 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "nyc-zero-emission-buses",
  "title": "MTA Zero-Emission Bus Transition",
  "canonicalUrl": "https://1001smartcities.org/projects/nyc-zero-emission-buses/"
 },
 "currentRevisionId": "2026-08-22-evidence-baseline",
 "revisions": [
  {
   "id": "2026-08-22-evidence-baseline",
   "createdAt": "2026-08-22T21:10:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 18 claims and 9 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:63914b3fbab653f0e2f6e3f14191f55856ba4cc27a6fba13b09a6a6636e01737",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:48bf356fc00362bd3a6b1837c2d1a0a7fb9f865bb29aa284e712d5dad4f3a167",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2018,
      "ended": null
     }
    },
    "governance": {
     "operator": "MTA New York City Transit and MTA Bus Company (Metropolitan Transportation Authority)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "MTA capital programme, congestion-pricing revenue and federal transit grants",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-bb10cb721760ac84",
      "field": "snippet",
      "text": "committed in 2018 to converting its fleet of almost 6,000 buses",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4b6c53620ea1346"
      ],
      "supportNote": "The MTA case study opens: \"In 2018, the MTA announced a commitment to transition the entire bus fleet to zero-emissions by 2040.\" The fleet size is given in the same document: the MTA \"is transitioning its fleet of almost 6,000 buses to zero-emissions buses in four stages, closely aligned with the capital planning process.\"",
      "caveat": "The manufacturer's own announcement of the 2025 order dates the transition plan to 2023 rather than 2018; the two refer to different events — the 2018 commitment and the later published plan. A separate federal write-up counts the fleet as 5,800 buses.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2187a4804154bd6b",
      "field": "snippet",
      "text": "to zero emissions by 2040",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4b6c53620ea1346",
       "src-a50d6f0caa2baec2"
      ],
      "supportNote": "Both the operator and the manufacturer give 2040. The MTA document: \"a commitment to transition the entire bus fleet to zero-emissions by 2040\", tied to \"the MTA's goal to reduce agency-wide greenhouse gas emissions 85% by 2040\". New Flyer's release says the agency \"unveiled a plan in 2023 to fully transition its 5,800-bus fleet to zero-emission vehicles by 2040\".",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4d7e89f5d4601dee",
      "field": "snippet",
      "text": "Stage 1 was meant to put 560 battery-electric buses on the road",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4b6c53620ea1346"
      ],
      "supportNote": "The case study sets out four stages and describes the first: \"Stage 1 (2015-2019 & 2020-2024) deploys 560 battery-electric buses to test infrastructure and operational feasibility.\"",
      "caveat": "The document describes Stage 1 as a deployment to test infrastructure and operational feasibility, and does not itself say how many of the 560 were delivered.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d490d2b5b3b1ce90",
      "field": "snippet",
      "text": "by mid-2025 only 60 New Flyer buses were actually in service",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-cfa951c7f87b8d77",
       "src-deb4ae158e2b68bb"
      ],
      "supportNote": "Streetsblog, reporting the June 2025 board meeting: \"The 60 New Flyer electric buses that the MTA has already put into service are extremely unreliable because batteries overheat or fail to fully charge.\" The MTA's own press release from January 2025 counts the same 60: the 265-bus purchase \"builds on the 60 zero-emission buses that came last year\".",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b5dca0b12048a5a5",
      "field": "snippet",
      "text": "the MTA's own reporting to its board put them at 2,111 miles between major failures against 13,000 miles for diesel buses, available for a full day of service 60% of the time against 91%",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-cfa951c7f87b8d77"
      ],
      "supportNote": "Streetsblog reports the figures presented to the board: \"Only 60 percent of battery-electric buses are typically available for a full day of service, compared to 91 percent for diesel buses. And the number of miles a bus can travel before needing major repairs on average is just 2,111 miles for electric buses — and 13,000 miles for standard diesel buses.\"",
      "caveat": "The report that carried these figures to the board was written by the independent engineer who oversees the MTA's capital projects, so calling them the authority's own reporting is a simplification. The source describes the mileage figure as distance before major repairs rather than between failures.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-6cf1bbb3b5112eec",
      "field": "snippet",
      "text": "Deliveries of the next 205 and 265 buses were paused in 2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8e646cf242ce4732"
      ],
      "supportNote": "The June 2026 board briefing is reported as: \"Transit officials have paused orders on almost 500 electric buses they expected to receive last year and next amid reliability issues with the MTA's existing e-bus fleet.\" The same piece names both orders: \"The 2025 order remains on hold, as does an order of 265 electric buses that was due to arrive in 2027.\"",
      "caveat": "The 205-bus delivery was first paused in 2025, not 2026; the June 2026 briefing recorded that it remained on hold alongside the 265-bus order.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-6a7b419a5a6b8d9b",
      "field": "snippet",
      "text": "in July 2026 the authority cut a 380-bus order to 295 and substituted 85 diesel-electric hybrids",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-961ad4dc31015c2f"
      ],
      "supportNote": "\"MTA board members on Monday advanced an amendment to the authority's 2024 contract with bus manufacturer New Flyer that lowers the number of 40-foot e-buses in the order from 380 to 295, and swaps in 85 diesel-electric hybrids in their stead.\" The article is dated 27 July 2026.",
      "caveat": "On the day of the report the committee had advanced the amendment; the source says the final board vote was set for two days later.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cb7c70e9030be63f",
      "field": "snippet",
      "text": "the transition plan calls for roughly 262 MW of new power supply across 28 bus depots",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4b6c53620ea1346"
      ],
      "supportNote": "The operator's own case study states it directly: \"This transition will require approximately 262 MW of new power supply across 28 bus depots.\" The same paragraph says the MTA is \"exploring options like on-site battery storage and solar generation to reduce grid power demands\".",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a3882b8474fbde55",
      "field": "snippet",
      "text": "with automated overhead pantographs due at the Jamaica depot in autumn 2027",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-deb4ae158e2b68bb"
      ],
      "supportNote": "The MTA press release states that the MTA and NYPA are \"commissioning automated overhead pantographs that are expected to be operational at Jamaica Depot in fall of 2027\".",
      "caveat": "This is a forward-looking commissioning date given by the operator in January 2025, not an observed one.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-63a10dc59f1d7f30",
      "field": "snippet",
      "text": "State law sets a 2040 deadline for the whole fleet",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-961ad4dc31015c2f"
      ],
      "supportNote": "Streetsblog writes: \"State law mandates that the entire fleet comprise zero-emissions buses by the end of 2040.\" Two further reports in the same source list say the same thing in other words — the MTA \"has committed to meeting the state's mandate to have a fully electric fleet by 2040\" (24 June 2025) and \"the MTA's legally required transition to a zero-emissions fleet by 2040\" (23 June 2026).",
      "caveat": "The statute itself is not among the entry's sources; three reports by the same publication are. The entry previously said the opposite — that no state law requires the transition — which is the error this passage corrects.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3ca5ea7ab6ff3ea1",
      "field": "snippet",
      "text": "a bill that would have required zero-emission-only bus purchases from 2029 was stricken in the New York Senate in May 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-d38dca083f581a38"
      ],
      "supportNote": "The Senate page for S6089 (2023-2024) carries the title \"Relates to the purchase of zero-emission buses\", the status \"Stricken\", and the last Senate action \"May 06, 2024 — recommit, enacting clause stricken\". The bill text reads: \"NO LATER THAN JANUARY FIRST, TWO THOUSAND TWENTY-NINE, EVERY PUBLIC TRANSPORTATION SYSTEM ELIGIBLE TO RECEIVE OPERATING ASSISTANCE ... SHALL BE REQUIRED TO PURCHASE ONLY ZERO-EMISSION BUSES.\"",
      "caveat": "The bill covered every public transportation system in the state eligible for operating assistance, not the MTA alone.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b1a35721946a4806",
      "field": "impact",
      "text": "MTA figures reported to its board in June 2025: battery-electric buses averaged 2,111 miles between major failures against 13,000 miles for diesel buses, and were available for a full day of service 60% of the time against 91% for diesel.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-cfa951c7f87b8d77"
      ],
      "supportNote": "Streetsblog reported the board presentation of 23 June 2025: \"Only 60 percent of battery-electric buses are typically available for a full day of service, compared to 91 percent for diesel buses. And the number of miles a bus can travel before needing major repairs on average is just 2,111 miles for electric buses — and 13,000 miles for standard diesel buses.\" The same piece notes the comparison is not a manufacturer effect: \"the diesel buses are also built by New Flyer.\"",
      "caveat": "The figures were carried to the board in a report by the independent engineer who oversees the MTA's capital projects, so they are not purely the authority's own presentation. The source describes the mileage as distance before major repairs.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2ae97642b8696dc8",
      "field": "impact",
      "text": "A year later the board was given 2,500 miles against 8,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8e646cf242ce4732",
       "src-961ad4dc31015c2f"
      ],
      "supportNote": "Both June and July 2026 reports carry the second pair. In June 2026: \"The agency's existing electric buses only go 2,500 miles on average between major failures that take them off the road, compared to 8,500 miles on average for diesel buses, Jessie Lazarus, the MTA's head of rolling stock procurement, told agency board members.\" The July piece repeats it: the buses \"cover only about 2,500 miles on the road before a mechanical breakdown takes them out of service, compared to 8,500 miles for diesel buses.\"",
      "caveat": "The two pairs are not a like-for-like series. The diesel baseline itself moves from 13,000 to 8,500 miles between the two briefings, and the sources describe the measure differently in each year — distance before major repairs in 2025, distance before a breakdown that takes the bus out of service in 2026. The electric figure rises while the reported diesel figure falls, so the narrowing gap cannot be read as an improvement on a fixed yardstick.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1503cfef2d903e08",
      "field": "impact",
      "text": "MTA rolling-stock procurement head Jessie Lazarus described the electric buses as \"in service about 30 or 40 percent less than our diesel buses\"",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b75e74837d5570d5"
      ],
      "supportNote": "The quotation and the title are both in the source: \"“They’re also in service about 30 or 40 percent less than our diesel buses,” said Lazarus.\" She is identified in the same article as \"Jessie Lazarus, the MTA’s head of rolling stock procurement\", speaking at a June 2026 MTA board meeting; the piece adds that she \"presented data that indicates that the MTA’s battery-powered New Flyer buses have been breaking down more than three times as frequently as their diesel-powered counterparts.\"",
      "caveat": "The quoted sentence begins “They’re also in service…” in the source; the entry quotes it from the second word onwards.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ddf9b84f00a1a762",
      "field": "impact",
      "text": "In July 2026 the MTA reduced a 380-bus order to 295 and replaced the 85 cancelled battery-electric buses with diesel-electric hybrids, with the remaining deliveries pushed to April–December 2028.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-961ad4dc31015c2f"
      ],
      "supportNote": "\"MTA board members on Monday advanced an amendment to the authority’s 2024 contract with bus manufacturer New Flyer that lowers the number of 40-foot e-buses in the order from 380 to 295, and swaps in 85 diesel-electric hybrids in their stead. The buses are expected to arrive between April and December of 2028, officials said — three years after the MTA was supposed to begin accepting orders of the battery-electric buses.\" The article is dated 27 July 2026.",
      "caveat": "The order cut applies to the 40-foot buses in the 2024 New Flyer contract. On the day of the report the committee had advanced the amendment, with the final board vote set for two days later.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2d2a021f227e2299",
      "field": "lesson",
      "text": "mean distance between failures and availability are standing MTA performance measures",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8e646cf242ce4732",
       "src-cfa951c7f87b8d77"
      ],
      "supportNote": "Both measures appear as routine MTA reporting categories rather than one-off figures. The June 2026 report reproduces an MTA chart captioned \"Buses older than 12 years old clearly lag behind their younger compatriots on mean distance between failure\", credited to the MTA, and the same article notes Lazarus using the measure for the electric fleet. Availability for a full day of service is reported the same way in June 2025: \"An agency review found that just 60 percent of the battery-electric buses could stay in service for a full day.\"",
      "caveat": "The sources show both measures used in MTA board material and reproduce an MTA chart built on one of them, but none of them states that either is a formally published standing performance indicator.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-76161cb46022bca3",
      "field": "lesson",
      "text": "\"we must set some framework for evaluating the performance of propulsion before we go all in\"",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-961ad4dc31015c2f"
      ],
      "supportNote": "The quotation is verbatim: \"“Our lesson from this experience is that we must set some framework for evaluating the performance of propulsion before we go all in,” Jessie Lazarus, the MTA’s head of rolling stock procurement, told the committee on Monday. “We had 500 spots for battery-electric buses that didn’t really pan out, and so we have to catch up with our net new bus deliveries.”\"",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-93bfdaec4349e755",
      "field": "lesson",
      "text": "about 262 MW of new depot power across 28 depots",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f4b6c53620ea1346"
      ],
      "supportNote": "The figure is the operator's own: \"This transition will require approximately 262 MW of new power supply across 28 bus depots.\" The case study frames depot power as the central obstacle, calling the charging equipment the investment that is \"most consequentially\" needed, alongside vehicles and workforce skills.",
      "caveat": "The 262 MW figure is a planning estimate in the transition plan, not a built or contracted quantity.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-f4b6c53620ea1346",
      "title": "MTA — Transitioning to a zero-emissions bus fleet (20-Year Needs Assessment case study)",
      "url": "https://future.mta.info/documents/Improve_Sustainability_Zero-EmissionsFleet_CaseStudy.pdf",
      "publisher": {
       "name": null,
       "domain": "future.mta.info",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-bb10cb721760ac84",
       "clm-2187a4804154bd6b",
       "clm-4d7e89f5d4601dee",
       "clm-cb7c70e9030be63f",
       "clm-93bfdaec4349e755"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Primary MTA document. Carries the 2018 commitment wording ('In 2018, the MTA announced a commitment to transition the entire bus fleet to zero-emissions by 2040'), the fleet size of almost 6,000 buses, the four transition stages including 560 battery-electric buses in Stage 1, the ~262 MW of new power supply across 28 bus depots, and the agency-wide 85% GHG reduction goal.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-cfa951c7f87b8d77",
      "title": "Streetsblog NYC — Reliability Issues Could Delay 200 New Zero-Emission Buses This Year (24 June 2025)",
      "url": "https://nyc.streetsblog.org/2025/06/24/shocker-reliability-issues-could-delay-200-new-zero-emission-buses-this-year",
      "publisher": {
       "name": null,
       "domain": "nyc.streetsblog.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d490d2b5b3b1ce90",
       "clm-b5dca0b12048a5a5",
       "clm-b1a35721946a4806",
       "clm-2d2a021f227e2299"
      ],
      "temporal": {
       "publishedAt": "2025-06-24",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports the MTA's own figures presented to the board: 60 New Flyer electric buses in service, 2,111 miles between major repairs against 13,000 for diesel, 60% versus 91% full-day availability, and the named failure modes (battery overheating, electrical components affecting air brakes).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-961ad4dc31015c2f",
      "title": "Streetsblog NYC — Battery Drain: MTA Trims New Flyer Electric Bus Order (27 July 2026)",
      "url": "https://nyc.streetsblog.org/2026/07/27/battery-drain-mta-officially-punts-on-bus-electrification-cancels-85-buses",
      "publisher": {
       "name": null,
       "domain": "nyc.streetsblog.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-6a7b419a5a6b8d9b",
       "clm-63a10dc59f1d7f30",
       "clm-2ae97642b8696dc8",
       "clm-ddf9b84f00a1a762",
       "clm-76161cb46022bca3"
      ],
      "temporal": {
       "publishedAt": "2026-07-27",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the scale-back: order cut from 380 to 295 forty-foot electric buses, 85 diesel-electric hybrids substituted, deliveries moved to April–December 2028, the 2,500 versus 8,500 mile failure gap, and the Lazarus quote about setting a performance framework before going all in.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8e646cf242ce4732",
      "title": "Streetsblog NYC — Power Outage: MTA Delays Bus Electrification Amid Manufacturer Challenges (23 June 2026)",
      "url": "https://nyc.streetsblog.org/2026/06/23/power-outage-mta-delays-electric-buses",
      "publisher": {
       "name": null,
       "domain": "nyc.streetsblog.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-6cf1bbb3b5112eec",
       "clm-2ae97642b8696dc8",
       "clm-2d2a021f227e2299"
      ],
      "temporal": {
       "publishedAt": "2026-06-23",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Documents the pause of the 205-bus and 265-bus deliveries, the state of depot charging (seven depots operational or on pace by 2027, four more planned) and the shrinking supplier market after Nova Bus left the US in 2025.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-deb4ae158e2b68bb",
      "title": "Mass Transit (reprint of MTA press release) — MTA invests in 265 new zero-emission buses (Feb 2025)",
      "url": "https://www.masstransitmag.com/bus/vehicles/hybrid-hydrogen-electric-vehicles/press-release/55260514/mass-transportation-authority-mta-mta-invests-in-265-new-zero-emission-buses",
      "publisher": {
       "name": null,
       "domain": "masstransitmag.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d490d2b5b3b1ce90",
       "clm-a3882b8474fbde55"
      ],
      "temporal": {
       "publishedAt": "2025-01-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "MTA's own wording for the 265-bus purchase, the 60 zero-emission buses already delivered and 205 slated to follow, the congestion-pricing funding, and the Jamaica depot automated overhead pantographs expected in autumn 2027 plus pantograph work at Gun Hill and Queens Village.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a50d6f0caa2baec2",
      "title": "NFI Group / New Flyer — order for 265 battery-electric buses for MTA (14 Feb 2025)",
      "url": "https://www.globenewswire.com/news-release/2025/02/14/3026564/0/en/New-York-s-MTA-further-electrifies-fleet-with-order-for-265-battery-electric-buses-from-NFI-subsidiary-New-Flyer.html",
      "publisher": {
       "name": null,
       "domain": "globenewswire.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2187a4804154bd6b"
      ],
      "temporal": {
       "publishedAt": "2025-02-14",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Manufacturer confirmation of the order composition — 193 forty-foot and 72 sixty-foot Xcelsior CHARGE NG buses as an option order on the contract signed in Q1 2024, building on a firm order of 205. No contract value is disclosed, which is why this entry carries no cost figure.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d38dca083f581a38",
      "title": "New York State Senate — Bill S6089 (2023-2024)",
      "url": "https://www.nysenate.gov/legislation/bills/2023/S6089",
      "publisher": {
       "name": null,
       "domain": "nysenate.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3ca5ea7ab6ff3ea1"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The bill that would have required every public transportation system receiving state operating assistance to purchase only zero-emission buses from 1 January 2029. Status: stricken, last action 6 May 2024 — the evidence that the 2040 target rests on an MTA commitment, not on statute.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b75e74837d5570d5",
      "title": "Streetsblog Massachusetts — While NYC Warns of Reliability Problems, the T Stays the Course (6 July 2026)",
      "url": "https://mass.streetsblog.org/2026/07/06/while-nyc-warns-of-reliability-problems-the-t-stays-the-course-on-electric-buses",
      "publisher": {
       "name": null,
       "domain": "mass.streetsblog.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-1503cfef2d903e08"
      ],
      "temporal": {
       "publishedAt": "2026-07-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Source for the Lazarus quote that the electric buses are 'in service about 30 or 40 percent less than our diesel buses', and for the comparison that the New Flyer battery buses broke down more than three times as often as their diesel counterparts.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-6a4f797683cfcea2",
      "title": "US Joint Office of Energy and Transportation — MTA behind-the-meter storage case study",
      "url": "https://driveelectric.gov/news/mta-case-study",
      "publisher": {
       "name": null,
       "domain": "driveelectric.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2024-06-13",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent federal write-up of the Kingsbridge depot modelling study: 5,800 MTA buses carrying more than 2.1 million weekday riders, and behind-the-meter storage and solar modelled at more than 35% annual utility cost savings (about $2.08 million a year). Used here only as context for the depot-power problem.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 18,
     "claimsMapped": 18,
     "sourcesTotal": 9,
     "sourcesUsedByClaims": 8,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}