 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "mumbai-water-distribution-improvement",
  "title": "Mumbai Water Distribution Improvement Programme",
  "canonicalUrl": "https://1001smartcities.org/projects/mumbai-water-distribution-improvement/"
 },
 "currentRevisionId": "2026-08-26-claim-mapping",
 "revisions": [
  {
   "id": "2026-08-20-source-dates",
   "createdAt": "2026-08-20T19:29:52Z",
   "effectiveAt": "2026-07-26",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 1 claim and 4 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:e31e6a85b240db0f4a2da6520451f345b464a344048d4b1b3c69316cb5dd8c12",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:176a850253c0bd6555eef6e7338d7fde4339a50cd81f3eedbcfc990b5819a776",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "cancelled",
     "outcome": "failed",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2014,
      "ended": 2021
     }
    },
    "governance": {
     "operator": "Brihanmumbai Municipal Corporation, Hydraulic Engineer's Department; contractor Suez Environnement India",
     "actorTypes": [
      "city-government",
      "private"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-fcf34fafaf172250",
      "field": "impact",
      "text": "18.6% of the contract value executed by the July 2019 deadline",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f2e68171662bd995"
      ],
      "supportNote": "The figure is a national audit (CAG) finding, as reported in press coverage of the CAG questioning the BMC.",
      "caveat": "The impact field itself flags the audit finding as \"as reported\" — known through press coverage rather than the audit document directly.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-f2e68171662bd995",
      "title": "Mumbai Live — CAG questions BMC on 24x7 water supply project",
      "url": "https://www.mumbailive.com/en/civic/cag-questions-bmc-on-'24x7water-supply-project'-only-18-work-done-against-deadline-of-july-2019-44806",
      "publisher": {
       "name": null,
       "domain": "mumbailive.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-fcf34fafaf172250"
      ],
      "temporal": {
       "publishedAt": "2020-01-31",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports the national audit finding: 2014 award to Suez Environnement India at 276 crore rupees, only 18 per cent of work (18.60 per cent by monetary value) complete at the July 2019 deadline, pilot wards T (Mulund) and H West (Bandra).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20250723014731/https://www.mumbailive.com/en/civic/cag-questions-bmc-on-'24x7water-supply-project'-only-18-work-done-against-deadline-of-july-2019-44806",
       "archivedAt": "2025-07-23",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-116ac777187214ac",
      "title": "Construction World — BMC to wind up 24-hr water supply project (9 March 2021)",
      "url": "https://www.constructionworld.in/urban-infrastructure/wastewater-and-sewage-treatment/bmc-to-wind-up-24-hr-water-supply-project/26100",
      "publisher": {
       "name": null,
       "domain": "constructionworld.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2021-03-09",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Confirms the March 2021 discontinuation: the contractor filed for arbitration after the deadline expired; about 20 per cent of work complete; about 47 crore rupees paid; lists the ten contracted services including GIS mapping and leakage detection.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a66fe7bd8ba2f4d3",
      "title": "Observer Research Foundation — Tackling water stress in Mumbai (6 June 2023)",
      "url": "https://www.orfonline.org/expert-speak/tackling-water-stress-in-mumbai",
      "publisher": {
       "name": null,
       "domain": "orfonline.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-06-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent think-tank analysis: supply of 3,950 MLD against 4,200 MLD demand; estimated non-revenue water of 38 per cent including unmetered consumption as of 2016, against a national norm of 15 per cent; slums receive 45 lpcd against 135 lpcd in residential buildings.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-aaaf93db2a966a82",
      "title": "Indian Infrastructure — Modernising Systems: ULB initiatives to strengthen water networks (4 June 2026)",
      "url": "https://indianinfrastructure.com/2026/06/04/modernising-systems-ulb-initiatives-to-strengthen-water-networks/",
      "publisher": {
       "name": null,
       "domain": "indianinfrastructure.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2026-06-04",
       "updatedAt": "2026-06-16",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Current-state check on what BMC operates after the programme: SCADA plus district-metered-area pilots, automated meter reading, smart-meter pilots. None of it is attributed by the source to this programme, so none is claimed here.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-26-claim-mapping",
   "createdAt": "2026-08-26T23:13:33Z",
   "effectiveAt": "2026-07-26",
   "changeType": "update",
   "summary": "Added a five-claim evidence mapping and a sourced lesson; the impact now carries the wind-up terms and the state of the network afterwards alongside the audit's 18.60 per cent.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/claims",
     "summary": "Updated claims to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:dc9a8a4447430271b01eacbe831bc4747deb28fcf342a707b2575da6d23143f0",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:10709c9b5015db52a612981d0553928889eea647c19099dac49ac218cd9edcc2",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "cancelled",
     "outcome": "failed",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2014,
      "ended": 2021
     }
    },
    "governance": {
     "operator": "Brihanmumbai Municipal Corporation, Hydraulic Engineer's Department; contractor Suez Environnement India",
     "actorTypes": [
      "city-government",
      "private"
     ],
     "fundingModel": "public",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-36b7787fe144b77f",
      "field": "snippet",
      "text": "In 2014 the BMC hired Suez Environnement India under a 275 crore rupee contract to GIS-map Mumbai's poorly documented water network, zone it into district metered areas, meter connections, detect leaks and move two wards to continuous pressurised supply",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f2e68171662bd995",
       "src-116ac777187214ac"
      ],
      "supportNote": "The audit report as reported names the 2014 award to Suez Environment India at about 276 crore rupees and the two pilot wards; the 2021 report lists the ten contracted services including GIS mapping and leakage detection.",
      "caveat": "The reported contract value is about 276 crore rupees; the entry's 275 is a rounding of the same award.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-dc7e8358d63c211e",
      "field": "snippet",
      "text": "The five-year deadline passed in July 2019 with roughly a fifth of the work done; the contractor filed for arbitration and the BMC wound the programme up in March 2021 after paying about 47 crore rupees",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-116ac777187214ac",
       "src-f2e68171662bd995"
      ],
      "supportNote": "The March 2021 report states that the contractor filed for arbitration after the five-year deadline expired in July 2019, that about 20 per cent of the work was complete and that about 47 crore rupees had been paid.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a5ee5976d633f0df",
      "field": "impact",
      "text": "The national auditor found that at the July 2019 deadline only 18.60% of the contract had been executed by monetary value",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f2e68171662bd995"
      ],
      "supportNote": "The report quotes the audit directly: in terms of overall monetary value it was only 18.60 per cent.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ca9f7cf912f9c8e8",
      "field": "impact",
      "text": "Mumbai still supplies 3,950 million litres a day against demand of 4,200, and an independent estimate puts non-revenue water at 38% including all unmetered consumption, against a national norm of 15%",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a66fe7bd8ba2f4d3"
      ],
      "supportNote": "The think-tank analysis gives supply of 3,950 MLD against demand of 4,200 MLD and estimated non-revenue water of 38 per cent including unmetered consumption, against a national norm of 15 per cent.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ed3e39efe0d806e3",
      "field": "lesson",
      "text": "The instruments Mumbai runs today, SCADA and metered-district pilots, are not attributed by any source to this programme",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-aaaf93db2a966a82"
      ],
      "supportNote": "The 2026 trade survey of what the corporation operates lists SCADA, district-metered-area pilots, automated meter reading and smart-meter pilots without attributing any of it to this contract.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-f2e68171662bd995",
      "title": "Mumbai Live — CAG questions BMC on 24x7 water supply project",
      "url": "https://www.mumbailive.com/en/civic/cag-questions-bmc-on-'24x7water-supply-project'-only-18-work-done-against-deadline-of-july-2019-44806",
      "publisher": {
       "name": null,
       "domain": "mumbailive.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-36b7787fe144b77f",
       "clm-dc7e8358d63c211e",
       "clm-a5ee5976d633f0df"
      ],
      "temporal": {
       "publishedAt": "2020-01-31",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Reports the national audit finding: 2014 award to Suez Environnement India at 276 crore rupees, only 18 per cent of work (18.60 per cent by monetary value) complete at the July 2019 deadline, pilot wards T (Mulund) and H West (Bandra).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20250723014731/https://www.mumbailive.com/en/civic/cag-questions-bmc-on-'24x7water-supply-project'-only-18-work-done-against-deadline-of-july-2019-44806",
       "archivedAt": "2025-07-23",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-116ac777187214ac",
      "title": "Construction World — BMC to wind up 24-hr water supply project (9 March 2021)",
      "url": "https://www.constructionworld.in/urban-infrastructure/wastewater-and-sewage-treatment/bmc-to-wind-up-24-hr-water-supply-project/26100",
      "publisher": {
       "name": null,
       "domain": "constructionworld.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-36b7787fe144b77f",
       "clm-dc7e8358d63c211e"
      ],
      "temporal": {
       "publishedAt": "2021-03-09",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Confirms the March 2021 discontinuation: the contractor filed for arbitration after the deadline expired; about 20 per cent of work complete; about 47 crore rupees paid; lists the ten contracted services including GIS mapping and leakage detection.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a66fe7bd8ba2f4d3",
      "title": "Observer Research Foundation — Tackling water stress in Mumbai (6 June 2023)",
      "url": "https://www.orfonline.org/expert-speak/tackling-water-stress-in-mumbai",
      "publisher": {
       "name": null,
       "domain": "orfonline.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-ca9f7cf912f9c8e8"
      ],
      "temporal": {
       "publishedAt": "2023-06-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent think-tank analysis: supply of 3,950 MLD against 4,200 MLD demand; estimated non-revenue water of 38 per cent including unmetered consumption as of 2016, against a national norm of 15 per cent; slums receive 45 lpcd against 135 lpcd in residential buildings.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-aaaf93db2a966a82",
      "title": "Indian Infrastructure — Modernising Systems: ULB initiatives to strengthen water networks (4 June 2026)",
      "url": "https://indianinfrastructure.com/2026/06/04/modernising-systems-ulb-initiatives-to-strengthen-water-networks/",
      "publisher": {
       "name": null,
       "domain": "indianinfrastructure.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-ed3e39efe0d806e3"
      ],
      "temporal": {
       "publishedAt": "2026-06-04",
       "updatedAt": "2026-06-16",
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-26",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Current-state check on what BMC operates after the programme: SCADA plus district-metered-area pilots, automated meter reading, smart-meter pilots. None of it is attributed by the source to this programme, so none is claimed here.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 5,
     "claimsMapped": 5,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 4,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}