Line 8 Driverless Metro (GoA4)
Tianjin Metro Line 8 opened on 28 December 2021 as the city's first GoA4 fully automatic line: Type-A six-car trains under CBTC signalling that run with no cab and no onboard driver, operated by Tianjin Rail Transit Group. The opening segment (formerly built as Line 6 Phase 2) runs 13.42 km across 9 stations between Nankai and Jinnan districts. Service was briefly suspended over the 2022 Lunar New Year amid a COVID-19 outbreak and resumed on 27 January 2022. A westward extension and an 18.54 km, 17-station Phase 1 main section are under construction, targeted for completion in 2026.
📖 Terms in this entry: CBTC (communications-based train control) · Grades of Automation (GoA) · Personal rapid transit (PRT)
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Line 8 Driverless Metro (GoA4)” — Tianjin, China. The Smart City Atlas. https://1001smartcities.org/projects/tianjin-metro-line8-goa4/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
