clm-9fa79aa79688426e
descriptive
Nürnberger Platz, the main station, Albertplatz and on to Klotzsche
Permanent project revision
Revision 2026-11-06-baseline · effective 2026-11-06
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 15 claims and 5 source dossiers.
sha256:1ad991f162a1439d99e83818184045f0bfead6302b3601e3e987cdacafc8ee49
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-9fa79aa79688426e
descriptive
Nürnberger Platz, the main station, Albertplatz and on to Klotzsche
clm-8f9c596ebd4ed2a7
descriptive
A higher-level computer links the city's VAMOS traffic management system with the operations control system of the Dresdner Verkehrsbetriebe (DVB)
clm-cf97aad46234bc27
descriptive
calculates a tailored but shorter green phase for each tram and bus
clm-d53c23bb27e6c3b7
descriptive
Late trams and buses get priority, early ones do not
clm-812ed102940883f0
descriptive
the time saved goes to cars, cyclists and pedestrians
clm-f190f7d520d0c675
quantitative
A driver information system in 83 trams recommends how to pass the next lights without stopping.
clm-61c80d54fa67d2d4
quantitative
Between 2008 and the end of 2016, €2.3 million converted 24 junctions
clm-5231d18171f12919
descriptive
a later project added three signals on Moränenende
clm-61762e423f827831
quantitative
The operator says 28 per cent of tram running time is lost at lights, slow zones and through other traffic.
clm-644d771a0ca6fdd4
quantitative
trams on lines 3, 7 and 8 save between six and eleven per cent of travel time per direction on the axis
clm-2a91b7f9935b5e04
quantitative
savings of up to 3 minutes per tram on the section, punctuality up 7 per cent
clm-0bde545042dbc80b
descriptive
vehicle energy use down by up to a fifth
clm-f7964d5b46a07d8d
descriptive
given only to vehicles running late
clm-28448d6c5096e65a
descriptive
without simply taking green time from everyone else
clm-b2b2184c32d8c153
quantitative
in Dresden that link was a joint project of city, operator and university from 2006 to 2017
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:1ad991f162a1439d99e83818184045f0bfead6302b3601e3e987cdacafc8ee49
src-b91f5e4401bf3c0bThe project-leading TU chair reports completion: 24 signals on the axis Nürnberger Platz – main station – Albertplatz – Klotzsche converted between 2008 and the end of 2016 for €2.3 million; a higher-level computer links the city's VAMOS with the DVB operations control system and gives late trams and buses priority; a driver information system in 83 trams; a DVB board member says trams on lines 3, 7 and 8 save six to eleven per cent of travel time per direction.
src-e35d5d5fcc1ad2d4A synthesis entry in the federal transport research information system, written by the Wuppertal Institute and based on a DVB brochure of November 2015: tram signal influence in Dresden since 1992, the whole tram network equipped since 2004; on the north-south axis savings of up to 3 minutes per tram, punctuality up 7 per cent and vehicle energy use down by up to a fifth.
src-d4d11fcfbb1faaa7The operator says only about 70 per cent of tram running time is spent moving and at stops; 28 per cent is lost at traffic lights, slow zones and through other road users, and links its operations control system with the city's VAMOS to work on this.
src-4473e1f47f3309e2The operator's account of the follow-up project with the city: three signals on Moränenende fitted with the same cooperative, quality-based signal control (QLSA) and communication with the onboard driver information system; €5.3 million invested in the whole project, with federal and state funding.
src-99cc454ced134e39The university journal interview states that cooperative solutions between vehicles and infrastructure are in regular operation on the north-south link between Albertplatz and Nürnberger Platz.