{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "washington-dc-smart-lighting",
  "title": "District Smart Lighting P3 Modernization",
  "canonicalUrl": "https://1001smartcities.org/projects/washington-dc-smart-lighting/"
 },
 "currentRevisionId": "2026-08-27-source-dating",
 "revisions": [
  {
   "id": "2026-08-26-p1-quality-uplift",
   "createdAt": "2026-08-26T14:11:55Z",
   "effectiveAt": "2026-08-26",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 6 claims and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:8d89d0b3632588fc8a2c746398383a6bbdcc789fd025230d5562e03ad98f5618",
   "snapshot": {
    "asOf": "2026-08-26",
    "projectFingerprint": "sha256:0236a0e91683fd13b3434653737a773414f482f7a8909d1deb6ae61c94457c82",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "construction",
     "outcome": "ongoing",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2022,
      "ended": null
     }
    },
    "governance": {
     "operator": "Plenary Infrastructure DC (DDOT P3)",
     "actorTypes": [
      "private",
      "city-government"
     ],
     "fundingModel": "ppp",
     "fundingDescription": "~$160M via DC's tax-exempt Revenue Bond Program (Private Activity Bonds + revenue bonds), plus private equity from Plenary Infrastructure DC",
     "cost": "$309M over 15 years",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-dad1b19675ac0ee8",
      "field": "snippet",
      "text": "DC's Smart Street Lighting Project — billed by officials as the nation's largest urban streetlight P3",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-450b62cd2efcfaa7",
       "src-00f1aa279c2a079b"
      ],
      "supportNote": "The department's own announcement of the winning bidder makes the claim, and the federal project profile records the deal as the District's first streetlight public-private partnership. The entry attributes the superlative rather than asserting it.",
      "caveat": "An official claim, carried as such. No independent register of urban streetlight partnerships was consulted to test it.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f8cdbdbd1e300f4",
      "field": "snippet",
      "text": "is converting the city's 75,000+ streetlights to networked LEDs with remote monitoring and 239 Wi-Fi access points",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-00f1aa279c2a079b",
       "src-090ce1f3839c587e"
      ],
      "supportNote": "The federal project profile and the department's streetlights page set out the scope of the conversion, the networked control layer and the Wi-Fi access points included in it.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-84fcd8c0acb1829a",
      "field": "snippet",
      "text": "under a $309m, 15-year contract with Plenary Infrastructure DC approved by the Council in February 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-00f1aa279c2a079b",
       "src-450b62cd2efcfaa7"
      ],
      "supportNote": "The federal project profile records the contract value, the term and the concessionaire; the department's announcement records the selection of that bidder.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-be414d7c9468e963",
      "field": "impact",
      "text": "By 2025, officials reported repairs down 49% and energy costs down 70% on lights already converted",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12"
      ],
      "supportNote": "The May 2025 trade report carries both figures as officials' results for the lights converted so far, with the retrofit still in progress.",
      "caveat": "Officials' own figures, reported in the trade press and measured only on the converted portion of the network.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9c7399b1de8026f5",
      "field": "impact",
      "text": "with an estimated 38,000 tons of annual greenhouse-gas emissions avoided once the network-wide retrofit is complete",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12"
      ],
      "supportNote": "The same report gives the emissions figure as a projection for the completed network, not a measurement of the current one.",
      "caveat": "A projection for a network that is not yet finished, stated as such.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5dc5965aae01a411",
      "field": "lesson",
      "text": "Repairs down 49% and energy down 70% are reported for lights already converted, mid-rollout, and the emissions saving is an estimate for a network that is not finished",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12",
       "src-00f1aa279c2a079b"
      ],
      "supportNote": "The trade report attaches both operating figures to the converted stock and the emissions figure to the completed network; the federal profile establishes that the contract runs fifteen years, so the rollout and the reporting period overlap for most of it.",
      "caveat": "The entry's own reading of how the figures are framed, not a criticism any source makes.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-090ce1f3839c587e",
      "title": "District Department of Transportation (authority)",
      "url": "https://ddot.dc.gov/page/streetlights",
      "publisher": {
       "name": null,
       "domain": "ddot.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-5f8cdbdbd1e300f4"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The department's standing streetlights page. A live portal with no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4f21e5a9cbc93aaa",
      "title": "Mayor's Office DC (authority)",
      "url": "https://mayor.dc.gov/release/mayor-bowser-celebrates-dc-smart-street-lighting-project-milestone-50-district%E2%80%99s",
      "publisher": {
       "name": null,
       "domain": "mayor.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The mayor's announcement of the halfway milestone. No publication date could be read from the page.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-450b62cd2efcfaa7",
      "title": "DDOT (authority)",
      "url": "https://ddot.dc.gov/release/ddot-selects-bidder-modernize-district%E2%80%99s-streetlight-network-through-city%E2%80%99s-first-public",
      "publisher": {
       "name": null,
       "domain": "ddot.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dad1b19675ac0ee8",
       "clm-84fcd8c0acb1829a"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The department's announcement of the winning bidder for the city's first streetlight public-private partnership. No publication date could be read from the page.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-00f1aa279c2a079b",
      "title": "FHWA Innovative Project Delivery — Project Profile (federal, independent)",
      "url": "https://www.fhwa.dot.gov/ipd/project_profiles/dc_street_light.aspx",
      "publisher": {
       "name": null,
       "domain": "fhwa.dot.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dad1b19675ac0ee8",
       "clm-5f8cdbdbd1e300f4",
       "clm-84fcd8c0acb1829a",
       "clm-5dc5965aae01a411"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The federal project profile for the deal, describing its structure and financing. A standing profile with no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-216e8aa251f3ab12",
      "title": "Planning Magazine, American Planning Association (trade press)",
      "url": "https://www.planning.org/planning/2025/may/dcs-massive-modernization-plan-lights-up-energy-savings/",
      "publisher": {
       "name": null,
       "domain": "planning.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-be414d7c9468e963",
       "clm-9c7399b1de8026f5",
       "clm-5dc5965aae01a411"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade reporting of the programme's mid-rollout results: repair and energy figures for converted lights and the estimated emissions saving.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 6,
     "claimsMapped": 6,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 4,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-source-dating",
   "createdAt": "2026-08-27T13:37:00Z",
   "effectiveAt": "2026-08-26",
   "changeType": "correction",
   "summary": "Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:89bbbf66c19630936b6e0f41ec4becc971e09d711c40145d96cdba8d1792e788",
   "snapshot": {
    "asOf": "2026-08-26",
    "projectFingerprint": "sha256:def5941bfeced99a3720b7f2e3fb0ed268702809bf7ca63babbc2788eb698186",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "construction",
     "outcome": "ongoing",
     "evidenceGrade": "media",
     "timeline": {
      "started": 2022,
      "ended": null
     }
    },
    "governance": {
     "operator": "Plenary Infrastructure DC (DDOT P3)",
     "actorTypes": [
      "private",
      "city-government"
     ],
     "fundingModel": "ppp",
     "fundingDescription": "~$160M via DC's tax-exempt Revenue Bond Program (Private Activity Bonds + revenue bonds), plus private equity from Plenary Infrastructure DC",
     "cost": "$309M over 15 years",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-dad1b19675ac0ee8",
      "field": "snippet",
      "text": "DC's Smart Street Lighting Project — billed by officials as the nation's largest urban streetlight P3",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-450b62cd2efcfaa7",
       "src-00f1aa279c2a079b"
      ],
      "supportNote": "The department's own announcement of the winning bidder makes the claim, and the federal project profile records the deal as the District's first streetlight public-private partnership. The entry attributes the superlative rather than asserting it.",
      "caveat": "An official claim, carried as such. No independent register of urban streetlight partnerships was consulted to test it.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5f8cdbdbd1e300f4",
      "field": "snippet",
      "text": "is converting the city's 75,000+ streetlights to networked LEDs with remote monitoring and 239 Wi-Fi access points",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-00f1aa279c2a079b",
       "src-090ce1f3839c587e"
      ],
      "supportNote": "The federal project profile and the department's streetlights page set out the scope of the conversion, the networked control layer and the Wi-Fi access points included in it.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-84fcd8c0acb1829a",
      "field": "snippet",
      "text": "under a $309m, 15-year contract with Plenary Infrastructure DC approved by the Council in February 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-00f1aa279c2a079b",
       "src-450b62cd2efcfaa7"
      ],
      "supportNote": "The federal project profile records the contract value, the term and the concessionaire; the department's announcement records the selection of that bidder.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-be414d7c9468e963",
      "field": "impact",
      "text": "By 2025, officials reported repairs down 49% and energy costs down 70% on lights already converted",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12"
      ],
      "supportNote": "The May 2025 trade report carries both figures as officials' results for the lights converted so far, with the retrofit still in progress.",
      "caveat": "Officials' own figures, reported in the trade press and measured only on the converted portion of the network.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9c7399b1de8026f5",
      "field": "impact",
      "text": "with an estimated 38,000 tons of annual greenhouse-gas emissions avoided once the network-wide retrofit is complete",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12"
      ],
      "supportNote": "The same report gives the emissions figure as a projection for the completed network, not a measurement of the current one.",
      "caveat": "A projection for a network that is not yet finished, stated as such.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5dc5965aae01a411",
      "field": "lesson",
      "text": "Repairs down 49% and energy down 70% are reported for lights already converted, mid-rollout, and the emissions saving is an estimate for a network that is not finished",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-216e8aa251f3ab12",
       "src-00f1aa279c2a079b"
      ],
      "supportNote": "The trade report attaches both operating figures to the converted stock and the emissions figure to the completed network; the federal profile establishes that the contract runs fifteen years, so the rollout and the reporting period overlap for most of it.",
      "caveat": "The entry's own reading of how the figures are framed, not a criticism any source makes.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-090ce1f3839c587e",
      "title": "District Department of Transportation (authority)",
      "url": "https://ddot.dc.gov/page/streetlights",
      "publisher": {
       "name": null,
       "domain": "ddot.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-5f8cdbdbd1e300f4"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The department's standing streetlights page. A live portal with no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4f21e5a9cbc93aaa",
      "title": "Mayor's Office DC (authority)",
      "url": "https://mayor.dc.gov/release/mayor-bowser-celebrates-dc-smart-street-lighting-project-milestone-50-district%E2%80%99s",
      "publisher": {
       "name": null,
       "domain": "mayor.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The mayor's announcement of the halfway milestone. No publication date could be read from the page. The page states no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-450b62cd2efcfaa7",
      "title": "DDOT (authority)",
      "url": "https://ddot.dc.gov/release/ddot-selects-bidder-modernize-district%E2%80%99s-streetlight-network-through-city%E2%80%99s-first-public",
      "publisher": {
       "name": null,
       "domain": "ddot.dc.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dad1b19675ac0ee8",
       "clm-84fcd8c0acb1829a"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The department's announcement of the winning bidder for the city's first streetlight public-private partnership. No publication date could be read from the page. The page states no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-00f1aa279c2a079b",
      "title": "FHWA Innovative Project Delivery — Project Profile (federal, independent)",
      "url": "https://www.fhwa.dot.gov/ipd/project_profiles/dc_street_light.aspx",
      "publisher": {
       "name": null,
       "domain": "fhwa.dot.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dad1b19675ac0ee8",
       "clm-5f8cdbdbd1e300f4",
       "clm-84fcd8c0acb1829a",
       "clm-5dc5965aae01a411"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The federal project profile for the deal, describing its structure and financing. A standing profile with no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-216e8aa251f3ab12",
      "title": "Planning Magazine, American Planning Association (trade press)",
      "url": "https://www.planning.org/planning/2025/may/dcs-massive-modernization-plan-lights-up-energy-savings/",
      "publisher": {
       "name": null,
       "domain": "planning.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-be414d7c9468e963",
       "clm-9c7399b1de8026f5",
       "clm-5dc5965aae01a411"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-26",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade reporting of the programme's mid-rollout results: repair and energy figures for converted lights and the estimated emissions saving.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 6,
     "claimsMapped": 6,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 4,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
