RAJUK Electronic Construction Permitting System (ECPS)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
RAJUK, the authority that plans and permits building across greater Dhaka, moved land-use clearance and construction approval online in May 2019 and replaced that portal with the Electronic Construction Permitting System, launched on 19 September 2021 under the World Bank-financed Urban Resilience Project and built with the US consultancy RTI International. ECPS is an account-based workflow rather than a public register: a visitor without a login is offered a zone lookup, helpline numbers and notices, nothing more. In August 2026 it was again not accepting new applications, while it was rebuilt around the Dhaka Metropolitan Building Rules 2025.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →📊 Impact
RAJUK's Development Control Division counted 56,729 applications and 42,007 approved buildings between July 2018 and May 2025, a span covering both the earlier portal and ECPS, with officials putting the flow at around a thousand applications a month and a typical approval at 45 days. The World Bank's Independent Evaluation Group, reviewing the project that paid for the system, found that RAJUK started issuing e-permits for construction as targeted, but rated that objective substantial only because of the limited evidence on final outcomes, noting the indicators were output-oriented and that several sub-projects lacked allocated operation and maintenance funding when the project closed.
🎓 Lesson
The weak point was the discretion the system was meant to remove. On 19 May 2025 a design approval for a 15-storey building at Baunia badh in Mirpur, a wetland and height-restricted plot that had already been refused, was issued in seventeen minutes using a RAJUK official's ID and password, and online services then stayed down for three months. The contract with the firm that maintained the software had expired in June 2024 and no successor had been appointed. Two boundaries sit on either side of the software: a 2020 Bangladesh Institute of Planners study counted 21.46 lakh establishments in RAJUK's area of which 20.60 lakh had no approved design at all, and the rulebook the system enforces is itself contested, since the Detailed Area Plan gazetted on 24 August 2022 was reopened under developer pressure and an advisory committee approved raising floor area ratios across most of the capital on 19 October 2025.
Sources
Show 4 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2021. 7 of 9 sources carry a publication date, from 3 May 2019 to 16 November 2025.
When the sources were published
- The Daily Star, on RAJUK moving building approval online (media)
- The Financial Express, on the launch of the electronic construction permitting system (media)
- The Business Standard, on buildings constructed without approved designs (media)
- The Daily Star, on the draft DAP amendment raising floor area ratios (media)
- Prothom Alo, on the three-month suspension of RAJUK's online permitting (media)
- The Business Standard, on the DAP amendment approved by the advisory committee (media)
- The Business Standard, on RAJUK's draft ordinance and regularisation policy (media)
Show your work What this page rests on and what it can’t tell you · all 16 claims with their sources · the forensic record
Evidence Passport · public beta 16 addressable claims, 9 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 16
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2f4effd2c11d04c5
quantitative
RAJUK, the authority that plans and permits building across greater Dhaka, moved land-use clearance and construction approval online in May 2019
Sources carrying this claim
clm-38a55eb48efec9bb
quantitative
replaced that portal with the Electronic Construction Permitting System, launched on 19 September 2021 under the World Bank-financed Urban Resilience Project and built with the US consultancy RTI International
Sources carrying this claim
clm-7ea0854f00fb2b1e
descriptive
ECPS is an account-based workflow rather than a public register: a visitor without a login is offered a zone lookup, helpline numbers and notices, nothing more
Sources carrying this claim
clm-53d52f6dbc9ddf5e
quantitative
In August 2026 it was again not accepting new applications, while it was rebuilt around the Dhaka Metropolitan Building Rules 2025
Sources carrying this claim
clm-e5cdd5991c6b7c19
quantitative
RAJUK's Development Control Division counted 56,729 applications and 42,007 approved buildings between July 2018 and May 2025
Sources carrying this claim
clm-c2269a0ef3f4633b
descriptive
a span covering both the earlier portal and ECPS
Sources carrying this claim
clm-94b81f5371b7fda0
quantitative
officials putting the flow at around a thousand applications a month and a typical approval at 45 days
Sources carrying this claim
clm-f041a8db71da99db
descriptive
The World Bank's Independent Evaluation Group, reviewing the project that paid for the system, found that RAJUK started issuing e-permits for construction as targeted
Sources carrying this claim
clm-290126935245c2cc
descriptive
rated that objective substantial only because of the limited evidence on final outcomes, noting the indicators were output-oriented
Sources carrying this claim
clm-3b8fc48201c7451c
descriptive
several sub-projects lacked allocated operation and maintenance funding when the project closed
Sources carrying this claim
clm-8f9bd41036573b6d
quantitative
On 19 May 2025 a design approval for a 15-storey building at Baunia badh in Mirpur, a wetland and height-restricted plot that had already been refused, was issued in seventeen minutes using a RAJUK official's ID and password
Sources carrying this claim
clm-f6358b1f94d13ccc
descriptive
online services then stayed down for three months
Sources carrying this claim
clm-2662bc1f7d586ac5
quantitative
The contract with the firm that maintained the software had expired in June 2024 and no successor had been appointed
Sources carrying this claim
clm-6562c7509ccaf9bd
quantitative
a 2020 Bangladesh Institute of Planners study counted 21.46 lakh establishments in RAJUK's area of which 20.60 lakh had no approved design at all
Sources carrying this claim
clm-6cc116404871c232
quantitative
the rulebook the system enforces is itself contested, since the Detailed Area Plan gazetted on 24 August 2022 was reopened under developer pressure
Sources carrying this claim
clm-6bf1a8333624839a
quantitative
an advisory committee approved raising floor area ratios across most of the capital on 19 October 2025
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:07979bafd512c93d54adeb0e61f45b23b479f1c4a7842515d52d7cd8ad7ef875
- 16
- of 16 claims mapped
- 9
- source dossiers
- 7
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Rajdhani Unnayan Kartripakkha (RAJUK), the Capital Development Authority, under the Ministry of Housing and Public Works
- Actor types
- regional-government
- Funding model
- public
- Funding description
- World Bank IDA credit to the Government of Bangladesh under the Urban Resilience Project (P149493); system built with RTI International
- Cost
- ≈Tk 480 million (RAJUK sources), plus about Tk 50 million a year in maintenance
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
9 source dossiers
Prothom Alo, on the three-month suspension of RAJUK's online permitting (media)
- Stable source ID
src-79fcf0f89d0d271d- Publisher
- Name not classified · en.prothomalo.com
- Type / language
- web-page · language not classified
- Published
- 2025-08-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reported account of the suspension of design approval and land-use clearance between 19 May and late August 2025. Carries the pending caseload, the 19 May fraudulent approval at Baunia badh, the expired Dohatec maintenance contract, the 6 December 2023 loss of about 30,000 documents, the Development Control Division counts of 56,729 applications and 42,007 approved buildings for July 2018 to May 2025, and the sequence by which RAJUK went online (2016 limited land-use clearance, 2018 all zones, May 2019 both services). RAJUK sources in the same report date the ECPS itself to 2023 at a cost of Tk 480 million; the Financial Express reports the launch ceremony in September 2021, and this entry keeps both readings apart rather than resolving them.
The Financial Express, on the launch of the electronic construction permitting system (media)
- Stable source ID
src-07f49b26a36037c7- Publisher
- Name not classified · today.thefinancialexpress.com.bd
- Type / language
- web-page · language not classified
- Published
- 2021-09-20
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report of the launch ceremony held on Sunday 19 September 2021. Names the State Minister for Housing and Public Works as inaugurating the ECP system at a ceremony organised by RAJUK's Urban Resilience Project, records World Bank financing and RTI International as the consulting firm, and lists the memoranda signed with the Institution of Engineers Bangladesh and the Institution of Architects Bangladesh. Read on the newspaper's print mirror because the main domain returns HTTP 403 to automated reading.
- Claims linked
World Bank Independent Evaluation Group, ICR Review of the Bangladesh Urban Resilience Project (independent)
- Stable source ID
src-328edd27370d29e6- Publisher
- Name not classified · documents1.worldbank.org
- Type / language
- pdf · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report ICRR0024647, the Independent Evaluation Group's review of the Bangladesh Urban Resilience Project (P149493, approved 24 March 2015, closed 30 June 2024), which financed the ECPS. It records that RAJUK started issuing e-permits as targeted, that four systems were delivered against a target of three, and that the objective's efficacy is rated substantial only because of limited evidence on final outcomes with output-oriented indicators. The document itself prints no publication date on its face and the World Bank documents search returned no record for the report number, so none is recorded.
The Daily Star, on RAJUK moving building approval online (media)
- Stable source ID
src-e8620d339eeaa994- Publisher
- Name not classified · thedailystar.net
- Type / language
- web-page · language not classified
- Published
- 2019-05-03
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report on the day RAJUK began issuing land-use clearance and construction permits online, naming the registration site cp.rajukdhaka.gov.bd and recording that the automation programme had been launched by the public works minister in December 2015, roughly three and a half years earlier. The article carries no printed byline date; its CMS timestamp of 1556820000 resolves to midnight of Friday 3 May 2019 in Dhaka time, and the text says the service started the previous day.
- Claims linked
The Daily Star, on the draft DAP amendment raising floor area ratios (media)
- Stable source ID
src-158c3d5661ca44d7- Publisher
- Name not classified · thedailystar.net
- Type / language
- web-page · language not classified
- Published
- 2025-08-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report on the draft DAP amendment. Carries the gazette date of the Detailed Area Plan 2022-2035, the finding that most of the capital's 68 zones see floor area ratio rise by 20 to 80 per cent, the individual zone figures, the formation of a seven-member advisory committee on 15 December 2024, the in-principle approval at a stakeholders' meeting on 10 August 2025, and the objections of the Bangladesh Institute of Planners.
- Claims linked
The Business Standard, on the DAP amendment approved by the advisory committee (media)
- Stable source ID
src-ca6d1c96d32dc5ec- Publisher
- Name not classified · tbsnews.net
- Type / language
- web-page · language not classified
- Published
- 2025-10-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report of the advisory committee meeting held at the housing and public works ministry that gave policy approval to the DAP amendments, raising maximum building height in almost all areas of the capital, with the ministry saying the updated plan would be gazetted. The page also carries a same-day modification stamp of 19 October 2025 20:36, which is not recorded because it does not differ from the publication date.
- Claims linked
The Business Standard, on buildings constructed without approved designs (media)
- Stable source ID
src-eebc2688618a3563- Publisher
- Name not classified · tbsnews.net
- Type / language
- web-page · language not classified
- Published
- 2022-02-26
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report carrying the 2020 Bangladesh Institute of Planners study on establishments in the RAJUK area without approved designs, and a Transparency International Bangladesh study on bribes paid to secure design approval. The headline figure of 96 per cent is the newspaper's own arithmetic on the institute's two counts; this entry cites the counts rather than the percentage.
- Claims linked
The Business Standard, on RAJUK's draft ordinance and regularisation policy (media)
- Stable source ID
src-ad7e17b47df65b58- Publisher
- Name not classified · tbsnews.net
- Type / language
- web-page · language not classified
- Published
- 2025-11-16
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report on RAJUK's draft ordinance and its first policy to assess and regularise structures built without approved designs, recording that RAJUK acknowledges a vast number of buildings in its jurisdiction were built without official design approval. Used for the currency of the unapproved-building problem, not for any figure.
- Claims linked
- Background source; no baseline claim points here
RAJUK, Electronic Construction Permitting System portal (operator)
- Stable source ID
src-ed5f1c261a8699f7- Publisher
- Name not classified · rajuk.ecps.gov.bd
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The permitting portal itself, read on 27 August 2026. For an anonymous visitor the page renders the Global Report, Daily Report Mail and Suspended Professionals items with an inline display:none and exposes only a zone and sub-zone lookup, helpline numbers by zone, and notices; everything else is behind the login. The Bengali urgent notice states that submission of plan approval, special project clearance, construction approval and appeal applications is temporarily closed while the system is upgraded to the Dhaka Metropolitan Building Rules 2025, and that applications filed under the previous rules continue to be processed. The footer reads: Electronic Construction Permitting System (ECPS); Urban Resilience Project: RAJUK Part. A live portal states no publication date.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “RAJUK Electronic Construction Permitting System (ECPS)” — Dhaka, Bangladesh. The Smart City Atlas. https://1001smartcities.org/projects/dhaka-rajuk-permits/ (last verified 2026-08-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
