 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "mumbai-grid-islanding",
  "title": "Mumbai Power Grid Islanding Scheme",
  "canonicalUrl": "https://1001smartcities.org/projects/mumbai-grid-islanding/"
 },
 "currentRevisionId": "2026-08-21-source-dates",
 "revisions": [
  {
   "id": "2026-08-20-claim-baseline",
   "createdAt": "2026-08-21T12:15:00Z",
   "effectiveAt": "2026-07-26",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 5 claims and 8 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:2eb6872779ce636061906b024c6380206447c575dde6afc784697d508cc0eb31",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:e2f80ad73b0ca3bb1baf9271f2f5b30f9608e03f935e75b80c7e131bef9f109a",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "media",
     "timeline": {
      "started": 1981,
      "ended": null
     }
    },
    "governance": {
     "operator": "Tata Power and Adani Electricity Mumbai with BEST, coordinated by the Maharashtra State Load Despatch Centre and the Western Regional Power Committee",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d401d828acc6409d",
      "field": "snippet",
      "text": "Since 1981 Mumbai's grid has been able to cut itself loose: automatic under-frequency and rate-of-change-of-frequency relays disconnect the city from Maharashtra's transmission network during an outside disturbance, leaving the generation inside the city to carry the load",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-49d914ab784d8899",
       "src-b92ef17261de3407",
       "src-8ecd66a889868e35"
      ],
      "supportNote": "The 2012 account dates the scheme to a 1981 design by the incumbent utility, later upgraded with the other city utilities. The independent technical account establishes the mechanism: the separation runs on reverse-power and under-frequency relays rather than centralised control, and describes a February 2005 separation as the fourteenth successful islanding since 1997. The authority document carries the relay settings and under-frequency load shedding for the scheme as it stands.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c9dc69fbbe485728",
      "field": "snippet",
      "text": "It failed publicly on 12 October 2020. After transmission lines tripped near Kalwa the island did separate, but collapsed within minutes with roughly 1,394 MW of local generation against more than 2,800 MW of demand, and parts of the city stayed dark for 2 to 15 hours",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a58ef384d5d8d698",
       "src-c71e5e8c9fe5e34e"
      ],
      "supportNote": "The trade reconstruction dates the sequence — a 400 kV line tripping at 09:58 on a phase fault, two more at 10:05 — and records that the island separated but could not hold a sudden 1,000 MW drop, with about 1,394 MW available against more than 2,800 MW of demand and an outage lasting 2 to 15 hours. The peer-reviewed 2022 analysis examines the cascade and why the unintended island did not survive, citing a high rate of change of frequency.",
      "caveat": "The journal blocked automated fetching; the paper's existence and subject were confirmed via indexing services, so it corroborates the mechanism rather than supplying the figures.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-25050ab26a79df23",
      "field": "snippet",
      "text": "India's power minister attributed the outage to human error, Maharashtra's energy minister backed a cyberattack theory, and the firm that had reported Chinese-linked intrusions into India's power sector called the link to the blackout unsubstantiated",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db82b733c4427c4a"
      ],
      "supportNote": "The fact-check separates the three claims: the security firm's February 2021 report on a China-linked group, which itself called the link between the outage and the malware unsubstantiated; the state energy minister endorsing the cyberattack reading; and the union power minister stating that two investigating teams found human error.",
      "caveat": "The entry records the disagreement and does not resolve it.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-868d419761a6c1ad",
      "field": "snippet",
      "text": "Tata Power asked IIT Bombay to rework the scheme, and a revised multi-level version was conceptually agreed among the utilities and grid operators in January 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0572af0207776db7",
       "src-8ecd66a889868e35"
      ],
      "supportNote": "The utility said the scheme needed to be relooked because embedded generation of 1,877 MW is now less than half of peak demand, and engaged the institute to study modifications. The authority document, dated January 2025, describes the multi-level islanding covering both city utility systems and records that the revised scheme was conceptually agreed at a meeting on 17 January 2024.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b082d3c668fffefe",
      "field": "impact",
      "text": "27 of 37 major grid disturbances since 1981 were ridden out on the Mumbai island (utility figures reported in 2012; not independently audited)",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-49d914ab784d8899"
      ],
      "supportNote": "The 2012 account carries the utility's record of 37 major grid disturbances since 1981, of which 27 were survived.",
      "caveat": "Utility figures relayed by the press and labelled as such in the entry. A later outage in February 2022 — a 220 kV line tripping, two units tripping and about 850 MW of Mumbai load lost — shows the 2020 event was not a one-off.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8ecd66a889868e35",
      "title": "Western Regional Power Committee — Mumbai Islanding System",
      "url": "https://www.wrpc.gov.in/allfile/160120251433497512Mumbai%20IS.pdf",
      "publisher": {
       "name": null,
       "domain": "wrpc.gov.in",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d",
       "clm-868d419761a6c1ad"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Authority document for the scheme as it stands (file dated January 2025): multi-level islanding covering the Tata Power and Adani Electricity systems, under-frequency load shedding and relay settings, Mumbai peak demand around 4,000 MW against about 1,877 MW installed inside the city, and the revised scheme conceptually agreed at a meeting on 17 January 2024.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b92ef17261de3407",
      "title": "IEEE Spectrum — How to Blackout-Proof a City",
      "url": "https://spectrum.ieee.org/how-to-blackoutproof-a-city",
      "publisher": {
       "name": null,
       "domain": "spectrum.ieee.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent technical account (2007): the separation runs on reverse-power and under-frequency relays, not centralised control; describes a February 2005 separation as the 14th successful islanding since 1997.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-49d914ab784d8899",
      "title": "Business Standard — Mumbai's envied power islanding (Aug 2012)",
      "url": "https://www.business-standard.com/article/economy-policy/mumbai-s-envied-power-islanding-112080602006_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d",
       "clm-b082d3c668fffefe"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Scheme designed by Tata Power in 1981 and later upgraded with the other city utilities; carries the utility record of 37 major grid disturbances since 1981 with 27 survived.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a58ef384d5d8d698",
      "title": "Power Line — Tripping Up: emerging concerns in the wake of the Mumbai power outage",
      "url": "https://powerline.net.in/2020/11/04/tripping-up/",
      "publisher": {
       "name": null,
       "domain": "powerline.net.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c9dc69fbbe485728"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade-press reconstruction of 12 October 2020: a 400 kV line tripped at 09:58 on a phase fault, two more followed at 10:05; the island separated but could not hold a sudden 1,000 MW drop, with about 1,394 MW available against more than 2,800 MW of demand; outage lasted 2 to 15 hours.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c71e5e8c9fe5e34e",
      "title": "IEEE Access — Dynamic Modeling and Cascade Failure Analysis of the Mumbai Grid Incident of October 12, 2020",
      "url": "https://ieeexplore.ieee.org/document/9738644",
      "publisher": {
       "name": null,
       "domain": "ieeexplore.ieee.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c9dc69fbbe485728"
      ],
      "temporal": {
       "publishedAt": "2020-10-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Peer-reviewed analysis (2022) of the cascade and of why the unintended island did not survive, citing a high rate of change of frequency. Publisher blocked automated fetch; existence and subject confirmed via indexing services.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0572af0207776db7",
      "title": "Business Standard — After Mumbai's power outage, Tata Power to upgrade the city's islanding system (21 Oct 2020)",
      "url": "https://www.business-standard.com/article/companies/after-mumbai-s-power-outage-tata-power-to-upgrade-city-s-islanding-system-120102101636_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-868d419761a6c1ad"
      ],
      "temporal": {
       "publishedAt": "2020-10-21",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Tata Power says the scheme needs to be relooked because embedded generation of 1,877 MW is now less than half of peak demand, and engages IIT Bombay to study modifications.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-db82b733c4427c4a",
      "title": "BOOM — Mumbai's 2020 power blackout: cyberattack or not?",
      "url": "https://www.boomlive.in/fact-file/mumbai-power-blackout-cyberattack-china-12220",
      "publisher": {
       "name": null,
       "domain": "boomlive.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-25050ab26a79df23"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fact-check separating the claims: the security firm's February 2021 report on a China-linked group, which itself called the link between the outage and the malware unsubstantiated; the state energy minister endorsing the cyberattack reading; the union power minister stating two investigating teams found human error.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e017fe578f24208d",
      "title": "Business Standard — Mumbai power outage: Maharashtra sends notice to Tata Power (March 2022)",
      "url": "https://www.business-standard.com/article/companies/mumbai-power-outage-maharashtra-sends-notice-to-tata-power-122031101361_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "On a later outage in February 2022: a 220 kV line tripped, two units tripped and about 850 MW of Mumbai load was lost. Shows the 2020 event was not a one-off.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 5,
     "claimsMapped": 5,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-21-source-dates",
   "createdAt": "2026-08-22T02:29:00Z",
   "effectiveAt": "2026-07-26",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:ca6fd87795e8e0ca55b7953a0783ad0991fc408708a2b461df5d450e66200e93",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:2c671f9a3eae8a387d7685dbed68acb7c87b9ea3aad1462534b7be9d3d9690bb",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "media",
     "timeline": {
      "started": 1981,
      "ended": null
     }
    },
    "governance": {
     "operator": "Tata Power and Adani Electricity Mumbai with BEST, coordinated by the Maharashtra State Load Despatch Centre and the Western Regional Power Committee",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d401d828acc6409d",
      "field": "snippet",
      "text": "Since 1981 Mumbai's grid has been able to cut itself loose: automatic under-frequency and rate-of-change-of-frequency relays disconnect the city from Maharashtra's transmission network during an outside disturbance, leaving the generation inside the city to carry the load",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-49d914ab784d8899",
       "src-b92ef17261de3407",
       "src-8ecd66a889868e35"
      ],
      "supportNote": "The 2012 account dates the scheme to a 1981 design by the incumbent utility, later upgraded with the other city utilities. The independent technical account establishes the mechanism: the separation runs on reverse-power and under-frequency relays rather than centralised control, and describes a February 2005 separation as the fourteenth successful islanding since 1997. The authority document carries the relay settings and under-frequency load shedding for the scheme as it stands.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c9dc69fbbe485728",
      "field": "snippet",
      "text": "It failed publicly on 12 October 2020. After transmission lines tripped near Kalwa the island did separate, but collapsed within minutes with roughly 1,394 MW of local generation against more than 2,800 MW of demand, and parts of the city stayed dark for 2 to 15 hours",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a58ef384d5d8d698",
       "src-c71e5e8c9fe5e34e"
      ],
      "supportNote": "The trade reconstruction dates the sequence — a 400 kV line tripping at 09:58 on a phase fault, two more at 10:05 — and records that the island separated but could not hold a sudden 1,000 MW drop, with about 1,394 MW available against more than 2,800 MW of demand and an outage lasting 2 to 15 hours. The peer-reviewed 2022 analysis examines the cascade and why the unintended island did not survive, citing a high rate of change of frequency.",
      "caveat": "The journal blocked automated fetching; the paper's existence and subject were confirmed via indexing services, so it corroborates the mechanism rather than supplying the figures.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-25050ab26a79df23",
      "field": "snippet",
      "text": "India's power minister attributed the outage to human error, Maharashtra's energy minister backed a cyberattack theory, and the firm that had reported Chinese-linked intrusions into India's power sector called the link to the blackout unsubstantiated",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-db82b733c4427c4a"
      ],
      "supportNote": "The fact-check separates the three claims: the security firm's February 2021 report on a China-linked group, which itself called the link between the outage and the malware unsubstantiated; the state energy minister endorsing the cyberattack reading; and the union power minister stating that two investigating teams found human error.",
      "caveat": "The entry records the disagreement and does not resolve it.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-868d419761a6c1ad",
      "field": "snippet",
      "text": "Tata Power asked IIT Bombay to rework the scheme, and a revised multi-level version was conceptually agreed among the utilities and grid operators in January 2024",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-0572af0207776db7",
       "src-8ecd66a889868e35"
      ],
      "supportNote": "The utility said the scheme needed to be relooked because embedded generation of 1,877 MW is now less than half of peak demand, and engaged the institute to study modifications. The authority document, dated January 2025, describes the multi-level islanding covering both city utility systems and records that the revised scheme was conceptually agreed at a meeting on 17 January 2024.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b082d3c668fffefe",
      "field": "impact",
      "text": "27 of 37 major grid disturbances since 1981 were ridden out on the Mumbai island (utility figures reported in 2012; not independently audited)",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-49d914ab784d8899"
      ],
      "supportNote": "The 2012 account carries the utility's record of 37 major grid disturbances since 1981, of which 27 were survived.",
      "caveat": "Utility figures relayed by the press and labelled as such in the entry. A later outage in February 2022 — a 220 kV line tripping, two units tripping and about 850 MW of Mumbai load lost — shows the 2020 event was not a one-off.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-8ecd66a889868e35",
      "title": "Western Regional Power Committee — Mumbai Islanding System",
      "url": "https://www.wrpc.gov.in/allfile/160120251433497512Mumbai%20IS.pdf",
      "publisher": {
       "name": null,
       "domain": "wrpc.gov.in",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d",
       "clm-868d419761a6c1ad"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Authority document for the scheme as it stands (file dated January 2025): multi-level islanding covering the Tata Power and Adani Electricity systems, under-frequency load shedding and relay settings, Mumbai peak demand around 4,000 MW against about 1,877 MW installed inside the city, and the revised scheme conceptually agreed at a meeting on 17 January 2024.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b92ef17261de3407",
      "title": "IEEE Spectrum — How to Blackout-Proof a City",
      "url": "https://spectrum.ieee.org/how-to-blackoutproof-a-city",
      "publisher": {
       "name": null,
       "domain": "spectrum.ieee.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d"
      ],
      "temporal": {
       "publishedAt": "2007-06-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent technical account (2007): the separation runs on reverse-power and under-frequency relays, not centralised control; describes a February 2005 separation as the 14th successful islanding since 1997.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-49d914ab784d8899",
      "title": "Business Standard — Mumbai's envied power islanding (Aug 2012)",
      "url": "https://www.business-standard.com/article/economy-policy/mumbai-s-envied-power-islanding-112080602006_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d401d828acc6409d",
       "clm-b082d3c668fffefe"
      ],
      "temporal": {
       "publishedAt": "2012-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Scheme designed by Tata Power in 1981 and later upgraded with the other city utilities; carries the utility record of 37 major grid disturbances since 1981 with 27 survived.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a58ef384d5d8d698",
      "title": "Power Line — Tripping Up: emerging concerns in the wake of the Mumbai power outage",
      "url": "https://powerline.net.in/2020/11/04/tripping-up/",
      "publisher": {
       "name": null,
       "domain": "powerline.net.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c9dc69fbbe485728"
      ],
      "temporal": {
       "publishedAt": "2020-11-04",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade-press reconstruction of 12 October 2020: a 400 kV line tripped at 09:58 on a phase fault, two more followed at 10:05; the island separated but could not hold a sudden 1,000 MW drop, with about 1,394 MW available against more than 2,800 MW of demand; outage lasted 2 to 15 hours.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c71e5e8c9fe5e34e",
      "title": "IEEE Access — Dynamic Modeling and Cascade Failure Analysis of the Mumbai Grid Incident of October 12, 2020",
      "url": "https://ieeexplore.ieee.org/document/9738644",
      "publisher": {
       "name": null,
       "domain": "ieeexplore.ieee.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c9dc69fbbe485728"
      ],
      "temporal": {
       "publishedAt": "2020-10-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Peer-reviewed analysis (2022) of the cascade and of why the unintended island did not survive, citing a high rate of change of frequency. Publisher blocked automated fetch; existence and subject confirmed via indexing services.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-0572af0207776db7",
      "title": "Business Standard — After Mumbai's power outage, Tata Power to upgrade the city's islanding system (21 Oct 2020)",
      "url": "https://www.business-standard.com/article/companies/after-mumbai-s-power-outage-tata-power-to-upgrade-city-s-islanding-system-120102101636_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-868d419761a6c1ad"
      ],
      "temporal": {
       "publishedAt": "2020-10-21",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Tata Power says the scheme needs to be relooked because embedded generation of 1,877 MW is now less than half of peak demand, and engages IIT Bombay to study modifications.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-db82b733c4427c4a",
      "title": "BOOM — Mumbai's 2020 power blackout: cyberattack or not?",
      "url": "https://www.boomlive.in/fact-file/mumbai-power-blackout-cyberattack-china-12220",
      "publisher": {
       "name": null,
       "domain": "boomlive.in",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-25050ab26a79df23"
      ],
      "temporal": {
       "publishedAt": "2021-03-04",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fact-check separating the claims: the security firm's February 2021 report on a China-linked group, which itself called the link between the outage and the malware unsubstantiated; the state energy minister endorsing the cyberattack reading; the union power minister stating two investigating teams found human error.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e017fe578f24208d",
      "title": "Business Standard — Mumbai power outage: Maharashtra sends notice to Tata Power (March 2022)",
      "url": "https://www.business-standard.com/article/companies/mumbai-power-outage-maharashtra-sends-notice-to-tata-power-122031101361_1.html",
      "publisher": {
       "name": null,
       "domain": "business-standard.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2022-03-11",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-22",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "On a later outage in February 2022: a 220 kV line tripped, two units tripped and about 850 MW of Mumbai load was lost. Shows the 2020 event was not a one-off.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 5,
     "claimsMapped": 5,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}