WASH Smart City Initiative — Al Mansour water-meter pilot
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
In 2017–18 UNICEF and the Mayoralty of Baghdad piloted smart water meters in the affluent Al Mansour district, installing 149 units mostly in homes. The meters were never networked, so readings still needed a six-monthly site visit. An independent 2021 UNICEF evaluation found the pilot cut neither consumption nor water losses.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →📊 Impact
An independent 2021 evaluation found the pilot delivered no reduction in water consumption or network losses; because the 149 meters were not networked, remote monitoring was impossible and they were still read manually every six months, much like the conventional meters they replaced.
🎓 Lesson
Smart meters without a network or volumetric billing behave like conventional meters — the intelligence lives in the system around the meter (telemetry, billing reform), not the meter itself.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “WASH Smart City Initiative — Al Mansour water-meter pilot” — Baghdad, Iraq. The Smart City Atlas. https://1001smartcities.org/projects/baghdad-wash-smart-meters/ (last verified 2026-08-07). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
