{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "stockholm-smart-energy-city",
  "title": "Smart Energy City: Real-Time Energy Monitoring in Norra Djurgårdsstaden",
  "canonicalUrl": "https://1001smartcities.org/projects/stockholm-smart-energy-city/"
 },
 "currentRevisionId": "2026-08-27-source-dating",
 "revisions": [
  {
   "id": "2026-08-27-claims-and-sources",
   "createdAt": "2026-08-27T04:19:37Z",
   "effectiveAt": "2026-07-28",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 6 claims and 6 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:9a0bbd79b0e1ec188b048fcdf9a29daa33eef16ef5332ef7cf99692084eea780",
   "snapshot": {
    "asOf": "2026-07-28",
    "projectFingerprint": "sha256:731925c8a0d88a65ce61e3ef39961c165e0d20e5297d93cbf7a913f642f52216",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "succeeded",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2015,
      "ended": 2018
     }
    },
    "governance": {
     "operator": "KTH with ABB, Ericsson, Fortum & Ellevio",
     "actorTypes": [
      "research",
      "private",
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "Co-financed by the Swedish Energy Agency (and Vinnova per academic analysis) alongside private consortium partners ABB, Ericsson, Fortum and Ellevio.",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-15e575b8a3b79fdc",
      "field": "snippet",
      "text": "Smart Energy City let 150 families in Norra Djurgårdsstaden (Stockholm Royal Seaport) see and steer their electricity, water and heat use in real time, so a washing machine could be set to run when the price or the climate impact was lower",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The city's project page states that in the Smart Energy City research project 150 families could see and control their energy use in real time, that the project developed solutions for using electricity, water and heat more smartly, and gives the washing machine set to run when climate impact or price is lower as the example.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-830b38b36dcd2e27",
      "field": "snippet",
      "text": "Announced in May 2015 by a consortium led by KTH with ABB, Fortum, Ellevio, Ericsson, Electrolux and several developers, it ran as a research project in 2017-2018 with funding from the Swedish Energy Agency",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-70a81491796776a5",
       "src-e40235b8282c45d2",
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The ABB and Fortum releases of early May 2015 announce the collaboration between leading energy, technology and construction companies for next-generation housing in Norra Djurgårdsstaden; the city's page gives the project period as 2017-2018, lists KTH, ABB, Fortum, Ellevio, Electrolux, Ericsson, Bonava, Heba and Erik Wallin among the participants, and names the Swedish Energy Agency as funder.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-01898d3957e39a2e",
      "field": "snippet",
      "text": "One of its stated questions was whether it makes a difference to show a household its consumption as carbon emissions rather than as money",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The city's page states that one question has been whether it makes any difference if households get their consumption visualised as carbon dioxide emissions or as money.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-6dbd782c80442a19",
      "field": "lesson",
      "text": "whether households behave differently when their consumption is shown as kilograms of CO2 instead of kronor is written up as something the project asked, with no published finding either way",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09",
       "src-f9739c8ab05e55d4"
      ],
      "supportNote": "The city's results section poses the question and reports no answer; the KTH record covers the pre-study rather than results.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b6f8cbb789033c88",
      "field": "lesson",
      "text": "a peer-reviewed study of Swedish smart-grid pilot projects published in 2025 is titled \"Experimenting to remain the same\"",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0c68185832d8a01f"
      ],
      "supportNote": "The article by Envall and Rohracher, published in Environmental Innovation and Societal Transitions volume 57 as article 101037 in December 2025, carries exactly this title and subject.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2340c935a164a432",
      "field": "lesson",
      "text": "nobody in the consortium was obliged to build one",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09",
       "src-b7c61bd4ac160025"
      ],
      "supportNote": "The project is described throughout as a research programme with a defined period and an agency funder, not as a service commitment by any of the participating companies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8f41d154a8364a09",
      "title": "Norra Djurgårdsstaden 2030 (City of Stockholm) — Smart Energy City",
      "url": "https://www.norradjurgardsstaden2030.se/innovationer/smart-energy-city",
      "publisher": {
       "name": null,
       "domain": "norradjurgardsstaden2030.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-15e575b8a3b79fdc",
       "clm-830b38b36dcd2e27",
       "clm-01898d3957e39a2e",
       "clm-6dbd782c80442a19",
       "clm-2340c935a164a432"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's project page, giving the project period, the participants, the funder and the research question.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-70a81491796776a5",
      "title": "ABB press release (2015)",
      "url": "https://new.abb.com/news/sv/detail/37941/ledande-energi-teknik-och-byggforetag-utvecklar-nasta-generations-boende-i-norra-djurgardsstaden",
      "publisher": {
       "name": null,
       "domain": "new.abb.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-830b38b36dcd2e27"
      ],
      "temporal": {
       "publishedAt": "2015-05-05",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Launch announcement, partner list, 150 apartments.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e40235b8282c45d2",
      "title": "Fortum press release (2015)",
      "url": "https://www.fortum.com/media/2015/05/leading-energy-technology-and-construction-companies-join-forces-develop-next-generation-sustainable-housing-stockholm",
      "publisher": {
       "name": null,
       "domain": "fortum.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-830b38b36dcd2e27"
      ],
      "temporal": {
       "publishedAt": "2015-05-04",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Technology description: real-time monitoring, demand response, predictive consumption.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b7c61bd4ac160025",
      "title": "Fastighetssverige — 'Nytt forskningsprogram om smarta elnät'",
      "url": "https://fastighetssverige.se/artikel/nytt-forskningsprogram-om-smarta-elnat-22648",
      "publisher": {
       "name": null,
       "domain": "fastighetssverige.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2340c935a164a432"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Partners, Swedish Energy Agency co-financing, final report timing (spring/Almedalen 2018).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0c68185832d8a01f",
      "title": "Envall & Rohracher, 'Experimenting to remain the same: The politics of smart grid pilot projects in the Swedish energy transition', Environmental Innovation and Societal Transitions 57, article 101037 (peer-reviewed)",
      "url": "https://www.sciencedirect.com/science/article/pii/S2210422425000760",
      "publisher": {
       "name": null,
       "domain": "sciencedirect.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b6f8cbb789033c88"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A peer-reviewed study of the politics of Swedish smart-grid pilot projects, published December 2025 (DOI 10.1016/j.eist.2025.101037).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f9739c8ab05e55d4",
      "title": "KTH — Smart Grid Information Management System, Royal Sea Port (pre-study)",
      "url": "https://www.kth.se/en/2.54128/tidigare-avdelningar/industriell-ekologi/forskning/finalized/smart-grid-information-management-system-in-royal-sea-port-1.75885",
      "publisher": {
       "name": null,
       "domain": "kth.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-6dbd782c80442a19"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-09-03",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The university record of the pre-study that preceded the pilot.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 6,
     "claimsMapped": 6,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 6,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-source-dating",
   "createdAt": "2026-08-27T13:37:00Z",
   "effectiveAt": "2026-07-28",
   "changeType": "correction",
   "summary": "Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:651a7a58058af46d6589930665725c58a2f48bad86d4ebeee1aa16ebec9c3c9f",
   "snapshot": {
    "asOf": "2026-07-28",
    "projectFingerprint": "sha256:108142230f8056e13d08cb00581038d3e73ed744f2ba1465e0f88e80dc9dd94d",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "completed",
     "outcome": "succeeded",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2015,
      "ended": 2018
     }
    },
    "governance": {
     "operator": "KTH with ABB, Ericsson, Fortum & Ellevio",
     "actorTypes": [
      "research",
      "private",
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "Co-financed by the Swedish Energy Agency (and Vinnova per academic analysis) alongside private consortium partners ABB, Ericsson, Fortum and Ellevio.",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-15e575b8a3b79fdc",
      "field": "snippet",
      "text": "Smart Energy City let 150 families in Norra Djurgårdsstaden (Stockholm Royal Seaport) see and steer their electricity, water and heat use in real time, so a washing machine could be set to run when the price or the climate impact was lower",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The city's project page states that in the Smart Energy City research project 150 families could see and control their energy use in real time, that the project developed solutions for using electricity, water and heat more smartly, and gives the washing machine set to run when climate impact or price is lower as the example.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-830b38b36dcd2e27",
      "field": "snippet",
      "text": "Announced in May 2015 by a consortium led by KTH with ABB, Fortum, Ellevio, Ericsson, Electrolux and several developers, it ran as a research project in 2017-2018 with funding from the Swedish Energy Agency",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-70a81491796776a5",
       "src-e40235b8282c45d2",
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The ABB and Fortum releases of early May 2015 announce the collaboration between leading energy, technology and construction companies for next-generation housing in Norra Djurgårdsstaden; the city's page gives the project period as 2017-2018, lists KTH, ABB, Fortum, Ellevio, Electrolux, Ericsson, Bonava, Heba and Erik Wallin among the participants, and names the Swedish Energy Agency as funder.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-01898d3957e39a2e",
      "field": "snippet",
      "text": "One of its stated questions was whether it makes a difference to show a household its consumption as carbon emissions rather than as money",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09"
      ],
      "supportNote": "The city's page states that one question has been whether it makes any difference if households get their consumption visualised as carbon dioxide emissions or as money.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-6dbd782c80442a19",
      "field": "lesson",
      "text": "whether households behave differently when their consumption is shown as kilograms of CO2 instead of kronor is written up as something the project asked, with no published finding either way",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09",
       "src-f9739c8ab05e55d4"
      ],
      "supportNote": "The city's results section poses the question and reports no answer; the KTH record covers the pre-study rather than results.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b6f8cbb789033c88",
      "field": "lesson",
      "text": "a peer-reviewed study of Swedish smart-grid pilot projects published in 2025 is titled \"Experimenting to remain the same\"",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0c68185832d8a01f"
      ],
      "supportNote": "The article by Envall and Rohracher, published in Environmental Innovation and Societal Transitions volume 57 as article 101037 in December 2025, carries exactly this title and subject.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2340c935a164a432",
      "field": "lesson",
      "text": "nobody in the consortium was obliged to build one",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8f41d154a8364a09",
       "src-b7c61bd4ac160025"
      ],
      "supportNote": "The project is described throughout as a research programme with a defined period and an agency funder, not as a service commitment by any of the participating companies.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8f41d154a8364a09",
      "title": "Norra Djurgårdsstaden 2030 (City of Stockholm) — Smart Energy City",
      "url": "https://www.norradjurgardsstaden2030.se/innovationer/smart-energy-city",
      "publisher": {
       "name": null,
       "domain": "norradjurgardsstaden2030.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-15e575b8a3b79fdc",
       "clm-830b38b36dcd2e27",
       "clm-01898d3957e39a2e",
       "clm-6dbd782c80442a19",
       "clm-2340c935a164a432"
      ],
      "temporal": {
       "publishedAt": "2022-06-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's project page, giving the project period, the participants, the funder and the research question.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-70a81491796776a5",
      "title": "ABB press release (2015)",
      "url": "https://new.abb.com/news/sv/detail/37941/ledande-energi-teknik-och-byggforetag-utvecklar-nasta-generations-boende-i-norra-djurgardsstaden",
      "publisher": {
       "name": null,
       "domain": "new.abb.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-830b38b36dcd2e27"
      ],
      "temporal": {
       "publishedAt": "2015-05-05",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Launch announcement, partner list, 150 apartments.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e40235b8282c45d2",
      "title": "Fortum press release (2015)",
      "url": "https://www.fortum.com/media/2015/05/leading-energy-technology-and-construction-companies-join-forces-develop-next-generation-sustainable-housing-stockholm",
      "publisher": {
       "name": null,
       "domain": "fortum.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-830b38b36dcd2e27"
      ],
      "temporal": {
       "publishedAt": "2015-05-04",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Technology description: real-time monitoring, demand response, predictive consumption.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b7c61bd4ac160025",
      "title": "Fastighetssverige — 'Nytt forskningsprogram om smarta elnät'",
      "url": "https://fastighetssverige.se/artikel/nytt-forskningsprogram-om-smarta-elnat-22648",
      "publisher": {
       "name": null,
       "domain": "fastighetssverige.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2340c935a164a432"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Partners, Swedish Energy Agency co-financing, final report timing (spring/Almedalen 2018). The page states no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0c68185832d8a01f",
      "title": "Envall & Rohracher, 'Experimenting to remain the same: The politics of smart grid pilot projects in the Swedish energy transition', Environmental Innovation and Societal Transitions 57, article 101037 (peer-reviewed)",
      "url": "https://www.sciencedirect.com/science/article/pii/S2210422425000760",
      "publisher": {
       "name": null,
       "domain": "sciencedirect.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b6f8cbb789033c88"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A peer-reviewed study of the politics of Swedish smart-grid pilot projects, published December 2025 (DOI 10.1016/j.eist.2025.101037). The page states no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f9739c8ab05e55d4",
      "title": "KTH — Smart Grid Information Management System, Royal Sea Port (pre-study)",
      "url": "https://www.kth.se/en/2.54128/tidigare-avdelningar/industriell-ekologi/forskning/finalized/smart-grid-information-management-system-in-royal-sea-port-1.75885",
      "publisher": {
       "name": null,
       "domain": "kth.se",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-6dbd782c80442a19"
      ],
      "temporal": {
       "publishedAt": "2011-01-14",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-28",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The university record of the pre-study that preceded the pilot. The page states Published Jan 14, 2011.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 6,
     "claimsMapped": 6,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 6,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
