Permanent project revision

Nord-Süd-Verbindung Tram Signal Priority (QLSA)

Revision 2026-11-06-baseline · effective 2026-11-06

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 15 claims and 5 source dossiers.

sha256:1ad991f162a1439d99e83818184045f0bfead6302b3601e3e987cdacafc8ee49

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
15
of 15 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-9fa79aa79688426e descriptive
Nürnberger Platz, the main station, Albertplatz and on to Klotzsche
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The news item names the section Nürnberger Platz – Hauptbahnhof – Pirnaischer Platz – Albertplatz and on to Klotzsche, one of Dresden's most important traffic axes, as the project corridor.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 2 clm-8f9c596ebd4ed2a7 descriptive
A higher-level computer links the city's VAMOS traffic management system with the operations control system of the Dresdner Verkehrsbetriebe (DVB)
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item says the city road office's VAMOS traffic management system communicates with the DVB operations control system for this purpose.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 3 clm-cf97aad46234bc27 descriptive
calculates a tailored but shorter green phase for each tram and bus
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item says a higher-level computer determines tailored but shorter green times for buses and trams.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 5 clm-812ed102940883f0 descriptive
the time saved goes to cars, cyclists and pedestrians
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item says the green time saved is made available to motor traffic, cyclists and pedestrians.
Caveat
This is the project partners' description of the design; no published measurement of the effect on other traffic was found.

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 6 clm-f190f7d520d0c675 quantitative
A driver information system in 83 trams recommends how to pass the next lights without stopping.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item says the driver information system in 83 trams so far communicates with the lights and calculates recommendations so the driver passes the next signals without stopping. (The page repeats this paragraph twice with identical wording.)
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 7 clm-61c80d54fa67d2d4 quantitative
Between 2008 and the end of 2016, €2.3 million converted 24 junctions
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item says €2.3 million was used to convert 24 junctions between Nürnberger Platz and Klotzsche from 2008 to the end of 2016.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 8 clm-5231d18171f12919 descriptive
a later project added three signals on Moränenende
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The operator says three signals along Moränenende were fitted with the cooperative, quality-based signal control in the multimodal traffic management project.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. DVB — Projekt Multimodales Verkehrsmanagement der Landeshauptstadt Dresden
Claim 9 clm-61762e423f827831 quantitative
The operator says 28 per cent of tram running time is lost at lights, slow zones and through other traffic.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The DVB says 28 per cent of the time between first and last stop of its tram lines is lost waiting at lights, at slow zones and through obstruction by other road users.
Caveat
The page is undated; the figure describes the tram network as a whole, not the north-south axis.

Sources carrying this claim

  1. DVB — Verlässlicher Nahverkehr durch clevere Ampelschaltungen
Claim 10 clm-644d771a0ca6fdd4 quantitative
trams on lines 3, 7 and 8 save between six and eleven per cent of travel time per direction on the axis
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
At the project's acceptance, DVB board member Lars Seiffert said lines 3, 7 and 8 now move faster on the north-south link, saving six to eleven per cent of travel time per direction.
Caveat
An operator statement at the project's acceptance; no measurement method or before-and-after data was published with it.

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 11 clm-2a91b7f9935b5e04 quantitative
savings of up to 3 minutes per tram on the section, punctuality up 7 per cent
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The research database summary reports travel-time savings of up to 3 minutes per tram on the section and a 7 per cent improvement in punctuality, citing the DVB's 2015 brochure.
Caveat
A secondary summary of an operator brochure; the brochure itself was not available to check.

Sources carrying this claim

  1. Forschungsinformationssystem (BMV) — Intelligente LSA-Steuerung in Dresden als Praxisbeispiel zur Beschleunigung des ÖPNV
Claim 12 clm-0bde545042dbc80b descriptive
vehicle energy use down by up to a fifth
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The summary says energy consumption, measured on the vehicles, fell by up to a fifth, citing the same DVB brochure.
Caveat
Same operator source as above; 'up to' describes a best case, not an average.

Sources carrying this claim

  1. Forschungsinformationssystem (BMV) — Intelligente LSA-Steuerung in Dresden als Praxisbeispiel zur Beschleunigung des ÖPNV
Claim 14 clm-28448d6c5096e65a descriptive
without simply taking green time from everyone else
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The project partners say motor traffic also gains additional green time, because tram and bus green phases became shorter.
Caveat
A statement by the project partners, not an independent measurement.

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)
Claim 15 clm-b2b2184c32d8c153 quantitative
in Dresden that link was a joint project of city, operator and university from 2006 to 2017
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The item calls it a joint project of the city, DVB and TU Dresden begun in 2006, and reports its acceptance on 20 March 2017.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-11-06-baseline effective 2026-11-06 · created 2026-11-06

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:1ad991f162a1439d99e83818184045f0bfead6302b3601e3e987cdacafc8ee49
15
of 15 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Dresdner Verkehrsbetriebe (DVB) and City of Dresden (Straßen- und Tiefbauamt), project led by TU Dresden
Actor types
utility, city-government, research
Funding model
mixed
Funding description
EU funds provided by the Free State of Saxony, co-financed by DVB and the city's road and civil engineering office.
Cost
€2.3 million for 24 junctions (2008–2016)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

TU Dresden — Schneller über die Nord-Süd-Verbindung: Innovative Ampelsteuerung jetzt komplett (21 Mar 2017) tu-dresden.de · 11 linked claims

Open original source ↗

Stable source ID
src-b91f5e4401bf3c0b
Publisher
Name not classified · tu-dresden.de
Type / language
web-page · language not classified
Published
2017-03-21
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-06
Dossier created
2026-11-06
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The project-leading TU chair reports completion: 24 signals on the axis Nürnberger Platz – main station – Albertplatz – Klotzsche converted between 2008 and the end of 2016 for €2.3 million; a higher-level computer links the city's VAMOS with the DVB operations control system and gives late trams and buses priority; a driver information system in 83 trams; a DVB board member says trams on lines 3, 7 and 8 save six to eleven per cent of travel time per direction.

Descriptive only — not page/paragraph exact
Forschungsinformationssystem (BMV) — Intelligente LSA-Steuerung in Dresden als Praxisbeispiel zur Beschleunigung des ÖPNV forschungsinformationssystem.de · 2 linked claims

Open original source ↗

Stable source ID
src-e35d5d5fcc1ad2d4
Publisher
Name not classified · forschungsinformationssystem.de
Type / language
web-page · language not classified
Published
2019-03-22
Updated
2026-01-06
Source last checked
No source-level check date
Record last verified
2026-11-06
Dossier created
2026-11-06
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

A synthesis entry in the federal transport research information system, written by the Wuppertal Institute and based on a DVB brochure of November 2015: tram signal influence in Dresden since 1992, the whole tram network equipped since 2004; on the north-south axis savings of up to 3 minutes per tram, punctuality up 7 per cent and vehicle energy use down by up to a fifth.

Descriptive only — not page/paragraph exact
DVB — Verlässlicher Nahverkehr durch clevere Ampelschaltungen dvb.de · 1 linked claim

Open original source ↗

Stable source ID
src-d4d11fcfbb1faaa7
Publisher
Name not classified · dvb.de
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-06
Dossier created
2026-11-06
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The operator says only about 70 per cent of tram running time is spent moving and at stops; 28 per cent is lost at traffic lights, slow zones and through other road users, and links its operations control system with the city's VAMOS to work on this.

Descriptive only — not page/paragraph exact
DVB — Projekt Multimodales Verkehrsmanagement der Landeshauptstadt Dresden dvb.de · 1 linked claim

Open original source ↗

Stable source ID
src-4473e1f47f3309e2
Publisher
Name not classified · dvb.de
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-06
Dossier created
2026-11-06
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The operator's account of the follow-up project with the city: three signals on Moränenende fitted with the same cooperative, quality-based signal control (QLSA) and communication with the onboard driver information system; €5.3 million invested in the whole project, with federal and state funding.

Descriptive only — not page/paragraph exact
Dresdner Universitätsjournal — Erst kommt die Verkehrssicherheit, dann das Flüssigmachen des Verkehrs (2017) tu-dresden.de · background

Open original source ↗

Stable source ID
src-99cc454ced134e39
Publisher
Name not classified · tu-dresden.de
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-11-06
Dossier created
2026-11-06
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The university journal interview states that cooperative solutions between vehicles and infrastructure are in regular operation on the north-south link between Albertplatz and Nürnberger Platz.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.