Lisbon Drainage Master Plan Sensors
Lisbon's first drainage tunnel — 4.6km from Campolide to Santa Apolónia — had its boring completed in July 2025, part of a €250M drainage master plan that also includes a 17,000m3 retention basin; a second, delayed Beato tunnel is now due in 2029. Since 2023 a separate pilot network of ten flood/flow sensors, including one at Alcântara, has tracked water levels in flood-prone road tunnels.
🎓 Lesson
A drainage master plan on paper is not drainage in the ground — even a well-funded flagship climate-adaptation project has slipped years past its own deadlines.
📖 Terms in this entry: Adaptive traffic signals · Digital twin · LoRaWAN
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Lisbon Drainage Master Plan Sensors” — Lisbon, Portugal. The Smart City Atlas. https://1001smartcities.org/projects/lisbon-drainage-control/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.