Most of Gran Santiago drinks Andean river water, and Andean storms are the problem: a cloudburst or landslide in the cordillera can push raw turbidity in the Maipo far past what a treatment plant can handle. Aguas Andinas, the private concessionaire that supplies the city and most of the metropolitan area, has cut supply to more than a million customers repeatedly, in February 2013, April 2016 and February 2017. Its answer was storage plus an alert. Six raw-water tanks at Pirque holding 1.5 million cubic metres entered service in December 2019 and were inaugurated by the public works minister in November 2020; with the Cerro Negro and Lo Mena wells they give the city 37 hours of production without touching a river, against 11 hours before. When cordillera weather and river readings turn bad the utility declares a preventive early alert, stops intake and runs the Las Vizcachas and La Florida plants on stored water. Nothing published makes that switch automatic; an operator decides. The buffer has held through repeated alerts since 2021, and it was overrun once: on 24 June 2023, after 280 mm of rain in four days, autonomy fell by half and 1,304,857 customers in 34 comunas lost supply anyway. Maipu and Cerrillos, served by the municipal utility SMAPA, sit outside this system.

Live 📅 since 2013 ✔ Editor-reviewed

✔ Reviewed by the 1001 Smart Cities editorial desk · 🔎 Last verified

📊 Impact

Aguas Andinas puts autonomy at 37 hours, from six Pirque tanks of 1,500,000 cubic metres costing about US$100 million plus the Cerro Negro and Lo Mena wells, against roughly 11 hours before them and about four hours in 2011; those figures are the operator's own, restated by the Ministry of Public Works at the November 2020 inauguration, and no independent audit of them was found. The events they answer are better documented. The Maipo normally runs between 40 and 500 NTU and the Las Vizcachas plant can treat to roughly 20,000 NTU, but February 2013 recorded 380,000 NTU and cut 1,128,044 customers, April 2016 reached 79,000 NTU and cut about 4.2 million residents across 29 comunas, and February 2017 hit 33 comunas. CIPER Chile found that customers had already paid about US$10 million through a 1.06 percent tariff rise for an earlier phase of works meant to prevent exactly this, which lifted autonomy from 3.3 to 13 hours. The regulator has acted: the Superintendencia de Servicios Sanitarios sanctioned the utility about US$1.7 million over the January and February 2013 cuts. Since the tanks opened the record is mixed, with alerts in 2021, 2022, 2023 and July 2026 passing without a cut and the 24 June 2023 storm cutting 1,304,857 customers regardless.

🎓 Lesson

Storage buys hours, not immunity. Reserves turned most turbidity events into a non-event, then the largest storm in decades halved the buffer and the cut happened anyway. Because the switch to reserves follows a declared alert and an operator's decision rather than an automatic threshold, the ceiling on this system is the size of the tank, not the speed of the alarm.

Evidence🏛️ Official
Scale🗺️ Regional
Cost≈US$100M for the Pirque tanks; ≈US$10M for the earlier phase
FundingRegulated customer tariffs, invested by the concessionaire

Sources

↗ Ministerio de Obras Públicas — inauguration of the Pirque mega-tanksGovernment primary source, fetched successfully. Verifies the 3 November 2020 inauguration, six tanks, 1,500,000 cubic metres, about US$100 million, autonomy from 11 to 34 hours and about four hours in 2011, and the ultrasonic sampling buoys and quality laboratory on site.
↗ La Tercera / Pulso — Pirque tanks to enter service (4 December 2019)Fetched successfully. Verifies that operation began in December 2019, eleven months before the ceremony, and that the tanks are phase two of a resilience plan begun in 2008. No SISS obligation is mentioned.
↗ La Tercera — supply cut to 34 comunas, 24 June 2023Fetched successfully. The test that the system failed: 1,304,857 customers in 34 comunas, autonomy of the Pirque tanks and the Cerro Negro and Lo Mena wells 'reducida un 50 por ciento', more than 280 mm of rain in four days against a normal 46 mm.
↗ CIPER Chile — investigation into tariff-funded works, 2 May 2016Independent investigative journalism, fetched successfully. Verifies the 1.06 percent tariff rise, about US$10 million in two years, the phase-one works (14 tanks of 225 million litres, seven La Pintana wells, El Yeso pipeline), autonomy 3.3 to 13 hours, the April 2016 cut at 79,000 NTU affecting about 4.2 million people in 29 comunas, and SISS's role in approving tariffs and opening investigations.
↗ Emol — the mass supply cuts since 2008 (21 April 2017)Fetched successfully. Verifies the chronology of mass cuts, the February 2013 reading of 380,000 NTU and 1,128,044 customers, the February 2017 cut across 33 comunas, and the roughly 20,000 NTU treatment ceiling at Las Vizcachas.
↗ BioBioChile — no turbidity episode during the July 2026 rainsFetched successfully; the currency check. Plants at 100 percent capacity, backup infrastructure of Pirque plus Cerro Negro and Lo Mena stated at 37 hours of autonomy. The article names no instrumentation type and no turbidity threshold, which is why the entry claims neither.
↗ iAgua — SISS sanctions Aguas Andinas over the Santiago supply cut (May 2013)FETCH FAILED, HTTP 429; every siss.gob.cl page attempted returned HTTP 503. The US$1.7 million sanction over the January and February 2013 cuts is verified only at headline level from the search index, not sentence-level in the page body. A more precise figure circulating in secondary summaries (1,650 UTA, about CLP 796 million) was deliberately NOT used because it could not be confirmed.
📎 Cite this project

1001 Smart Cities (2026). “Santiago's Turbidity Alert and Raw-Water Reserves” — Santiago, Chile. The Smart City Atlas. https://1001smartcities.org/projects/santiago-water-turbidity-response/ (last verified 2026-07-26). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next verified smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS