipment'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Fukuoka — Transportation Bureau operating policy for fiscal 2024
Claim 10 clm-852ee1d8e003a120 quantitative
A transport critic noted in 2023 that because the Nanakuma Line uses ATO, on paper no crew is needed, yet a driving console is fitted for emergencies.
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The article says that since automatic operation by ATO is adopted, in form no crew is needed, but driving equipment is fitted for emergencies.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Data Max — Nanakuma Line extension to Hakata: effects and remaining issues, part 1 (6 Apr 2023)
Claim 11 clm-3cd04d39b1bb29ae quantitative
Hitachi described the next step in 2005 as driverless operation with an attendant who no longer rides in the cab at all
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The outlook names 'driverless operation with an attendant', a mode in which crew are not permanently in the cab, as the extension of the technology.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-16-baseline effective 2026-11-16 · created 2026-11-16

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:cede31cfce8a1f9cde69f9d406d1da77fb9f1bd12d92f5215c85e05b541a6d30
11
of 11 claims mapped
5
source dossiers
1
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
City of Fukuoka Transportation Bureau (Fukuoka City Subway)
Actor types
city-government, private
Funding model
public
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

City of Fukuoka — Fukuoka City Subway timeline (reference material) subway.city.fukuoka.lg.jp · 4 linked claims

Open original source ↗

Stable source ID
src-283a027ec1354e2f
Publisher
Name not classified · subway.city.fukuoka.lg.jp
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-16
Dossier created
2026-11-16
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Transportation Bureau chronology 'Fukuoka City Subway so far': opening of Muromi–Tenjin in July 1981, one-person operation in January 1984, platform doors completed on the Airport Line in March 2004 and on the Hakozaki Line in December 2005, Nanakuma Line opening in February 2005.

Descriptive only — not page/paragraph exact
City of Fukuoka — Transportation Bureau operating policy for fiscal 2024 subway.city.fukuoka.lg.jp · 1 linked claim

Open original source ↗

Stable source ID
src-fb99d0cce43177ad
Publisher
Name not classified · subway.city.fukuoka.lg.jp
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-16
Dossier created
2026-11-16
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

FY2024 (Reiwa 6) operating policy of the Transportation Bureau; lists renewal of the automatic train control (ATC) and automatic train operation (ATO) equipment among safety measures, and the full introduction of touch-payment riding from 1 April.

Descriptive only — not page/paragraph exact
Hitachi Review — train control and inspection system for the Fukuoka subway (Nov 1981) hitachihyoron.com · 1 linked claim

Open original source ↗

Stable source ID
src-bc02c3e98662fb01
Publisher
Name not classified · hitachihyoron.com
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-16
Dossier created
2026-11-16
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Supplier's technical paper on the Fukuoka rapid-transit total system: the on-board automatic operation system, ATO speed and fixed-point stopping control working on ATC signals, opened 26 July 1981 as Kyushu's first subway.

Descriptive only — not page/paragraph exact
Hitachi Review — automatic operation system for the subway, Nanakuma Line (Sept 2005) hitachihyoron.com · 5 linked claims

Open original source ↗

Stable source ID
src-745fb954cad9d234
Publisher
Name not classified · hitachihyoron.com
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-16
Dossier created
2026-11-16
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Supplier's paper on the Nanakuma Line full automatic operation system: opening on 3 February 2005, claim of the first such system on a Japanese subway, the contracted-crew 'Fukuoka method', automatic door-close and departure commands from the operations management system, and the statement that a qualified crew member rides in the front cab.

Descriptive only — not page/paragraph exact
Data Max — Nanakuma Line extension to Hakata: effects and remaining issues, part 1 (6 Apr 2023) data-max.co.jp · 1 linked claim

Open original source ↗

Stable source ID
src-5d56fc570b3b7271
Publisher
Name not classified · data-max.co.jp
Type / language
web-page · language not classified
Published
2023-04-06
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-16
Dossier created
2026-11-16
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Commentary by transport critic Shigeto Horiuchi on the Nanakuma Line after the Hakata extension: automatic operation by ATO, driving equipment fitted for emergencies, platform doors at all stations since opening.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.