Montevideo Participatory Budget and Its Online Vote (Montevideo Participa)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
15 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Montevideo's participatory budget went online in 2018, and online votes reached 7,942 in 2023. Building what residents chose is slower: five of 54 works from 2021 were done by April 2023.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,247 documented projects · 🏙️ 10 more in Montevideo · 🗳️ Citizen participation guide · 🏛️ Governance projects
Montevideo's participatory budget lets residents propose works and social services for their area and then decide by secret ballot which ones are paid for from the Intendencia's budget; the vote is binding, and anyone aged 16 or over can propose and vote. It first ran in 1990, and its cycles now take place every two years. Since 2018 residents can also vote online, on CONSUL, the open-source participation software Montevideo adopted after a delegation from Madrid visited in 2017; casting a participatory-budget vote online requires a level-3 verified account through AGESIC, Uruguay's e-government agency. The platform was renamed from Montevideo Decide to Montevideo Participa after a new local government took office in 2020. Online votes rose from 602 in 2018 to 3,256 in 2021 and 7,942 in 2023.
📊 Impact
Delivery has lagged behind the vote. A 2023 column by Alejandro Andrada, a community activist from Casavalle, cited figures reported in 2021: 40 of the 382 proposals approved between 2006 and 2018 were still unfinished. By his count in April 2023, five of the 54 works chosen in the 2021 cycle had been completed.
🎓 Lesson
A digital ballot widens who can vote but does not touch the slower half of a participatory budget. Montevideo's online votes grew in each cycle from 2018 to 2023, while the works residents chose kept arriving late; residents judge the budget by the works, not by the ballot.
Sources
Show your work What this page rests on and what it can’t tell you · all 15 claims with their sources · the forensic record
Evidence file · public beta 15 addressable claims, 3 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 15
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-068fde39ed3d8d3e
descriptive
lets residents propose works and social services for their area and then decide by secret ballot which ones are paid for from the Intendencia's budget
Sources carrying this claim
clm-1e23cc7540347220
descriptive
the vote is binding
Sources carrying this claim
clm-4b0e8466a554802a
quantitative
anyone aged 16 or over can propose and vote
Sources carrying this claim
clm-06c6c45cf0cec897
quantitative
It first ran in 1990
Sources carrying this claim
clm-40340fccf7b7a846
descriptive
its cycles now take place every two years
Sources carrying this claim
clm-ca44944725f2a7e0
quantitative
Since 2018 residents can also vote online
Sources carrying this claim
clm-ffb8727324b83e44
quantitative
CONSUL, the open-source participation software Montevideo adopted after a delegation from Madrid visited in 2017
Sources carrying this claim
clm-acffeeb19aebe420
quantitative
casting a participatory-budget vote online requires a level-3 verified account through AGESIC, Uruguay's e-government agency
Sources carrying this claim
clm-41b08cfaf2341583
quantitative
renamed from Montevideo Decide to Montevideo Participa after a new local government took office in 2020
Sources carrying this claim
clm-ea07b71a935882e6
quantitative
Online votes rose from 602 in 2018 to 3,256 in 2021 and 7,942 in 2023
Sources carrying this claim
clm-37a979e715904941
quantitative
A 2023 column by Alejandro Andrada, a community activist from Casavalle
Sources carrying this claim
clm-b55382cc4b598e2a
quantitative
40 of the 382 proposals approved between 2006 and 2018 were still unfinished
Sources carrying this claim
clm-33100496e2dc5d09
quantitative
By his count in April 2023, five of the 54 works chosen in the 2021 cycle had been completed
Sources carrying this claim
clm-67274ba1cfb25978
quantitative
Montevideo's online votes grew in each cycle from 2018 to 2023
Sources carrying this claim
clm-cc8aac30bfffede4
descriptive
the works residents chose kept arriving late
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:dd68bde3bdb1c72b7b4ca2ecb2b224e7b225b53d9820f1260827e9e9c1b1ae28
- 15
- of 15 claims mapped
- 3
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Intendencia de Montevideo with the city's municipalities; the online platform runs on CONSUL Democracy software, maintained with the Gran Canaria company Usabi
- Actor types
- city-government
- Funding model
- public
- Funding description
- The works and services chosen are paid for from the Intendencia de Montevideo's budget; the amount per cycle is not stated in the sources read.
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
3 source dossiers
Catálogo de Participación Ciudadana (gub.uy) — Presupuesto Participativo - Montevideo
- Stable source ID
src-61f0bbba2b7d2174- Publisher
- Name not classified · gub.uy
- Type / language
- web-page · language not classified
- Published
- 2017-12-04
- Updated
- 2024-04-17
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-07
- Dossier created
- 2026-11-07
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Entry in the national catalogue of citizen-participation bodies, maintained for the Intendencia. It describes the participatory budget as the right of Montevideo's residents to propose and then decide by secret ballot works and social services financed from the Intendencia's budget; the decision is binding, and everyone over 16 can submit proposals and vote.
Consul Democracy — Use cases: Montevideo (Montevideo Participa)
- Stable source ID
src-9e43a55c73e0e659- Publisher
- Name not classified · docs.consuldemocracy.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-07
- Dossier created
- 2026-11-07
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Use-case page of the CONSUL Democracy project, quoting two Intendencia officials. It says CONSUL came to Montevideo after a Madrid delegation's visit in 2017, became the Montevideo Decide platform, and was renamed Montevideo Participa after the new local government of 2020; participatory budget cycles take place every two years; online votes were 602 in 2018, 3,256 in 2021 and 7,942 in 2023; voting requires a level-3 account verified through AGESIC; the platform is maintained with the company Usabi.
Montevideo Portal — Alejandro Andrada, Opinión: Los desafíos del Presupuesto Participativo de Montevideo (23 Apr 2023)
- Stable source ID
src-9a4e6b80bcdd86c4- Publisher
- Name not classified · montevideo.com.uy
- Type / language
- web-page · language not classified
- Published
- 2023-04-23
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-07
- Dossier created
- 2026-11-07
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Opinion column by a community activist. It says the participatory budget was first implemented in Montevideo in 1990, that figures reported in 2021 showed 40 of 382 proposals approved between 2006 and 2018 still unfinished, and that five of the 54 works of the 2021 cycle were finished when he wrote; it argues the process has lost its link to zonal development plans.
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Montevideo Participatory Budget and Its Online Vote (Montevideo Participa)” — Montevideo, Uruguay. The Smart City Atlas. https://1001smartcities.org/projects/montevideo-participatory-budget/ (last verified 2026-11-07). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
