{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "la-dwp-smart-meters",
  "title": "LADWP Advanced Metering Infrastructure Rollout",
  "canonicalUrl": "https://1001smartcities.org/projects/la-dwp-smart-meters/"
 },
 "currentRevisionId": "2026-09-27-baseline-popular",
 "revisions": [
  {
   "id": "2026-09-27-baseline-popular",
   "createdAt": "2026-09-27T13:10:00Z",
   "effectiveAt": "2026-09-27",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 9 claims and 8 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:bb0456a4fc530f808eef2ca02de1a796cee33347e0a885cdefa4875846ac7adf",
   "snapshot": {
    "asOf": "2026-09-27",
    "projectFingerprint": "sha256:b7281962d38d71bcf84169016dc4fe73641991cf5d382fce2538b6870948e1b1",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2025,
      "ended": null
     }
    },
    "governance": {
     "operator": "Los Angeles Department of Water and Power (LADWP)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "utility",
     "fundingDescription": "LADWP ratepayer revenue; the 52,000-meter Smart Grid LA pilot (switched on in 2014) was co-funded by a US Department of Energy grant",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-8ebdaf54285750ea",
      "field": "snippet",
      "text": "The largest municipal utility in the United States",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9fac2559821632d6",
       "src-f455045cdf292220"
      ],
      "supportNote": "Both the utility's own release and its meter vendor describe LADWP as the nation's largest municipal utility.",
      "caveat": "This is how the utility describes itself; no independent ranking is cited.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-db9cbde15a0280cb",
      "field": "snippet",
      "text": "began replacing its more than 1.5 million electric meters in September 2025, starting in Lincoln Heights",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-488f889787cf7f5b",
       "src-7830ad6951d24739"
      ],
      "supportNote": "The ratepayer advocate reports the mid-September start in Lincoln Heights and the meter count; the operator page confirms installation began in fall 2025.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5edc41ee1a395e1e",
      "field": "snippet",
      "text": "seventeen years after California authorised the investor-owned Southern California Edison next door to roll out its own",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-895d1eb2adc7b0af"
      ],
      "supportNote": "The CPUC approved Southern California Edison's advanced metering deployment and cost recovery in Decision 08-09-039 of September 2008.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cb5dd9e754ec8b91",
      "field": "snippet",
      "text": "LADWP is owned by the city and sits outside the state programme that authorised those rollouts",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-9fac2559821632d6",
       "src-e24fbcf773465673"
      ],
      "supportNote": "LADWP calls itself a municipally-owned utility; the CPUC page describes the authorisation as covering the state's investor-owned utilities.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-caa46badef7b5c6c",
      "field": "snippet",
      "text": "Its 700,000 water meters are not part of it.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-488f889787cf7f5b"
      ],
      "supportNote": "The ratepayer advocate states that water meters are not part of the current effort.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-49df87a82de7bf4d",
      "field": "impact",
      "text": "About a million of LADWP's more than 1.5 million electric meters were still read by hand when the rollout began, alongside 700,000 manually read water meters",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-488f889787cf7f5b"
      ],
      "supportNote": "The September 2025 post gives all three figures.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-18b4d4007c4edece",
      "field": "impact",
      "text": "In 2026 the city's ratepayer advocate put full deployment on the power side at five to eight years or more, with no timeline yet for water.",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f37eb782ab96d5e1"
      ],
      "supportNote": "OPA's 2026 recommendation states the duration for power and that water timelines are undefined.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1a0de5c63e68914b",
      "field": "lesson",
      "text": "California authorised the investor-owned rollouts in 2008, but that authorisation covered only the investor-owned utilities",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-895d1eb2adc7b0af",
       "src-e24fbcf773465673"
      ],
      "supportNote": "The 2008 decision approves SCE's deployment; the CPUC page names only investor-owned utilities as authorised.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cd0a4645b2fc9996",
      "field": "lesson",
      "text": "the city-run utility next door started in 2025",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-7830ad6951d24739"
      ],
      "supportNote": "The operator states it would begin deploying advanced metering infrastructure in 2025.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-488f889787cf7f5b",
      "title": "LA Office of Public Accountability / Ratepayer Advocate — LADWP's next smart meter project (17 September 2025)",
      "url": "https://opa.lacity.gov/blog/ladwps-next-smart-meter-project-full-potential-and-it-can-unlock-utility-transformation-more",
      "publisher": {
       "name": null,
       "domain": "opa.lacity.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db9cbde15a0280cb",
       "clm-caa46badef7b5c6c",
       "clm-49df87a82de7bf4d"
      ],
      "temporal": {
       "publishedAt": "2025-09-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The anchor source, by the city's independent ratepayer watchdog. Verbatim: 'Starting in mid-September, homes and businesses in some areas of the Lincoln Heights neighborhood will begin receiving the next generation'; 'With more than 1.5 million electric meters, about a million of which are read manually'; 'other 700,000 manually read water meters'; 'While water meters are not part of the current effort'; 'it will take several years before all customers are upgraded'. OPA states it is 'encouraged by the utility's measured and integrated approach' and commits to 'keeping a watchful eye on rate impacts'.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7830ad6951d24739",
      "title": "LADWP — Advanced Metering Infrastructure (operator)",
      "url": "https://www.ladwp.com/who-we-are/power-system/advanced-metering-infrastructure",
      "publisher": {
       "name": null,
       "domain": "ladwp.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-db9cbde15a0280cb",
       "clm-cd0a4645b2fc9996"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The operator's programme page: advanced meters, an RF mesh network and a data-management system, building on the 2013 Smart Grid LA programme; installation began in fall 2025 and replaces electromechanical, radio-read and cellular meters.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e24fbcf773465673",
      "title": "CPUC — The Benefits of Smart Meters (regulator)",
      "url": "https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/infrastructure/the-benefits-of-smart-meters",
      "publisher": {
       "name": null,
       "domain": "cpuc.ca.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-cb5dd9e754ec8b91",
       "clm-1a0de5c63e68914b"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Establishes the comparison and its limit: the state smart-meter programme covers only 'the state's investor owned utilities' — SCE 'approximately 5.3 million new Smart Meters', SDG&E '1.4 million electric Smart Meters and 900,000 natural gas meters', PG&E 'approximately 5 million electric meters and 4.2 million natural gas meters'. Municipal utilities are not addressed on the page.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-895d1eb2adc7b0af",
      "title": "CPUC Decision D.08-09-039 — Approving Settlement on Edison Advanced Metering Infrastructure Deployment (September 2008)",
      "url": "https://docs.cpuc.ca.gov/PUBLISHED/FINAL_DECISION/91154.htm",
      "publisher": {
       "name": null,
       "domain": "docs.cpuc.ca.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-5edc41ee1a395e1e",
       "clm-1a0de5c63e68914b"
      ],
      "temporal": {
       "publishedAt": "2008-09-18",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Dates the neighbouring investor-owned rollout: the CPUC authorised Southern California Edison's Edison SmartConnect deployment and its rate recovery in September 2008, seventeen years before LADWP began its own.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-6b587867f5c7761d",
      "title": "LAist / KPCC — LADWP flips the switch on 52,000 smart meters (1 July 2014)",
      "url": "https://laist.com/news/kpcc-archive/ladwp-flips-the-switch-on-52-000-smart-meters",
      "publisher": {
       "name": null,
       "domain": "laist.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2014-07-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "LADWP switched on 52,000 smart meters on 1 July 2014 under Smart Grid LA, funded by a $60 million US Department of Energy grant and $60 million from the utility. A demonstration, not a rollout: the utility did not start a citywide replacement until 2025.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-9fac2559821632d6",
      "title": "LADWP News — LADWP receives $60 million for smart grid project",
      "url": "https://www.ladwpnews.com/ladwp-receives-60-million-for-smart-grid-project/",
      "publisher": {
       "name": null,
       "domain": "ladwpnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8ebdaf54285750ea",
       "clm-cb5dd9e754ec8b91"
      ],
      "temporal": {
       "publishedAt": "2009-11-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Operator confirmation of the federal Smart Grid Demonstration Program award behind the 2013 pilot, with research partners UCLA, USC and Caltech/JPL.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f455045cdf292220",
      "title": "Itron — LADWP expands contract (11 June 2014)",
      "url": "https://investors.itron.com/news-releases/news-release-details/los-angeles-department-water-and-power-expands-contract-itron",
      "publisher": {
       "name": null,
       "domain": "investors.itron.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8ebdaf54285750ea"
      ],
      "temporal": {
       "publishedAt": "2014-06-11",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Vendor announcement, used only for scale context: 'approximately 40,000 additional cellular advanced meters and data collection software', to be 'installed over three years', supporting time-of-use and net time-of-use metering. Confirms LADWP's pre-2025 advanced metering was in the tens of thousands, not the millions. Vendor source — no deployment count is taken from it.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f37eb782ab96d5e1",
      "title": "LA Office of Public Accountability — Recommendation: treat AMI as a cornerstone investment (2026)",
      "url": "https://opa.lacity.gov/recommendation-treat-ladwps-investment-advanced-metering-infrastructure-ami-cornerstone-investment",
      "publisher": {
       "name": null,
       "domain": "opa.lacity.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-18b4d4007c4edece"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-09-27",
       "dossierCreatedAt": "2026-09-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A recommendation from the city's ratepayer advocate, part of its 2026 report on utility affordability: LADWP has begun a multi-year deployment for the power system, full deployment will take five to eight years or more, and water has no timeline yet.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 8,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 5,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
