 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "yaounde-camwater-smart-water-meters",
  "title": "Camwater Smart/Prepaid Water Metering Program",
  "canonicalUrl": "https://1001smartcities.org/projects/yaounde-camwater-smart-water-meters/"
 },
 "currentRevisionId": "2026-11-04-evidence-baseline",
 "revisions": [
  {
   "id": "2026-11-04-evidence-baseline",
   "createdAt": "2026-11-04T05:50:08Z",
   "effectiveAt": "2026-11-03",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 21 claims and 6 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:1dcb414f2e368647f9ddda19efff07e095a3eb28771fbdc21febd13fe679a886",
   "snapshot": {
    "asOf": "2026-11-03",
    "projectFingerprint": "sha256:4e5d5540bc1d78a3e483b508ab28a92121e07065979b4742dacbb28ed2fa9a13",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "planning",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2020,
      "ended": null
     }
    },
    "governance": {
     "operator": "Camwater (Cameroon Water Utilities Corporation)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": null,
     "cost": "CFA721.76 million (2026 contract for 3,000 meters; tender estimate CFA1 billion)",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-14ff7c1565cc536d",
      "field": "snippet",
      "text": "Camwater, Cameroon's public water utility",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-411f2fc687e1f738"
      ],
      "supportNote": "The report describes Camwater as the public utility producing, transporting, distributing and selling drinking water in urban areas.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ee4e46a52ab24bff",
      "field": "snippet",
      "text": "since 2020, when it ran a restricted international tender",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-411f2fc687e1f738"
      ],
      "supportNote": "The March 2020 report describes the restricted international tender for a technical partner.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4bec882de0d4438c",
      "field": "snippet",
      "text": "presented a pilot phase covering 3,000 meters split between the two cities",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0d30721f75b5f04b"
      ],
      "supportNote": "The report on the August 2020 presentation describes a first pilot of 3,000 meters in Yaoundé and Douala.",
      "caveat": "No source gives the split between the two cities.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a7dc83476da82b1f",
      "field": "snippet",
      "text": "replacing manual meter reading with phone- or card-based prepaid recharging",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0d30721f75b5f04b",
       "src-411f2fc687e1f738"
      ],
      "supportNote": "The utility says the meters can be recharged by phone or card and will reduce the number of meter readers; the tender cites unreliable manual reading.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d3b08e296d58ff4e",
      "field": "snippet",
      "text": "to cut billing disputes and revenue losses",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-411f2fc687e1f738",
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The tender attributes multiple subscriber complaints to manual reading; the 2026 programme is designed to improve billing and recover revenue.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3e729040f3de0889",
      "field": "snippet",
      "text": "A 2021 press report questioned whether the pilot had stalled",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-3eb704c0f73c5dfd"
      ],
      "supportNote": "The February 2021 report's headline asks where the smart meters promised in 2020 had gone.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b5ee0d0d309250e6",
      "field": "snippet",
      "text": "the supplier later said it had installed about 1,500 prepaid meters in Bonabéri, in Douala, in 2021",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report cites the supplier's statement about its 2021 installation.",
      "caveat": "A supplier statement; Camwater has not published a count.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f93c7abae4b09bb",
      "field": "snippet",
      "text": "no source gives a count for Yaoundé",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report notes that an earlier publication placed the pilot in Bonabéri and Odza while giving inconsistent totals, and that the 2026 documents do not divide the meters between the two areas.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ec287702f7e04b4a",
      "field": "snippet",
      "text": "In June 2026 Camwater issued a new international tender",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db5ff904d723be95"
      ],
      "supportNote": "The regulator's listing publishes Camwater's open international tender of 3 June 2026.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-892d7724f346a84e",
      "field": "snippet",
      "text": "budget ~1 billion FCFA",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db5ff904d723be95"
      ],
      "supportNote": "The notice gives an estimated cost of one billion CFA francs including taxes.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ef8a8f91f75695c3",
      "field": "snippet",
      "text": "financed through the Ministry of Water and Energy's Public Investment Budget under the PFORR IMPACT program",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db5ff904d723be95"
      ],
      "supportNote": "The notice charges the contract to the public investment budget through the Ministry of Water and Energy and carries the IMPACT programme reference.",
      "caveat": "The same notice also refers to the programme's World Bank IDA credit; it does not say how much comes from each source.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-86a075550bae3e30",
      "field": "snippet",
      "text": "for supply, installation and commissioning of an intelligent metering system",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db5ff904d723be95"
      ],
      "supportNote": "The notice describes the scope of the contract.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ebce4135c39c14a8",
      "field": "snippet",
      "text": "with a delivery period the notice gives as both 180 and 200 days",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db5ff904d723be95",
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "One clause of the notice sets a maximum of 180 days and the delivery clause sets 200 days; the September 2026 report points out the discrepancy.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cff045c9141cfbf4",
      "field": "snippet",
      "text": "In August 2026 it awarded the contract — 3,000 smart meters for CFA721.76 million — to China's Hangzhou Laison Technology",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report describes the award decision signed on 17 August 2026.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-79a5edaf19bfea0b",
      "field": "snippet",
      "text": "naming Bonabéri in Douala and Odza in Yaoundé as pilot areas",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report cites the tender documents' pilot areas.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9eeeb17f95888dd0",
      "field": "snippet",
      "text": "the first installations were not expected before October 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report cites the World Bank's June 2026 status of the programme.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-0c304e36cef7570f",
      "field": "impact",
      "text": "No result was recorded in 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report cites the World Bank's programme monitoring.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e8fa39c9a7006ebf",
      "field": "impact",
      "text": "as of June 2026 the World Bank, which ties part of its IDA financing to the programme, rated the revenue indicator for smart-metered areas off track",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report describes the IDA allocation tied to the revenue indicator and the World Bank's 'off track' rating.",
      "caveat": "The World Bank co-finances the programme, so this is a funder's monitoring, not an independent evaluation.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-68f53c22562b036e",
      "field": "impact",
      "text": "no published assessment shows how the 2021 pilot meters performed or what revenue they brought in",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report states that public sources contain no assessment of the earlier devices.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f05de8284912fda9",
      "field": "lesson",
      "text": "A pilot that is announced, tendered and tendered again without a published result cannot teach the next round anything",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0d30721f75b5f04b",
       "src-db5ff904d723be95",
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "Camwater announced a 3,000-meter pilot in 2020, tendered again in 2026, and no assessment of the first round has been published.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a21bcebb360ecf78",
      "field": "lesson",
      "text": "the 2026 contract documents do not say whether the new meters supplement, replace or restart the ones installed in 2021",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ad9c8d3591f77707"
      ],
      "supportNote": "The report notes the silence of the tender documents on the earlier system.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-0d30721f75b5f04b",
      "title": "Journal du Cameroun — 2020 pilot presentation, 3,000-meter Yaoundé/Douala scope, prepaid recharge mechanism",
      "url": "https://fr.journalducameroun.com/camwater-lance-phase-pilote-compteurs-eau-intelligents/",
      "publisher": {
       "name": null,
       "domain": "fr.journalducameroun.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4bec882de0d4438c",
       "clm-a7dc83476da82b1f",
       "clm-f05de8284912fda9"
      ],
      "temporal": {
       "publishedAt": "2020-08-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "20 August 2020: Camwater presented its smart meters to consumer associations; a pilot of 3,000 meters is planned in Yaoundé and Douala, rechargeable by phone or card, to reduce meter readers and billing complaints.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-411f2fc687e1f738",
      "title": "StopBlaBlaCam — March 2020 restricted international tender for a technical partner",
      "url": "https://www.stopblablacam.com/economy/0903-3483-camwater-seeks-technical-partner-to-deploy-smart-water-meters",
      "publisher": {
       "name": null,
       "domain": "stopblablacam.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-14ff7c1565cc536d",
       "clm-ee4e46a52ab24bff",
       "clm-a7dc83476da82b1f",
       "clm-d3b08e296d58ff4e"
      ],
      "temporal": {
       "publishedAt": "2020-03-09",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "March 2020: restricted international tender among four named consortia for a technical partner to deploy smart meters for Camwater's more than 400,000 consumers, tested first on two sites in Yaoundé and Douala; rationale: unreliable manual reading and billing complaints.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-3eb704c0f73c5dfd",
      "title": "actucameroun.com (Feb 2021) — questions where the promised smart meters went",
      "url": "https://actucameroun.com/2021/02/15/camwater-ou-sont-passe-les-compteurs-intelligents/",
      "publisher": {
       "name": null,
       "domain": "actucameroun.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3e729040f3de0889"
      ],
      "temporal": {
       "publishedAt": "2021-02-15",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "February 2021 report asking where the smart meters promised in 2020 had gone.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-db5ff904d723be95",
      "title": "ARMP (Cameroon's public procurement regulator) — 2026 tender listing",
      "url": "https://www.armp.cm/details?type_publication=AO&id_publication=63134",
      "publisher": {
       "name": null,
       "domain": "armp.cm",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-ec287702f7e04b4a",
       "clm-892d7724f346a84e",
       "clm-ef8a8f91f75695c3",
       "clm-86a075550bae3e30",
       "clm-ebce4135c39c14a8",
       "clm-f05de8284912fda9"
      ],
      "temporal": {
       "publishedAt": "2026-06-04",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Open international tender of 3 June 2026 (urgent procedure) for supply, installation, testing and commissioning of a smart water-metering system; estimated cost CFA1 billion; financed from the public investment budget through the Ministry of Water and Energy while also citing the IMPACT programme's IDA credit; delivery period stated as 180 days in one section and 200 days in another.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5a238ba3730b403f",
      "title": "237online.com (July 2026) — renewed rollout coverage",
      "url": "https://www.237online.com/compteurs-intelligents-camwater-yaounde/",
      "publisher": {
       "name": null,
       "domain": "237online.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2026-07-07",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "July 2026: a three-year pilot phase announced for Yaoundé and Douala under the IMPACT programme; awareness sessions under way, no meters yet installed.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-ad9c8d3591f77707",
      "title": "Business in Cameroon — Camwater awards 3,000-meter smart-meter contract (Sept 2026)",
      "url": "https://www.businessincameroon.com/public-management/0109-16648-cameroon-s-water-utility-turns-to-smart-meters-to-recover-more-revenue",
      "publisher": {
       "name": null,
       "domain": "businessincameroon.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d3b08e296d58ff4e",
       "clm-b5ee0d0d309250e6",
       "clm-5f93c7abae4b09bb",
       "clm-ebce4135c39c14a8",
       "clm-cff045c9141cfbf4",
       "clm-79a5edaf19bfea0b",
       "clm-9eeeb17f95888dd0",
       "clm-0c304e36cef7570f",
       "clm-e8fa39c9a7006ebf",
       "clm-68f53c22562b036e",
       "clm-f05de8284912fda9",
       "clm-a21bcebb360ecf78"
      ],
      "temporal": {
       "publishedAt": "2026-09-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Camwater awarded Hangzhou Laison Technology a CFA721.76 million contract (decision of 17 August 2026) for 3,000 smart meters, the first 7.5% of 40,000 planned under the World Bank-backed IMPACT programme; pilot areas Bonabéri (Douala) and Odza (Yaoundé); first installations not expected before October 2026. As of 30 June 2026 the World Bank rated the smart-meter revenue indicator 'off track'. Laison says it installed about 1,500 prepaid meters in Bonabéri in 2021; no public assessment of how they performed exists.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 21,
     "claimsMapped": 21,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 6,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}