 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "pune-iccc-command-control",
  "title": "Pune's Integrated Command and Control Centre (ICCC)",
  "canonicalUrl": "https://1001smartcities.org/projects/pune-iccc-command-control/"
 },
 "currentRevisionId": "2026-11-04-evidence-baseline",
 "revisions": [
  {
   "id": "2026-11-04-evidence-baseline",
   "createdAt": "2026-11-04T04:51:47Z",
   "effectiveAt": "2026-11-03",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 10 claims and 3 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:35c3ecaa382c76ab95fddb9afe3c0cccf189a456726a41a168d4cf006fa05a71",
   "snapshot": {
    "asOf": "2026-11-03",
    "projectFingerprint": "sha256:2324a7a78799a523dc4f77ef7130e9b990209196648efd53c3305bb616446e75",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2020,
      "ended": null
     }
    },
    "governance": {
     "operator": "Pune Smart City Development Corporation Limited (PSCDCL), for Pune Municipal Corporation",
     "actorTypes": [
      "city-government"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d6fd5e2fda2191a8",
      "field": "snippet",
      "text": "has run a citywide ICCC on Sinhagad Road since March 2020",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54",
       "src-c2f14505efdda75d"
      ],
      "supportNote": "The operator's award submission gives the ICCC start date as 1 March 2020; the 2026 report places the centre on Sinhagad Road.",
      "caveat": "The start date is the one the operator gave in its own award nomination.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e0f9dffe72cc3875",
      "field": "snippet",
      "text": "pulling in ambulance/108 tracking, GIS patient heat-mapping, traffic, street lighting, waste-vehicle and utility feeds",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54",
       "src-c2f14505efdda75d"
      ],
      "supportNote": "The submission says ambulances and the 108 helpline are tracked through the ICCC, describes GIS patient tracking and heat-mapping, and lists traffic, street lights and utilities in its functional coverage; the 2026 report adds the tracking of garbage vehicles.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-6c4de2cdc9e4094e",
      "field": "snippet",
      "text": "under one municipal-police-transport 'war room'",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54"
      ],
      "supportNote": "The submission says the municipal corporation, police and transport authorities work under one roof, and that the centre is used as a war room.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a184e2a1ee8d7a3c",
      "field": "snippet",
      "text": "During COVID-19 it coordinated 15 ward-level operations rooms",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54"
      ],
      "supportNote": "The submission says the war room coordinated around the clock with 15 local war rooms in ward offices.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-0b027ea0a992e5da",
      "field": "snippet",
      "text": "by its own account, logged and resolved 4,982 citizen requests",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54"
      ],
      "supportNote": "The operator's submission gives this count of citizen requests received and addressed during the pandemic.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9583002deb28b8a6",
      "field": "snippet",
      "text": "Its newest job, launched in 2026, is mapping roughly 2,000km of Pune's buried water, drainage and cable lines to stop repeated road-digging",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c2f14505efdda75d"
      ],
      "supportNote": "The May 2026 report says the centre has started mapping nearly 2,000km of underground pipelines, drainage lines and cables, partly to avoid repeated digging of roads.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9ce5095f1507d0b8",
      "field": "snippet",
      "text": "surveys along about 600km of major roads were under way in May 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c2f14505efdda75d"
      ],
      "supportNote": "The report says surveys covering nearly 600km along major roads are being carried out, with the rest to follow in phases.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-94fceac07371af92",
      "field": "snippet",
      "text": "The mapping belongs to a ₹52 crore upgrade of the old Smart City control centre by the municipal corporation",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2c8711f6bbbfd779"
      ],
      "supportNote": "The report describes the municipal corporation's ₹52 crore ICCC project as an upgrade of the previous Smart City control centre on Sinhagad Road, including asset and underground-utility mapping.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9108a91c455ee141",
      "field": "snippet",
      "text": "which by August 2025 had paid its contractor ₹29 crore while the underground surveys were still pending",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-2c8711f6bbbfd779"
      ],
      "supportNote": "A deputy commissioner confirmed the ₹29 crore payment and that the underground drainage and pipeline survey had not yet been done.",
      "caveat": "The account comes from a local news report citing municipal sources; no audit of the payment has been published.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3500ea08aa15db06",
      "field": "lesson",
      "text": "most of what is public about Pune's ICCC is the operator's own award narrative",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-741becb613df3e54"
      ],
      "supportNote": "The main published account of what the centre achieved is the operator's own award submission; no independent evaluation of the centre was found.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-741becb613df3e54",
      "title": "SKOCH Exhibition — PSCDCL ICCC award submission",
      "url": "https://exhibition.skoch.in/exhibition/pune-smart-city-development-corporation-limited-2/",
      "publisher": {
       "name": null,
       "domain": "exhibition.skoch.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d6fd5e2fda2191a8",
       "clm-e0f9dffe72cc3875",
       "clm-6c4de2cdc9e4094e",
       "clm-a184e2a1ee8d7a3c",
       "clm-0b027ea0a992e5da",
       "clm-3500ea08aa15db06"
      ],
      "temporal": {
       "publishedAt": "2020-11-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator's own account of ICCC launch date (1 March 2020), integrated systems, and the 4,982-request COVID figure.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c2f14505efdda75d",
      "title": "The Bridge Chronicle — underground utility mapping via ICCC",
      "url": "https://www.thebridgechronicle.com/amp/story/pune/pmc-underground-utility-network-mapping-pune-iccc-smart-monitoring-agn97",
      "publisher": {
       "name": null,
       "domain": "thebridgechronicle.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d6fd5e2fda2191a8",
       "clm-e0f9dffe72cc3875",
       "clm-9583002deb28b8a6",
       "clm-9ce5095f1507d0b8"
      ],
      "temporal": {
       "publishedAt": "2026-05-15",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "2026 currency check: confirms ICCC is on Sinhagad Road, handles ATMS/disaster/garbage monitoring, and describes the ~2,000km utility-mapping project (~600km surveyed so far).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-2c8711f6bbbfd779",
      "title": "Punekar News — PMC clears ₹29 crore bill for incomplete ICCC upgrade (11 August 2025)",
      "url": "https://www.punekarnews.in/?p=214905",
      "publisher": {
       "name": null,
       "domain": "punekarnews.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-94fceac07371af92",
       "clm-9108a91c455ee141"
      ],
      "temporal": {
       "publishedAt": "2025-08-11",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-11-03",
       "dossierCreatedAt": "2026-11-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports that the municipal corporation's ₹52 crore ICCC project upgrades the earlier Smart City control centre on Sinhagad Road, that ₹29 crore had been paid to the contractor MAHAPREIT, and quotes a deputy commissioner confirming the underground drainage and pipeline survey had not yet been done.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 10,
     "claimsMapped": 10,
     "sourcesTotal": 3,
     "sourcesUsedByClaims": 3,
     "sourcesWithPublicationDate": 3,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}